SAME Meeting - PowerPoint PPT Presentation

1 / 10
About This Presentation
Title:

SAME Meeting

Description:

Engineering News-Record (ENR) - # 2 in Combined Design & CM/Professional Services ... 1 Architectural Design ... for engineering excellence. ... – PowerPoint PPT presentation

Number of Views:33
Avg rating:3.0/5.0
Slides: 11
Provided by: jeg75
Category:
Tags: same | meeting

less

Transcript and Presenter's Notes

Title: SAME Meeting


1
SAME Meeting
  • Savannah Post
  • Heather L. Wishart, P.E. PMP
  • Heather.Wishart_at_Jacobs.com
  • (571)218-1339
  • 26 January 2009

2
Jacobs Overview
  • Full service A/E, PMCM firm
  • Financial Strength - Revenues over 10B
  • Extensive Support Resources
  • 57,000 employees worldwide
  • 5,100 AE Resources in 96 full service US offices
  • Proven Military and Federal Experience
  • Serving the Military for over 70 Years
  • All military branches worldwide
  • Delivering superior value as one of top DoD
    Contractors
  • Strong nationwide support for SAME
  • Ranked 1 by the Building Design Construction
    Magazine
  • Annual Design / Construction Survey, Top 300
    Giants in 2008

3
South Atlantic Division Program at a glance
  • Army Air Force Design Support to Centers of
    Standardization
  • Key Representative Projects include
  • 318M, 535K SF Regional Security Operations and
    Signal Center, Ft Gordon, GA
  • 50M Battle Command Training Centers, Ft Bragg,
    NC
  • 80M Brigade Combat Team (Heavy) Complex, Ft
    Stewart, GA
  • 18th Fire Brigade/ Battalion Company Ops
    Facilities, Ft Bragg, NC
  • 35M Unmanned Aerial Surveillance Facilities, Ft
    Stewart, GA
  • USAR Armed Forces Reserve Center, Raleigh, NC
  • Warrior Training Center Master Plan, Ft Benning,
    GA
  • Child Development Center, Ft Bragg, NC

4
South Atlantic Division Program at a glance
  • Army Air Force Design Support to Centers of
    Standardization
  • Our Value Added Objectives have been
  • Help implement Standardization Army
    Transformation goals
  • Integrate life cycle costs in design and
    construction of facilities
  • Incorporate Sustainable Design Principles (LEED
    Silver)
  • Foster innovative, creative cost effective design
    solutions
  • Criteria driven functional / operational
    requirements take priority
  • Implement Installation Design Guides
  • Utilize Value-based Design Charrettes
  • All designs developed in BIM

5
CENAB (Corps of Engineers - North Atlantic -
Baltimore) BRAC Program
  • Jacobs CENAB BRAC program at a glance
  • Three A/E contracts with CENAB totaling 100M
  • 52M capacity currently utilized across 40 BRAC
    Task Orders
  • Projects at Ft. Belvoir, Aberdeen, Ft. Drum,
    Picatinny, New Cumberland
  • Includes infrastructure design at Ft. Belvoir,
    Independent Design Technical Reviews at NGA,
    full design for C4ISR, ARL FUZE

Supporting Baltimore, Philadelphia, New York
Europe in the North Atlantic Division - 40M
remaining capacity for BRAC related projects
6
Ft Bliss Army Transformation Program Land
Development and Engineering / Integrator Contract
4.2B 300 Projects 10M SqFt Multi-Year Execution
2,500 Acres for 4 BCTs Community
Facilities 1,000 Acres for Infill for CAB
7
Ft Bliss Army Transformation Program Land
Development and Engineering / Integrator Contract
  • Primary objective
  • On-time delivery of Troop Ready facilities (a
    place to sleep, a place to work and a place to
    train)
  • Multiple challenges impeded execution
  • Focus on top priorities fix variables
  • Use of Interactive Planning to facilitate
    informed decision making
  • Integration of acquisition strategy, schedule
    strategic approach
  • Development of transportable standards

8
The Troop Ready Program Delivering Fully
Functioning World Class Facilities in Support of
Our Troops
  • Turn-key Operation that Requires
  • Early Involvement
  • Intricate Scheduling
  • Continuous Communication, Collaboration, and
    Cooperation
  • Result is On Time Delivery of Fully Functioning
    Facilities to Commands
  • Fort Bliss, TX
  • Developed program to deliver 100 fully
    usable/move in ready facilities a Battalion set
    at a time
  • First set of Troop Ready facilities received 10
    days ahead of schedule.

9
LA Guard Katrina Reconstruction Program
  • Services range from A/E D-B Pkgs to PMCM
  • Mobilized assessment teams, 35 people within 3-5
    days
  • Obligated 520M in MILCON SRM within 9 months
  • 14 MILCON Projects, 58 SRM Projects
  • 480M awarded within 8 months Design Charrette
    to Const. Award
  • Projects included Site Infrastructure, Aviation
    Vehicle Maintenance, Barracks/Dormitory, Training
    Admin Facilities
  • Assisted LA Guard in selection management of
    local AEs
  • Construction oversight of D-B contractors

10
A Recognized Industry Leader
  • 57,000 Employees Worldwide with 300 Technical
    Disciplines
  • Over 10 Billion in Annual Revenue
  • Fortune Magazine - 1 Most Admired Firm
  • Building Design Construction- 1
    Engineer/Architect- 2 Government Building
    Design- 3 Top 500 Design Firms
  • Engineering News-Record (ENR)- 2 in Combined
    Design CM/Professional Services
  • Interior Design Magazine- Top 100 Design
    Giants 1 in Federal Interior Design
  • Washington Business Journal- 1 Architectural
    Design

We are the only 5 time winner of the American
Council of Engineering (ACEC) Grand Conceptor
Award for engineering excellence.
Write a Comment
User Comments (0)
About PowerShow.com