Categorizers CAT Team Workshop - PowerPoint PPT Presentation

1 / 25
About This Presentation
Title:

Categorizers CAT Team Workshop

Description:

to Mather Hospital suffering from 'panic attack' 10/28 TM, than 10 gal. ... Physics, 2003. 06/30 Employee Received an Electric Shock to Hand ... – PowerPoint PPT presentation

Number of Views:41
Avg rating:3.0/5.0
Slides: 26
Provided by: joycemo
Category:

less

Transcript and Presenter's Notes

Title: Categorizers CAT Team Workshop


1
Categorizers (CAT) Team Workshop 2003-04
2
OUR AGENDA!
  • Workshop Goals
  • ORPS Trending
  • Programmatic review
  • Cat Chat
  • Categorizers in Training
  • Electronic Categorizers Form
  • Corrective and Preventive Action Subject Area
  • Keep Your Friendly Local Fac Rep Informed
  • Year in Review
  • Joe Labas, ORPS The Recent Flurry
  • Meeting evaluation and wrap-up
  •       

3
CAT Team Workshop
  • Workshop Goals
  • To EVALUATE and IMPROVE the BNL Occurrence
    Reporting Program.
  • To MAINTAIN a baseline categorization process
    such that reportability decisions are both valid
    and repeatable.

CAT
4
BNL ORPS Report StatusFY 2004 (End of Month)

5
ORPS Corrective Action StatusFY 2004 (End of
Month)
6
BNL ORPS by Calendar Year Report Submitted
As of 11/30
7
CAT Logbook Entries
  • 09/22 RK, miscomm. on when to start and stop
    shooting at firing range
  • 09/24 RK, GERT expires and same TLD worn for
    several months _at_ ATF
  • 09/25 RK, loss of 2000 copper cable lugs _at_
    C-AD
  • 09/26 RK, F-18 hair cont (14,000 dpm) _at_ 901
    radiotracer lab (ON)
  • 10/03 SC, 2 gal spill of antifreeze behind
    bldg. 490
  • 10/10 SM, bag of oil rags found by jogger near
    bldg. 754
  • 10/10 SM, ½ gal spill of oil on pavement behind
    bldg. 490
  • 10/20 KS, Damage (1,700) to rented Hertz dump
    truck
  • 10/22 KS, shutdown of work due to inadequate
    trenching (ON)
  • 10/22 PW, Man lift fire incident _at_ bldg. 974 on
    5/01/03
  • 10/27 RK, OSHA inspector questions scaffolding
    _at_ C-AD
  • 10/28 TM, Male trans. to Mather Hospital
    suffering from panic attack
  • 10/28 TM, gt than 10 gal. oil spill in elevator
    shaft _at_ bldg. 463 (ON)
  • 10/31 TM, unaccountable source discovered at
    Physics (ON)

8
CAT Logbook Entries
  • 11/04 KK, .1 gal spill of antfreeze _at_ bldg. 912
  • 11/05 KK, extremity dose received at 901 gt than
    expected by 3K mrem
  • 11/06 KK, lt 1 gal antifreeze spill from tractor
    to pavement in front of 488
  • 11/07 KK, waste oil shipping papers signed by
    unauthorized person
  • 11/07 KK, unapproved carrier ships PCB cont.
    soil from BNL
  • 11/10--------------------ORPS Re-design
    Implemented at BNL--------------------------
  • 11/10 KK, vial marked natural uranium chips
    found in uncontrolled area
  • 11/13 KK, mechanic suffers lacerated tendon
    (SC3)
  • 11/14 KK, 1 gal oil spill in front of bldg. 197
  • 11/14 KK, Kitchen fire in apartment 7-C
  • 11/17 RK, air monitor alarm BGRR duct service
    bldg., 20mrem for 3
  • 11/18 RK, antifreeze spill from PE mobile
    generator - (SC4)
  • 11/21 RK, NSLS employee hit by car - (SC3)
  • 11/21 RK, Planned killing of 4 deer _at_ FHWA
    because of possible uptake

9
CAT Logbook Entries
  • 11/22 RK, 4 gal oil spill in bldg. 911 pump
    room (concrete and contained)
  • 12/01 MB, possible inadvertent exposure from
    radiograph machine
  • 12/03 SM, laceration to head caused by wind
    blown waste container lid
  • 12/04 SM, FF steps into hole during confined
    space training, minor injury
  • 12/08 SM, worker injured during payloader
    w/push plow operations

10
CAT Logbook Entries (05/1/00 - 12/08/03)
11
CAT Logbook Entries (05/1/00 - 12/08/03)
  • After 1 QTR.
  • 7 out of 28 identified events/conditions were
    deemed reportable 25
  • 2.3 events/conditions reported/week
  • .58 reportable events/week
  • After 14 QTRS.
  • 137 out of 533 events/conditions were deemed
    reportable 26
  • 2.9 events/conditions reported/week
  • .7 reportable/week

12
Programmatic Review
  • Personnel Contamination - 2001
  • 02/14 - (Medical - 801)
  • 04/03 - (Medical - 801)
  • 04/25 - (HFBR)
  • 04/30 - (Chemistry - Radiotracer Lab)
  • 09/19 - (Medical - Personal and Vehicle Cont.
    off-
  • site, UO)
  • 10/30 - (BGRR)
  • 12/05 - (Medical)
  • Personnel Contamination - 2002
  • 05/16 - Shoe contamination (AGS)
  • Personnel Contamination - 2003
  • 01/16 - (WMD - 865)
  • 03/28 - (PET)
  • 09/26 - (PET)

13
Programmatic Review
  • Medical department, 2001
  • 01/11 - Workers not signed in on RWP (RAR)
  • 02/07 - Worker not wearing RWP req. PPE (RAR)
  • 02/14 - Personnel Contamination at 801
  • 04/03 - Personnel Contamination at 801
  • 05/03 - D - Waste syst. pipe leak at 801
  • 06/14 - SS exposed to Para formaldehyde
  • 06/20 - 340 gals of cont. rain water (801)
  • 07/11 - 2 liters of clean water leak into RMA
  • 07/19 - Failure to sign-in on RWP
  • 09/19 - Personal and Vehicle Cont. Off-site, UO
  • 10/18 - P-32 spill due to equip. failure
  • 11/28 - Movement /Use of Radioactive Disp.
    without Proper Surveys
  • 12/05 - Personnel Cont. at 490
  • 12/12 - Rainwater Flooding of Rad. Area at 801

14
Programmatic Review
  • Medical department, 2002
  • 3/05 - Potential release of cont. water from
    bldg. 801
  • 5/10 - L/L analytical lab samples outside of RMA
    in 490
  • 6/20 - Small fire in 490 experimental hood
  • 7/16 - lt 25 ml of Ketamine (controlled substance)
    found in injection vial located in empty lab at
    490
  • 9/04 - Work performed under expired RWP at 490
  • 9/13 - Unqualified worker operates CERF source

15
Programmatic Review
  • Medical department, 2003
  • 01/28 - Loose Inner Electrical Panel cover (at
    490) results in sparking when outer
    door opened
  • 03/06 - Liquid scintillation vials poured into
    5-gallon Carboy outside of the posted
    dispersible area in bldg. 490
  • 01/09 - 120VAC light ckt. (deenergized) damaged
    during core drilling at 490
  • 04/01 - Improper Entry into Oxygen Deficiency
    Hazard Area
  • 09/12 - Worker enters RWP area (490) without
    signing RWP

16
Programmatic Review
  • NSLS, 2002
  • 01/29 - 10 nG Staphyloccal Enterotoxin B crystals
  • 04/19 - Electrical shock
  • 09/22 - Hutch entered without signing RWP
  • 10/02 - Fork truck strikes electrical panel
  • 10/04 - Light beam strikes worker eye
  • 10/06 - Staff (4) on exp. floor without TLDs
  • 12/27 - Carpenter at NSLS strikes energized 24VDC
    fire alarm wiring

17
Programmatic Review
  • NSLS, 2003
  • 01/09 - Fire in cabinet extinguished in lt 3 min.
  • 01/10 - Loss of cooling to sextapole magnet
    results in smoke/precautionary evacuation
  • 03/20 - Guest ignores restricted area posted
    requirements
  • 06/01 - Worker slips and injures arm
  • 09/08 - Injury to hand while operating lathe

18
Programmatic Review
  • Physics, 2003
  • 06/30 Employee Received an Electric Shock to
    Hand
  • 09/24 GERT expires, same TLD worn for several
    months _at_ ATF
  • 10/31 Missing source discovered at Physics

19
Programmatic Review
  • Utilities struck
  • 2000
  • 10/02 - Sanitary line severed near 801
  • 10/27 - Worker hits energized UG cable
  • 11/07 - Strike of 480 volt UG cable
  • 2001
  • 03/27 - UG abandoned comm. cable struck
  • 03/29 - Backhoe scraps steam line
  • 04/26 - Backhoe strike of 208 VAC cable
  • 07/03 - Backhoe strike of 208 VAC cable
  • 09/17 - Van hits fill ass. of LPG tank
  • 09/26 - Phone line damaged when digging near FH
  • 10/03 - 2 in. above grd water line broken by
    bulldozer
  • 11/28 - Backhoe strike of 4 - inch water line

20
Programmatic Review
  • Utilities struck
  • 2002
  • 04/30 - Aband. control wiring hit during sanny
    upgrade
  • 05/07 - GC drilled anchors into elect. duct bank
    near 911
  • 06/06 - Minor utility strike during horiz. boring
    activities
  • 09/28 Truck driver backs into 13.8KV BAF power
    supply
  • 2003
  • 01/08 - Contractor severed low voltage comm.
    cable near bldg. 51
  • 05/08 - Deenergized cable struck during
    excavation near 911A
  • 08/12 - Forklift strikes overhead wire

21
Programmatic Review
  • Transportation Issues
  • 2001
  • 07/27 - Misclass. of PCB Waste shipped
    offsite from BGRR
  • 11/14 - Over-wt. Shipment of LLRW from
    BGRR
  • 11/19 - Misclass. of Rad. Material
    Shipped Offsite from BMRR
  • 2002
  • 06/07 - Damaged 55 gallon drum of
    solidified waste
  • discovered upon arrival at
    Hanford Burial Ground
  • 2003
  • 02/05 - Fuel cask shipped to SRS
    arrives with cont. gt DOT
    limits
  • 11/07 - Waste oil shipping papers signed by
    unauthorized person
  • 11/07 - Unapproved carrier ships PCB
    cont. soil from BNL


22
Programmatic Review
  • Electrical Shock Hazards
  • 2001
  • 10/03 - Electrical Incident at Cyclotron
  • 2002
  • 04/19 - Electrical Shock _at_ NSLS
  • 09/24 - Worker at AGS receives lt24 VDC
  • 2003
  • 06/27 - Electrical Shock _at_ Physics

23
CAT CHAT!
  • Categorizers in training
  • Andy Levine
  • Patti Bender
  • Electronic Categorizers Form
  • Date and time called
  • Cause Codes in support of Performance Analysis
  • Old vs. New system
  • Corrective and Preventive Action Subject Area
  • Keep Your Friendly Local Fac Rep Informed

24
A Year in Review BNL BAO taking the Lead for
Science
  • Attendance _at_ SRS ORPS Workshop (1/22-23/03)
  • Value Added Feedback Through 5 Targeted ORPS
    Re-design Workshops _at_ BNL
  • (2/06/03)
  • (3/11/03)
  • (4/22/03)
  • (5/01/03)
  • (5/29/03)
  • BNL/BAO Provides Feedback during RevCom review
    BNL Attends DC ORPS Training (6/10-12)
  • BNL/BAO provides Beta Testers for new ORPS
    Database
  • ORPS Re-design Implemented at BNL on 11/10/03

25
CAT Team Workshop
  • CAT Team Action Item Review
  • Meeting Evaluation and Wrap-Up

NYCM
Write a Comment
User Comments (0)
About PowerShow.com