A Primer on Scheduling with Order Management - PowerPoint PPT Presentation

1 / 40
About This Presentation
Title:

A Primer on Scheduling with Order Management

Description:

OM: Auto Push Group Date. OM: Authorized to Override ATP. OM: Scheduling Role ... Used in repair scenario, to ship repaired item. 11.5.9 Scheduling Enhancements ... – PowerPoint PPT presentation

Number of Views:42
Avg rating:3.0/5.0
Slides: 41
Provided by: steve143
Category:

less

Transcript and Presenter's Notes

Title: A Primer on Scheduling with Order Management


1
(No Transcript)
2
(No Transcript)
3
(No Transcript)
4
(No Transcript)
5
(No Transcript)
6
A Primer on Scheduling with Order Management
  • NCOAUG Training Day
  • November 7, 2005

7
Agenda
  • Overview of Features and Terminology
  • ATP Calculation Samples
  • Scheduling Process
  • Deployment Options
  • Setup for ATP Based on Collected Data
  • ATP Based on Planning Data
  • 11.5.9 Enhancements
  • 11.5.10 Enhancements

8
Scheduling Goals
  • Determine when items will be available to promise
    to a customer
  • Schedule the shipment or arrival of order lines
    based on availability
  • Reserve on-hand inventory to sales order lines.
  • Schedule based on
  • Individual order lines
  • Groups of order lines
  • Ship sets
  • Arrival sets
  • Configurations

9
Key Features
  • Schedule at multiple points
  • Specify by customer if request date is ship or
    arrival
  • Automatically set scheduled ship / arrival date
    based on calculated ATP date
  • Use shipping networks to determine delivery
    transit time
  • Scheduling control by transaction type
  • View availability from multiple warehouses at one
    time
  • Group lines by arrival sets
  • Schedule across orders

10
Terminology
  • Request Date / Request Date Type
  • Latest Schedule Limit
  • Scheduled Ship / Arrival Date
  • Ship Set / Arrival Set
  • Promise Date
  • Reservation
  • Reservation Time Fence
  • Sourcing

11
Calculating ATP
  • Required Inputs
  • Ordered item
  • UOM / quantity
  • Request date
  • Warehouse can be specified or derived
  • ATP results display
  • Warehouse
  • Request Date Qty
  • Available
  • On-hand Qty
  • Qty Reservable
  • Request Date
  • Available Date
  • Error Message
  • Substitute Item

12
ATP Calculation Result
13
ATP Calculation Result
14
ATP Calculation Result
15
ATP Calculation Result
16
Scheduling Process
  • Action performed on a line or group of lines
  • Determines the warehouse for the order line
  • Determines the schedule ship / arrival date,
    delivery lead time and the shipping method.
  • Makes the line visible to the planning
    applications and consumes supply for the item.
  • Reserves the line if schedule ship date is within
    the reservation time fence
  • Schedule by Ship or Arrival Date
  • Automatically return Schedule Ship Date if Latest
    Acceptable Date is satisfied

17
Scheduling Options
  • Autoschedule
  • Schedule when line is saved
  • Controlled by OM Autoschedule, or Transaction
    Type
  • Manual by Order Line or Order Header
  • Workflow
  • Scheduling Concurrent Program
  • Scheduling Across Orders Scheduling Organizer
  • View Scheduling attributes across multiple order
    lines
  • Perform scheduling actions on lines across orders
  • Access control by profile option OM Scheduling
    Role

18
Scheduling Organizer
19
Scheduling Organizer
20
Ways to View ATP Results
  • Standard or Quick Order Entry forms
  • Scheduling Organizer
  • ATP Inquiry (Schedule ? ATP Inquiry)
  • Pricing and Availability

21
ATP Inquiry
22
ATP Inquiry
23
Pricing Availability
24
Pricing Availability
25
Deployment Options
  • Deployment without Advanced Supply Chain Planning
    (ASCP)
  • Use supply and demand data from transactional
    systems
  • ATP Based on Collected Data
  • Deployment with ASCP
  • Availability calculated from ASCP plan output
  • ATP Based on Planning Output

26
ATP Based on Collected Data
  • Backwards compatibility with 10.7 and 11
  • Introduces concept of Data Collection
  • ATP options
  • Basic ATP
  • Single-level Supply Chain ATP
  • Product Family ATP
  • Configuration ATP
  • Demand Class ATP

27
ATP Based on Planning Output
  • More realistic supply picture
  • Enhanced flexibility and control capabilities
  • ATP options
  • Basic ATP
  • Multi-level Supply Chain ATP
  • Product Family ATP
  • Configuration ATP
  • Demand Class ATP
  • Allocated ATP
  • End Item Substitution

28
Configuration Options
  • Single node or two-node
  • Single node applicable for non-ASCP
    configurations
  • Two-node configurations recommended for ASCP
    configurations
  • Source node is where the ERP applications,
    including Order Management, reside
  • Destination is where ASCP resides
  • Database links between Source and Destination
  • Instances are defined for each Source of
    collected data
  • For ASCP deployments, Instances are defined on
    the Destination node

29
Setup ATP Based on Collected Data
  • Define instance
  • Enable Check ATP attribute on relevant items
  • Define ATP rules
  • Item-specific or Inventory Org default
  • Past due Supply and Demand days
  • Infinite Supply Time Fence
  • ATP by Demand Class
  • Demand and Supply Sources

30
ATP Rules
31
Setup ATP Based on Collected Data
  • Profile options
  • OM Schedule Lines on Hold
  • OM Autoschedule
  • OM Reservation Time Fence
  • OM Auto Push Group Date
  • OM Authorized to Override ATP
  • OM Scheduling Role
  • INV Capable to Promise
  • MSC Enable ATP Summary Mode
  • Define Transit Times
  • Warehouse to Internal Location
  • Warehouse to Region
  • Warehouse to Zone

32
Setup ATP Based on Collected Data
  • Scheduling Level on Transaction Types
  • ATP Only
  • No Reservations
  • Allow all Scheduling Actions
  • Inactive Demand with Reservations
  • Inactive Demand without Reservations

33
Setup ATP Based on Collected Data
  • Single-level Supply Chain ATP
  • Sourcing Rules to define priority of warehouse
    search
  • Associate Sourcing Rules to Items / Customer in
    Assignment Set
  • Set MRP ATP Assignment Set profile option

34
Setup ATP Based on Collected Data
  • Configuration ATP
  • For availability and lead time check on ATO Model
    and components
  • ATO Model / Option Class
  • Check ATP None
  • Component ATP Material
  • Mandatory Components / Optional Items
  • Check ATP Material or None
  • Component ATP None
  • For ATO Model lead time check
  • Check ATP, Component ATP None
  • MSC ATP Enforces Lead Times for ATP Models

35
ATP Based on Planning Data
  • Multi-level Supply Chain ATP
  • Checks for availability at multiple bills of
    material levels and at multiple supply chain
    locations
  • Drills down into resource and supplier capacities
    as necessary.
  • Considers lead / transit times across entire
    supply chain
  • Allocated ATP
  • Allocate supply by sales channels or customers
  • Allocation can be equal to the forecast of the
    sales channel or customer, or a portion of supply
    when supply is constraint.

36
11.5.9 Scheduling Enhancements
  • Override ATP
  • Access controlled by profile option
  • Explicit Override ATP flag on order line
  • Scheduling Across Orders
  • Scheduling Organizer
  • Perform scheduling actions on multiple order
    lines
  • Inactive Demand Scheduling Levels
  • Lines neither scheduled, nor made visible as
    demand
  • Schedule Ship Date Request Date
  • Used in repair scenario, to ship repaired item

37
11.5.10 Scheduling Enhancements
  • Global Order Promising for ATO Configurations
  • Source warehouse can be derived
  • Line Level Ship / Arrival Sets
  • OM Assign new set for each line
  • Default all lines to one Ship / Arrival set
  • Publish Plan Results to Order Management
  • Only for ASCP installs
  • Changes to supply / demand picture can alter
    schedule ship dates
  • ASCP can update Schedule Ship / Arrival Date,
    Warehouse, Delivery Lead Time, Ship Method

38
11.5.10 Scheduling Enhancements
  • Reservation Enhancements
  • New reservation modes supported by Reserve Orders
    concurrent program
  • Partial include / exclude lines with existing
    partial reservations
  • Percentage reserve a specified percent of the
    requested quantity for each line selected
  • Fair Share weighted allocation of available
    quantity across selected lines
  • Run simulations using Reservation Sets created in
    Scheduling Organizer

39
11.5.10 Scheduling Enhancements
  • Scheduling Flexibility Controls new options to
    direct various scheduling activities
  • Request Date change to force reschedule
  • Ship Method change to force reschedule
  • Promise Date use static, dependent on Request /
    Ship Date, manually
  • Latest Acceptable Date warnings ignore without a
    warning, ignore with warning, honor

40
Thank You!
  • Bob Brown
  • Practice Director Demand Chain Services
  • bbrown_at_darc.com
  • (847) 519-3160
Write a Comment
User Comments (0)
About PowerShow.com