Title: Humble Beginnings


1
Humble Beginnings
  • Expanding basic Quality Tools into the EMS

2
Statistical Process Control
  • Controlling processes based on statistical
    measures of key process characteristics. The
    goal is to reduce variation in the process and
    thereby improve the quality and consistency of
    the output.

3
What does that mean?
  • Analyze the process
  • What should be happening?
  • What is happening?
  • Common Cause Variation
  • Achieve control
  • Maintain the process
  • Monitor the process to detect and act upon
    special cause variation
  • Improve the process
  • Understand and reduce common cause variation

4
What does that look like?
Incoming pH
Each swing in pH chemical addition
  • Real Time SPC - the initial picture
  • The Goal Post Mindset - top and bottom of the
    graph indicate internal control limits, set
    within regulatory limits
  • No discernable trends all common cause
    variation

5
and over time
  • If you turn SPC on its ear, you can measure
    process capability (Cpk) over time.
  • This allows you to measure the potential for
    performing outside your specification limits

6
So what do you do with data?
  • Analyze the causes of variation
  • Incoming pH?
  • Temperature?
  • Additives?
  • Flow rates?
  • Feed rates?
  • Feedback loops?

Wastewater pH
Ask What can we control? What effect will
that have?
7
What does it look like now?
  • Made minor changes to the pump feed rates - cost
    0
  • Raised set point -- potential to exceed upper
    spec had dropped to 0 from 3213 ppm
  • Reduced chemical costs
  • But, that was only the beginning

8
The Long-term Impact
  • Monitor changes
  • Investigate causes and respond
  • Fix problems instead of fixing blame
  • Improve other processes
  • Cleaner chemical use
  • Water use / reuse

Culture Change!
9
Lessons Learned
  • We had data but we didnt have information
  • Never assume people have understanding of the
    tools just because theyre there. Plan for
    cross-training and replacement training.
  • Dont despise the day of small beginnings