Title: Wednesday, September 8, 2004


1
River Road AreaSewer Improvements
  • Wednesday, September 8, 2004

2
Todays Meeting
  • Program Update
  • River Road Improvements
  • Next Meeting Date

3
Program Update Financing
  • Took out 34 million in loans this year
  • Extremely favorable terms
  • Paid back after project is completed
  • Borrowed as needed
  • Will take out approximately 110 million in loans
    next year
  • Not selling bonds this year
  • Doing well with low-interest loans

4
Program Update Metroparks Partnership
  • Wetland mitigation
  • If we use wetlands for construction (mooring
    basin at plant) must restore wetlands 2 to 1
  • City reimbursing Metroparks for 45,00 toward
    purchase of 10 acres of land in Spencer Township
    (Angola and Eber Roads)
  • Stream bank mitigation
  • 12,000 for improvements at SideCut Metropark

5
River Road SSOs
  • 4 in the River Road Area
  • Must be eliminated by November of 2006
  • Stiff penalties for missed deadlines

6
Past Ongoing River Road Area Projects
  • Sanitary sewer study 2000/2001
  • Storm sewer study 2002/2003
  • Sewer lining 2002/ongoing
  • Copland storm sewer 2002
  • Beverly/Medford storm sewer 2004/ongoing

7
Proposed River Road Area Projects
  • Underground Equalization Basin River Road Park
  • Underground Pump Station River Road Park
  • New Force Main Sewer Brookford Drive
  • New Relief Sewer Beverly and River Road
  • Beverly Pump Station West of Trail

8
Project Schedules
  • Projects will be built concurrently
  • Construction bids October/November 2004
  • Break Ground Spring 2005
  • Completed by November 2006

9
Equalization Basin
  • Underground facility
  • 3 million gallon storage capacity
  • 120 ft. x 240 ft.
  • 17 ft. deep
  • To be located at River Road Park ball diamond
    site
  • Tanks from old Toledo Water Plant currently
    located there

10
Equalization Basin
11
EQ Basin Issues Discussion
  • Construction Access Road
  • From River Road to site (between playgrounds)
  • Reduces amount of construction equipment entering
    site from Brookford
  • Could disrupt playground areas

12
Issues and Discussion
  • Baseball field
  • Will be lost for one season due to construction
  • Alternative options for replacement of the field

13
River Road Park Pump Station
  • Located next to Equalization Basin
  • Bulk of facility underground
  • Control panel above ground
  • Will pump waste from River Road sewer to
    equalization basin

14
Beverly Pump Station
  • Underground with control panel(s) above ground
  • Will pump waste from Beverly sewer to new EQ
    basin

15
Force Main Sewer
  • New sewer from Beverly pump station on west side
    of Anthony Wayne Trail down Brookford to the
    Equalization Basin
  • To be located on south side of Brookford
  • Shouldnt disturb street except for crossings
    at OLPH and Island Avenue
  • Traffic maintained
  • Will work with committee to minimize disruption

16
New Relief Sewers
  • From River Road, Midland or Hemlock down River
    Road to Brookford
  • New water line will be installed at same time
  • Should help resolve water pressure problems
  • Preferred sewer location is in east lane of River
    Road

17
New Relief Sewers
  • On Beverly from Brookford to Medford
  • Both relief sewer lines should help alleviate
    basement flooding in area

18
Future Meetings
  • Next meeting date?
  • Best time and location?