Title: Kittil Mine Project


1
Kittilä Mine Project Presentation June, 2006
2
AGNICO-EAGLE MINES LIMITED
  • An international mid tier gold company with
    Operations in Canada and mine development
    projects and exploration activity in Canada,
    Finland, Mexico and the USA
  • Over 30 years of continuous gold production in
    Canada. Since 1972 Agnico-Eagle has produced over
    3.9 million ounces (121 300 kg) of gold.
  • Total gold reserves of 10.4 million ounces (326
    600 kg) in 2005.
  • The LaRonde Mine in Quebec is Canadas largest
    gold deposit in terms of reserves.
  • The Goldex mine project near LaRonde is under
    construction and gold production expected in
    2008
  • Developing the nearby Lapa deposit with gold
    production also for 2008.
  • Developing the Kittila mine in northern Finland,
    with initial gold production in 2008.
  • Recently made the decision to develop the deep
    resources at the LaRonde mine, down to 3 000
    meters.

3
Kittilä Mine
4
INTRODUCTION PROJECT OVERVIEW
  • The Suurikuusikko deposit hosts reserves of 14.2
    million tonnes containing about 2.4 Moz gold (ca.
    75 000 kg)
  • Resources of more than 8 million tonnes
    containing additional 1.2 Moz gold (37 000 kg)
  • The Suurikuusikko deposit will initially be mined
    by open pit followed by and underground mining
    via a decline.
  • Mine construction to start immediately
  • Gold production to begin by mid 2008 and extend
    over 13 years.
  • Ore production 3 000 tonnes per day (ca 1 million
    tonnes per year) fed to a surface processing
    plant.
  • Average annual gold production of 150 000 oz (4
    700 kg)
  • In full production the mine will employ close to
    200 persons.

5
HISTORY
  • Discovered in 1986 by the GTK
  • April 1998, Riddarhyttan Resources AB purchased
    the Suurikuusikko deposit from the MTI
  • Between 1999 to 2005, over 136,000 metres
    exploration drilling completed to investigate the
    main Suurikuusikko auriferous structure
  • In 1999, engineering studies initiated to
    determine the feasibility of a mining project
  • In 2002, Riddarhyttan was granted an
    environmental permit for mining (open pit and
    underground) at Suurikuusikko
  • In 2003, Riddarhyttan was granted a mining
    license
  • In 2004 Agnico-Eagle acquired interest in
    Riddarhyttan
  • Mineral resources increased from 2.0 Moz Gold to
    3.7 Moz Gold in 200-2005
  • In 2005, Agnico-Eagle completed acquisition of
    the remainder of the shares of Riddarhyttan.
    Final FS initiated

6
RESERVES
7
SURFACE PLAN
8
UNDERGROUND LONGITUDINAL VIEW
VIEW WEST
N
North Rouravaara Zone
Suurikuusikko Pit
Access Ramp
Exploration Drift
Suurikuusikko Zone
9
ORE PROCESSING
  • PROCESSING
  • Ore Crushing and Grinding
  • Sulphide Flotation
  • Thickening
  • Sulphur Oxidation in Autoclave
  • C.C.D. Neutralisation
  • Gold Recovery Detox

10
MILL FLOWSHEET