Upcoming Dates Accumulator Ring: - PowerPoint PPT Presentation

1 / 11
About This Presentation
Title:

Upcoming Dates Accumulator Ring:

Description:

Collimator lifting fixture design/weight reduction. Collimator end shielding redesign. ... Lifting fixture modifications Status. Production Schedule. 17D120 ... – PowerPoint PPT presentation

Number of Views:76
Avg rating:3.0/5.0
Slides: 12
Provided by: bnl
Category:

less

Transcript and Presenter's Notes

Title: Upcoming Dates Accumulator Ring:


1
Upcoming Dates Accumulator Ring
  • ASAC Review September 24
  • Collimator/Extraction Area/Design
    Reviews /Installation October 9, 10
  • FY2003 Budget issues
  • Magnet Specification List Individual Magnet
    Parameter Sheets
  • Meeting Friday 10/4 130 p.m. S. Tepikian and
    M. Hemmer
  • Review them and SIGN THEM OFF
  •  
  • Monthly Report Today
  • DOE Review November 13

2
ASAC Review
  • Ring specific comments presented by the
    committee
  • Findings and fixes (shimming) on magnets are in
    good progress -- continue.
  • It would be good to verify proper field in the
    presence of vacuum pipe (e.g. HEBT magnet
    measurement with beam pipe although Ted
    claimed the pipe non-magnetic.
  • Good to see ring half cell to be tested and
    delivered to ORNL looking forward to it.
  • RF work as presented is well done.
  • Vacuum work as presented is well done more to
    go.
  • Looking forward to see planned, detailed field
    measurement of injection chicane magnet near H-
    electron stripping foil in comparison with 3D
    mapping.
  • Endorse the proposal of a new view port and video
    monitoring of carbon-carbon electron collector
    near injection.
  • Good work is done on impedance reduction of the
    extraction kickers more needs to be done on
    impedance measurement of RF cavities.
  • Continue to explore beam loss mitigation
  • Fast feedback, as presented by J. Galambos, can
    be tried e.g. to position beam on the stripping
    foil
  • Electron cloud (a) procure and install elements
    that can disturb ring vacuum system, including
    clearing electrode at injection and solenoid
    windings at collimation section (b) procureother
    devices as budget allows
  • Comments on collective effects and others are to
    be included in the written summary (not
    presented).

3
Hechler, Hunter, Murdoch Visit Agenda
  • Wednesday, October 9
  •  
  • 745-830 911B Small Conference Room
  • BNIP phone conference W. Birkholz, J.
    Brodowski, G. Mahler
  •  
  • 830-900 911B Small Conference Room
  • Danfysik phone conference W. Birkholz, J.
    Brodowski, G. Mahler
  •  
  • 900 930 911B Small Conference Room
  • Tesla phone conference W. Birkholz, J.
    Brodowski, G. Mahler
  •  
  • 930 1100 911B Small Conference Room
  • Injection area layout and installation. J.
    Brodowski, C. Pai, L. Russo
  •  
  • 1100 1200 911B Large Conference Room
  • General ME meeting J. Tuozzolo
  •  
  • 100 300 911B Small Conference Room
  • Ring Collimators and Moveable Scraper, HEBT
    Collimator Design, and RTBT Collimator
    Update H. Ludewig, N. Simos, J. Brodowski

4
Hechler, Hunter, Murdoch Visit Agenda
  • Thursday, October 10
  •  
  • 815 900 902 Assembly Area
  • Magnet Testing, Measurement, and Assembly
    Schedule for Ring ½ Cell Magnets
  • R. Anderson, S. Seberg, W. Birkholz, J. Jackson,
    G. Mahler, V. Badea, J. Tuozzolo, P. Wanderer.
  •  
  • 900 1000 817 Video Conference Room
  • Assembly Schedule for Ring ½ Cell Magnets
  • R. Anderson, S. Seberg, W. Birkholz, G. Mahler,
    V. Badea, J. Tuozzolo
  •  
  • 1000 1200 817 Video Conference Room
  • RTBT/HEBT Magnet/Vacuum Installation
  • J. Rank, D. Weiss, D. Hseuh
  •  
  • 100 300 817 Video Conference Room
  • Extraction Straight Section Layout, Magnet Design
    Review, and Installation
  • J. Rank, C. Pai

5
Collimators
  • Friday 1100 Weekly Meeting in the EAG Conference
    Room
  • Collimator lifting fixture design/weight
    reduction.
  • Collimator end shielding redesign.
  • Procurement STATUS Weekly Phone Conference
  • HEBT Collimator Beam Line Layout
  • HEBT Stripper Design
  • HEBT Momentum Collimator Installation/Shielding
    layout.
  • Ring Moveable Collimator Installation Layout.
  • Moveable Shield Drawings to Back Correction fy
    2003 procurement

6
HEBT Magnets and Beamline
  • HEBT Dipole
  • 1, 2, 3, 4, 5, and 6 at ORNL
  • ORNL has measured the magnets to 1 8D408 at ORNL
  • HEBT 12Q45 Quadrupole/16CD20 Corrector
    Requisition
  • Production delivery of 17 magnets Water fitting
    repair
  •  
  •  
  • HEBT/RTBT 27CD30 Corrector
  • NETC Ordering Material
  •  
  •  
  • HEBT/RTBT 21Q40 Quadrupole
  • Phase II Magnets to be shipped to BNL for
    measurement.
  • Magnet Sled and Stand Design in Checking

7
Ring Magnets
  • 902 ½ Cell Assembly Area
  • Shipping Date for 1 - October 31, 2002 -
    assembly status
  • Water fitting repairs
  • Lifting fixture modifications Status
  • Production Schedule
  •  
  • 17D120
  • ITF quality progress magnets measured and
    accepted.
  • Spare magnet shipping?
  •   
  • 21Q40 Quadrupole 17 magnets in house (1)
  • 21 cm Production Measurement Schedule
  • Tesla Schedule
  • Water fitting repairs  
  • 26Q Quadrupole Requisition
  • 2nd Iteration Chamfer Machining Status.

8
Ring Magnets
  • 30Q Quadrupole Requisition Contract w/BNIP
  • Magnet Measurement Completion Date
  • BNIP Production Schedule
  • 21S26 High Field Sextupole
  • Coil Modification ECN
  •  
  • 26S26 High Field Sextupole
  • Drawings in checking
  • SOW and Spec.
  • 27CDM30 Corrector (3) 29 in house
  • All Magnets Received
  • Ready Production Measurement
  •  

9
Ring Magnets
  • 21CO26 Corrector (4) 8 in house
  • Ready for production measurement
  • 21CS26 Corrector (2) 8 in house
  • Production Measurement Status Estimate to
    Complete
  • 41CDM26 Corrector
  • Magnet Measurement Complete - Approved for
    Production
  • 36CDM26 Corrector
  • 1st article delivered September 13, 2002
  • Failed Hi-Pot
  • Return to Vendor ASAP this week

10
Special Injection Magnets Overall Design Layout
  • Injection Septum Magnet
  • Status both magnets assembled?
  • Testing Complete - Magnet Travelers
  • Injection Dump Septum Magnet Injection Chicane
    Magnets 2, 3
  • NETC Contract, PCR for spares.
  •  
  • Thin Foil Mechanism Testing and Acceptance
    7/30/02.
  • Thick (Injection Dump) foil design status.
  • Injection Magnet 4 Acceptance Testing Status
  • Injection Magnet 1 Complete Redesign.
  • Injection Kicker Magnets
  • 1st articles ready for testing Coated Ceramic
    Chamber??
  • Ferrite Order Status, Ceramic Chamber Order
    Status
  • RFQ to Shops

11
Special Extraction And RTBT Magnets
  • Extraction Kicker Magnets
  • Design Status
  • Design Review
  •   
  • Lambertson Magnet
  • Design Status
  • Design Review
  • RTBT Magnets and Line DESIGN REVIEW
  •  
  • 17D244 Magnet Procurement 7/31/02 Need New
    Scheduled Date
  • 36Q85
  • Raynor fabrication of Magnet Cores STATUS
  • Coil Material Delivered