1
VII California Team Meeting
  • August 2, 2007
  • PATH

2
Agenda Items
  • Recent Events
  • TRB Meeting and Demo Report out on lessons
    learned
  • 10 MCNUs Delivered
  • Website Update
  • Related  Recent equipment reliability issues
  • Installation Schedule  Need to secure 'hard'
    schedule and resources
  • ATIS / Map Applications Development Status
  • Longer Term Items
  • VII Coalition Visit in December
  • POC?
  • Incremental progress on HA-NDGPS in Northern
    California
  • Other?
  • Next Meeting

3
Recent Events
  • Joel VanderWerf
  • Artawood Chitamitara

4
Demo Notes, 1
  • Minor issues
  • Screen saver on laptops
  • Poor visibility of 511 image on small screen
  • In-vehicle signage display
  • Doesn't recognize 315 heading messages as
    northbound
  • Shows SFO messages when driving southbound at 101
    RSUs
  • Display is too brief
  • About 2 sec, then back to VII screen

5
Demo Notes, 2
  • Incomplete 101 signage (we asked too late)?
  • Probe display (DSRC shuttle)?
  • MapPoint crashes
  • google map version not available yet

6
VII California Website
  • Whats New
  • VIICA Newswire
  • Potential importance to inform stakeholders and
    other interested parties of our activities in
    VIICA
  • TRB Article
  • New Pictures (TRB and ITSA Palm Springs)
  • New features and look
  • www.viicalifornia.org

7
Equipment Reliability Issues
  • Joel VanderWerf

8
RSE Health
  • Updated firmware on most EVDO modems
  • Since then, they have been reliable
  • Still need to do Curtner eventually
  • The 2 T1 lines have been good
  • The 1 GPRS is OK
  • Denso WRMs have been mostly OK
  • Replaced WRM power supply at Page Mill
  • Sniffers work at Calif. and Page Mill

9
Page Mill
  • Packet loss is still a mystery
  • Swapped everything
  • Cables, WRM, pc104 (fan was bad)?
  • Still lose packets on wire to WRM
  • Usually 0, but brief spikes to 50
  • Sometimes seems to depend on queuing of large
    packets (even a 200 byte signage)?
  • Sometimes seems to depend on temperature
  • We're still running tests
  • It's usable

10
During Demo
11
Better than early July!
12
Design and Installation
  • Surveying of the potential sites is in progress
  • Dumbarton bridge has been selected for the toll
    application
  • More sniffers will be built
  • Further research is needed for intersection sites
    with 170 controller
  • Need to built a computer that relays the sniffer
    data to MCNU Technocom RSU on the signal pole

13
Procurement Process
  • PATH is working to procure the following for
    the future installations
  • MCNU Technocom RSUs
  • Fiber and power cables
  • NEMA boxes, antennas, brackets, different cables,
    different connectors, and so on
  • Fiber converters and GPS units

14
Installation Schedule
  • Ashkan Sharafsaleh

15
Whats next with installations?
  • 10 MCNU have arrived
  • Two will be used only for lab tests for time
    being
  • Work has started on hardware add-ons and software
    development
  • Most of hardware needs have been procured
  • GPS antennas have not yet (but preferred GPS IDd)

16
RSE at Dumbarton Bridge
  • Relatively easy installation
  • Need to install the cabinet and bring power to it
  • Need to install a pole
  • Need to install a conduit
  • Need to order a NEMA box to host the backhaul
    unit (Digi-Router)
  • No need for fiber cable
  • No major software development

17
Proposed Next Installations and Dates
18
12th Ave
  • 4 Autoscope cameras with 2 on each side of the
    main street
  • Advance detection
  • Stop-line detection
  • LT vehicle detection

19
Proposed Installations (cont)
  • What to do with 5 Remaining MCNUs?
  • New location vs retrofit
  • Intersection vs freeway
  • I-280
  • Expanding the testbed to Burlingame (Floribunda
    ECR)
  • If District 4 resources are available, we can
    install these 5 MCNUs by the end of November

20
ATIS / Map Applications Development Status
  • Tom Saul

21
Longer Term Items
  • Discussion

22
Longer Term Items
  • VII Coalition Visit in DecemberPOC?
  • Incremental progress on HA-NDGPS in Northern
    California
  • Other?

23
Next Meeting?
Write a Comment