Title: DataNetworks
1Data-Networks Interfaces Working Group
MeetingKevin Moore Derek Bracknell Christopher
HallProgram Manager Chair
Program Coordinator
2Preliminaries
- Emergency Procedures
- Group Photograph
- Lunch
3Agenda - Morning
- Introductions
- The ASSC in 2005
- Document Review
4Agenda - Afternoon
- Future Programme/New Initiatives/High Speed 1553B
- Members Feedback
- AOB
5Introductions
- Name
- Organisation
- Area of Expertise
6Christopher Hall
- ASSC Coordinator
- Engineer ERA Safety Engineering Group
- Specialising in Military Aircraft
- Previously RA HISE University of York
- MSc Computer Science Dept UoY
7Welcome to ERA
8Safety Engineering
- System Safety Engineering and Consultancy
- 18 permanent staff
- Orders 1.9m
- Specialist Services
- independent safety advice and audits
- through-life safety management consultancy
- safety case preparation
- hazard and risk identification
- software assurance
- training
9Built on a Solid Technical Heritage
- ERA Technology
- A Chelton Group Company(Part of Cobham plc)
- 20m turnover
- 250 staff
- Specialist Engineering Consultancy
- System Safety and Software Assurance
- EMC Modelling, Test and Consultancy
- Mechanical and Electrical Consultancy
- Antenna and Electronic Systems
- World-class Engineers
- 71 with university degrees
- 43 with post-graduate qualifications
10Cobham Organisation Structure
11Cobham plc Fiscal 2004
- A global aerospace, avionics and flight
operations company - FTSE 125 organisation
- 1.6bn market capitalisation
- 983m turnover
- 146.9m profit
- 1.3bn order book
- gt 9800 employees worldwide
- operating in 5 continents
12Cobham Revenue Analysis
13ASSC Overview
14Setting the Scene
- MoD Declared Aim
- Reduce risk and encourage innovation
- Increase defence industry competitiveness
- Delivering projects within performance, time and
cost parameters - MoD Acknowledge
- Standards provide the fundamental building blocks
in the design, procurement and maintenance of
defence equipment - Important element of MoD procurement strategies
15Setting the Scene
- Avoid 'gold-plated' military equipment
- Greater emphasis on, and willingness to use
industry and commercial standards - In preference to military standards
- However must comply legislation and standards
associated with safety, security and equipment
clearance - MoD Acknowledge
- Standardisation programs
- Selection and application of standards
- Require careful consideration at the earliest
stages of the project life
16Setting the Scene
- Misuse of standardisation strategies lead to
procurement issues - Unacceptable impact on safety, security and the
environmental - Limiting interoperability between services
- Reduced quality, reliability and availability
- Continued dependence on specific vendors,
especially for software support - Bespoke (difficult to maintain) COTS equipment
- Procurement against undesirable specifications
(long term) - Difficulties assessing multiple bids against
various supplier defined standards
17ASSC Program
- ASSC Unique UK MoD and Industry Forum
- 3 year extended contract
- Includes Core Management and agreed Tasks
- Core Management
- Steering Group meetings
- Working Group meetings
- Workshops, seminars and tutorials
- Gathering and disseminating information
pertaining to standards and standardisation
issues - ASSC Website
18ASSC Program
- Agreed Tasks
- Identify issue, requirement, owner and
deliverable - Undertake technical investigations,surveys and
studies - Developing, maintaining and vetting
- Standards
- Guidance Documents
- Informative reports
19ASSC Support Structure
20ASSC Support Structure
Funded for 3 years
Not fully Resourced
21ASSC and Possible Role
Software
Distributed
Distributed
Systems
Systems
Interfaces
Interfaces
Core
Distributed
Distributed
Distributed
Distributed
Systems
Systems
Systems
Systems
Avionics Systems
Electro
Electro
Magnetic
Magnetic
Effects
Effects
Integrated Weapon
Integrated Weapon
Systems
Systems
22ASSC and Possible Role
Software Working Group
23ASSC and Possible Role
Software Working Group
24ASSC and Possible Role
Software Working Group
25 Task Case Study C Survey and Recommendations
26C Survey and Recommendations
- Issue
- The use of C for safety and mission critical
defence applications becoming more prevalent - Certification (SW Clearance) being carried out on
a case-by-case basis. - Requirement
- In order to reduce costs the MoD need to define a
universal process for suppliers and assessors of
these systems - Guidance document to be produced for the
practitioners of C
27Agreed C Task
- Phase I
- Identify the C and C keys issues/players/program
mes - Especially with regard to safety critical/related
systems - Facilitate a forum for key players
- Scope task to produce Best Practice guidance
- In a manner analogous to MISRA's role in the
development of safety related C - Phase II
- Produce a Strategy Paper for general review and
buy-in
28C Survey
- OO methodologies including programming languages
on safety and mission critical system development
and certification - 5 Working Groups/committees identified
- Sub Committee 22 ISO/IEC JTCI
- proposal for the preparation of generic guidance
has recently released - Guidance for Avoiding Vulnerabilities in
Programming Languages - Various programming languages including safety
and security issues - SC-205/WG-71
- Working groups from RTCA (SC205 Committee
Software Considerations) and EUROCAE (WG71
Aeronautical Software) - Collaboration to produce RTCA DO 178C Software
Considerations in Airborne Systems and Equipment
Certification (Ref 9) - One of the issues being addressed is OO techniques
29C Survey
- FAA CAST
- CAST provides guidance for the use of OOT in
avionics systems - Aim for guidance to contribute to DO 178C.
- MISRA C
- Automotive (based) working group produced the
MISRA C Guidelines - International recognized and used standard
- Members (users) expressed interested in producing
a similar guideline for C - Initial MISRA/ASSC meeting successful
- Strategy to produce guideline tailored for MoD
and industry use - Real-Time for Java Expert Group and the
J-Consortium - Involved with the development of a subset of Java
for real-time high integrity applications.
30Observations and Feedback
MISRA C Guideline
Java
Sw Maintenance Certification Legacy
Modular Certification
Is C the starting Point?
Supporting Ada
Sub-committee-22
Sw Certification New Build
RTCA DO 178B Amendment
31C Recommendations
- Provide MoD and Industry Forum
- Provide input into guidance document
requirements, scope and development via a series
of workshops - Early involvement will provide the benefit of
maximizing MoD and industry buy-in to developed
guidance - Monitor and report on progress of guidance
material development - Maintain MoD/Industry awareness through regular
meetings with MoD stakeholders. - ASSC Support Structure
- Provide a basis for contribution to its
development - Disseminate information throughout MoD Integrated
Project Teams (IPT) and industry via workshops
and a software web portal - Provide training in the use of guidance material
- Ensure usability of developed guidance material
32C Recommendations
- MISRA Partnership
- Determine scope of tasks and timescales in
relation to C guidance material development - Determine a strategy for addressing the gaps
between MISRAs agenda and the MoDs requirements
to maximize cross-industry participation and
reduce costs in guidance material development - Sub Committee-22
- Liaison to determine progress and outputs of
developed guidance material - set up a working relationship to enable
cross-flow of ideas - RTCA DO-178B Amendment
- Determine if there is scope for providing UK
input to the development of this update - Liaise with SC-205/WG-71 to achieve this aim
- Monitor the progress with regards to the
inclusion of Object Oriented Technology (OOT)
33Questions or Feedback
34 Task Case Study AfAv Survey and Recommendations
35Setting the Scene
- John Jones DEC(TA) DTS - AFFORDABLE AVIONICS
THE MOD STRATEGY - The following identified as significant risks
- Interface standards are not widely supported.
- Qualification and certification procedures are
unable to certify or re-certify such
architectures, or wholesale re-qualification and
re-certification of the system is required
following upgrade. - Lack of overall MOD co-ordination and acceptance
of common standards. - The failure to use COTS hardware and software.
- Potential difficulties with the adoption of COTS
software - Certification and, importantly, re-certification
are far from guaranteed - Evidence to produce a robust safety case, in
particular for safety or flight critical
software, may not be available for some
commercially available software - Traditional route to certification following
modification may become unaffordable, even for
relatively trivial hardware modifications.
36High Level commitment
ASSC Role or not?
- Review
- Buy-in
- Endorsement
- Policy?
AfAv Strategy
Avionics Champions MoD - Industry
AfAv Reqments
AfAv Requires MoD Focus
Reqmt Statement
37Agreed AfAv Task
- Issue
- Military avionics are expensive to support and
upgrade - Cannot readily employ new technology
- Shrinking research budget and the increasing
scale of the commercial electronics market - MOD cannot dominate the electronics market and no
longer drives technical development - Military avionics systems are becoming
prohibitively expensive to procure, adapt and
support through-life
38Agreed AfAv Task
- Requirement
- Military customer must change its thinking and
approach to avionics system procurement and their
whole life support - Establish management framework and guidelines to
promote and assist with the adoption of advanced
avionics architectures - Ensure avionics are affordable and receptive to
technology insertion - Ensure strategy allows standard hardware and
software employment in both legacy and future
weapon systems.
39Agreed AfAv Task
- Phase 1
- Investigate technical progress and on-going
actions on the MoD Affordable Avionics program - Discussion with stakeholders and UK-funded
project participants - Access findings against MoD's initial roadmap and
implementation plan. - Identify areas where other technical work needs
to be carried out to achieve more affordable
avionics - Consider use of and develop outline for GSN based
Risk assessment model and management tool. - Phase II
- Produce a Strategy Paper for general review and
buy-in
40- Five main areas for consideration
- AfAv Strategy
- AfAv Requirements
- ASSC Role or alternative?
- AfAv Research
- AfAv Application
AfAv Requires MoD Focus
41High Level commitment
- Review
- Buy-in
- Endorsement
- Policy?
AfAv Strategy
AfAv Requires MoD Focus
42High Level commitment
- Review
- Buy-in
- Endorsement
- Policy?
AfAv Strategy
AfAv Reqments
AfAv Requires MoD Focus
Requirement Statement
43High Level commitment
ASSC Role or not?
- Review
- Buy-in
- Endorsement
- Policy?
AfAv Strategy
Avionics Champions MoD - Industry
AfAv Reqments
AfAv Requires MoD Focus
Reqmt Statement
Facilitate Connectivity AfAv Grey book
- Status
- Gap Analysis
- Direct?
AfAv Research
44High Level commitment
ASSC Role or not?
- Review
- Buy-in
- Endorsement
- Policy?
AfAv Strategy
Avionics Champions MoD - Industry
AfAv Reqments
AfAv Requires MoD Focus
Reqmt Statement
Facilitate Connectivity AfAv Grey book
Communication Web site, library Workshops
- Status
- Gap Analysis
- Direct?
- Identify
- Understand
- Communicate
AfAv Research
AfAv Application
45High Level commitment
ASSC Role or not?
- Review
- Buy-in
- Endorsement
- Policy?
AfAv Strategy
Avionics Champions MoD - Industry
AfAv Reqments
AfAv Requires MoD Focus
Reqmt Statement
Facilitate Connectivity AfAv Grey book
Communication Web site, library Workshops
- Status
- Gap Analysis
- Direct?
- Identify
- Understand
- Communicate
AfAv Research
AfAv Application
Develop and maintain 1 Standards 2 Guidelines,
3 Informative Reports
46High Level commitment
ASSC Role or not?
- Review
- Buy-in
- Endorsement
- Policy?
AfAv Strategy
Avionics Champions MoD - Industry
AfAv Reqments
Reqmt Statement
Facilitate Connectivity AfAv Grey book
Communication Web site, library Workshops
- Status
- Gap Analysis
- Direct?
Technology Pull-through Demonstrations
AfAv Research
- Identify
- Understand
- Communicate
AfAv Application
Develop and maintain 1 Standards 2 Guidelines,
3 Informative Reports
47High Level commitment
ASSC Role or not?
- Review
- Buy-in
- Endorsement
- Policy?
AfAv Strategy
Avionics Champions MoD - Industry
AfAv Reqments
Stakeholder Analysis
AfAv MoD Focus
Reqmt Statement
Facilitate Connectivity AfAv Grey book
Communication Web site, library Workshops
- Status
- Gap Analysis
- Direct?
Technology Pull-through Demonstrations
- Identify
- Understand
- Communicate
AfAv Research
AfAv Application
Develop and maintain 1 Standards 2 Guidelines,
3 Informative Reports
48MoD AfAv Sponsors
- Equipment Capability Customer
- Squadron Leader Mil MillerDEC (TA)
- Defence Logistics Organisation (DLO)
- Squadron Leader Steve ClappADAS(AIR) Future
Support Environment - DSTL
- Steve ColmanDirectorate of Concepts and
Technology
49Questions or Feedback