Title: The LAr ROD Project and Online Activities


1
The LAr ROD Projectand Online Activities
  • Arno Straessner
  • and Alain, Daniel, Annie, Manuel, Imma, Eric,
    Jean-Pierre, ...
  • Journée de réflexion du DPNC
  • Centre de Rencontre de Cartigny
  • July 2nd, 2004

2
The ATLAS Liquid Argon Calorimeter
  • The ROD motherboard is used in the readout of all
    Liquid Argon calorimeter components and in the
    Tile Calorimeter
  • The construction of the Calorimeters is well
    advanced
  • Start first commissioning phase in March 2005

Insertion of the Solenoid in the Barrel Cryostat
3
The ROD Motherboard
Calculated Quantities
FEB raw data
32 bits at 40 MHz
16 bits at 80 MHz
  • Each ROD board is connected to 8 Front-End boards
  • The incoming data is analysed in the Processing
    Units
  • The output data is sent via Transition Modules to
    a Read-Out PC

4
Prototype and System Testing at the EMF
  • 9 prototypes built
  • Extensive tests on single board
  • level in Geneva
  • Complete system test
  • Back-End Crate Test at EMF
  • Many tests done
  • Data transfer in normal and
  • staging mode (2 PUs)
  • 3 boards operated simultanously
  • Power consumption
  • More important tests to be done until September
  • Data transfer at full rate with Optimal Filtering
    and Calibration code
  • Synchronisation with trigger system (TTC)
  • Send real and monitoring data through VME
  • Verify correct hardware functionality / extend
    and debug software

ROD
Injector
PC
Optical splitter
5
Real Data Taking at the Testbeam
  • ROD is used in ATLAS combined
  • testbeam
  • FEB readout of LAr module
  • Readout system like
  • in ATLAS detector
  • Difficult startup phase
  • Many software upgrades

LAr testbeam module
? Crate with 2 ROD boards at combined testbeam
6
Calibration and Normal Data
  • Data is stored by ROS PC
  • Analysis is done with ATLAS
  • software ATHENA
  • First data noise RMS in FEB
  • channels

FT1-FT5 1.0lt?lt1.2
DAC500 27 samples
Calibration pulses
7
Online Monitoring
  • Online monitoring is part of ATHENA software
    package
  • development done by a pool of detector experts
    and online experts
  • Very useful to quickly analyse incoming data
  • Examples

Software test with 2002 TB data
Monitoring at 2004 combined testbeam
8
Status of The ROD Motherboard Project
  • Current activities
  • System tests at EMF and testbeam to finalize the
    design
  • Extension and debugging of the firmware
  • input FPGA, output controller, VME interface
  • Transition to next project phase
  • ROD motherboard production
  • The ROD system had a Production Readiness Review
    last week
  • Main results
  • we can start purchasing the board components
  • The board assembly shall wait until all important
    tests are finished

9
Production Activities In The Near Future
  • Order all components through CERN and store them
  • Find a company for the board assembly ? CERN
    Price Inquiry
  • Order PCB boards
  • Finally 250 ROD motherboards will be assembled
    (April 05)
  • Then we are done? No...
  • Installation of temperature
  • sensors and cooling plates
  • Serial test of 125 modules
  • with test bench in Geneva
  • (March Mai 05)

KO
OK
OK
OK
OK
OK
10
Other Responsibilities
  • Purchase and installation of
  • 161 ROD VME crates
  • We buy the ROD
  • cooling system

11
Summary
  • The ROD prototypes are working well in test stand
    and at test beam ? no hardware changes expected
  • The ROD project is going into production phase
  • Serial testing and assembly in spring 2005 will
    be a demanding task
  • Schedule in time to deliver a ROD system for
    detector commissioning