1
Congregational Meeting
Master Plan / Phase I Review
Lutheran Church of the Incarnation, Davis
w
m
b
April 6th , 2008
a r c h i t e c t s
2
Process to adopting a Facility Master Plan
Congregation votes on plan May 18 to begin Phase
I drawings, and to appoint a Building Committee
September 2005 Congregational Meeting approves
hiring an architect to develop a site plan of
all present and future facilities.
Come one, come all. Take a look. Then come to
a QA forum. Then vote May 18.
September 2006 Architect selection process WMB
chosen. Needs Assessment Survey completed by
LCI committees identifies substantial needs.
April 2008 Church Council presents site plan,
and preliminary drawings, for consideration by
the committees and congregation
Fall 2007 Interim Building Committee coordinates
feasibility study with architects
2007-2008 WMB Architects develop master site
plan with 4 building phases
3
p r o c e s s
  • Needs Assessment Programs
  • Master Plan/Schematic Design
  • City Use Permit / Design Review Process
  • Architecture Construction

4
a r c h i t e c t u r a l p r o g r a m
5
E x i s t i n g S i t e P l a n
Arthur Street
Russell Blvd
6
Proposed Master Plan
7
Phase I -
8
Phase I - New Worship Center Exterior Concept
South-east Elevation - (from Russell Blvd
intersection )
9
Phase I - New Worship Center Exterior Concept
North Elevation - (from parking lot)
10
Phase I - New Worship Center Exterior Concept
East Elevation - (from Arthur St.)
11
Phase I - New Worship Center Exterior Concept
South Elevation - (from Russell Blvd)
12
Lutheran Church of the Incarnation - Master Plan

13
S u s t a i n a b i l i t y o p p o r t u n i t
i e s
Construction Activity Pollution Prevention
Construction Waste Management- divert from
disposal
Alternative Transportation- public systems,
bicycle storage/changing rooms
Stormwater design - quality control
Reduce Heat Island Effect - Roofing/hardscape
surfaces
Storage and collection of recyclables
Materials Specifications Recycled content
regional rapidly renewable low-emitting
materials- adhesives, sealants, paints
14
S u s t a i n a b i l i t y o p p o r t u n i t
i e s
Water Efficient Landscaping
Water Use Reduction - Building Systems
On-Site Renewable Energy - solar panels, wind
turbines, geo-thermal
Green Power - Contracting for renewable energy
source
Controllability of Building Systems -
Lighting/Thermal comfort
Optimize Thermal Energy Performance-
Building systems
Optimize use of daylight -
15
Phase I -
3.5 million project budget range
16
D e v e l o p m e n t S c h e d u l e
May 2008
Congregational approval of Master Plan/ Phase I
City Use Permit and Design Review process
July 2008 2009
Final Design and Construction Documents
July Nov 2009
Dec 2009 March 2010
Building Permit - City Review process
Bidding/ Negotiation
Feb / March 2010
April 2010
Phase I Construction
17
Lutheran Church of the Incarnation - Master Plan