Title: Facility Services Capital Construction
1Facility ServicesCapital Construction
2Capital Construction Summer Projects 09
- Capital Construction Department
- Large Capital Projects
- Projects in Warranty or Under Construction
- Upcoming Projects
- Authorized Projects
- Projects in Design
- Small/Medium Projects
- Go Oregon Stimulus Projects
- Capital Repair Projects
- User Driven Projects
- COPS (Certificates of Participation)
3Capital Construction Summer Projects 09
- Large Capital Projects
- In Warranty or Under Construction
- Arena 200 Million
- College of Education 50.5 Million
- PK Park Baseball Field 18.7 Million
- Central Power Station 101 Million
- School of Music 19.2 Million
- Miller Theater Addition 9.3 Million
- Underground Parking Structure 18.5 Million
4Capital Construction Summer Projects 09
College of Education - 50.5 Million
PM Janet Lobue
5Capital Construction Summer Projects 09
Central Power Station 101 Million
PM Mark Henry
6Capital Construction Summer Projects 09
Miller Theater - 9.3 Million
PM Denise Stewart
7Capital Construction Summer Projects 09
PM Charlene Lindsay
Arena Project - 200 Million
8Capital Construction Summer Projects 09
School of Music
PM George Bleekman
9Capital Construction Summer Projects 09
PK Park Baseball Field - 18.7 Million
PM Charlene Lindsay
10Capital Construction Summer Projects 09
- Large Capital Projects
- Upcoming Projects (Authorized Projects)
- Fenton Hall Renovation (Fall 2009) 8 Million
- Allen Hall Addition/Renov. (Fall 2009) 15
Million - Straub Hall Renovation Ph1 (Spr 2010) 13 Million
- Chiles Center Renovation (Wnt 2009) 1 Million
11Capital Construction Summer Projects 09
- Large Capital Projects
- Upcoming Projects (Projects in Design - 2010
Construction) - Lewis Integrated Science Building 65 Million
- East Campus Residence Hall 60 Million
- Alumni Center 34 Million
- Gilbert Hall Renovation 101 Million
12 Capital Construction Summer Projects 09
- Small/Medium Projects
- Go Oregon! Stimulus Projects
- Capital Repair Projects
- User Driven Projects
- COPS (Certificates of Participation)
13Capital Construction Summer Projects 09
- SMALL/MEDIUM PROJECTS Capital Repair Current
Project List
14Capital Construction Summer Projects 09
- SMALL/MEDIUM PROJECTS Capital Repair Current
Project List - (Continued)
15Capital Construction Summer Projects 09
- SMALL/MEDIUM PROJECTS Capital Repair Current
Project List - (Continued)
16 Capital Construction Summer Projects 09
- SMALL/MEDIUM PROJECTS Go Oregon Stimulus Budget
2.9 Million - Friendly Hall Exterior Renovation
- Pacific Hall Sprinklers (1st and 2nd Floors)
- Transformer Upgrades
- Building 130 interior expansion
- Carpet and Paint Interior upgrades
- Control Valve Installation for Steam and CW
17 Capital Construction Summer Projects 09
Go Oregon Stimulus Friendly Hall Exterior
Renovation 628,000
PM David Mason
18Capital Construction Summer Projects 09
Go Oregon Stimulus Campus Flooring
- Benefited Spaces
- Chapman Hall
- Knight Library
- AAA Library
- Pacific Hall
- Volcanology
- PLC
- Willamette Ste 112
- Allen Hall Rm 304
- Columbia Hall Faculty Offices
- FS Building 130
19Capital Construction Summer Projects 09
Go Oregon Stimulus Campus Flooring
PLC Corridors
AAA Library
PM Dan Wectawski
20Capital Construction Summer Projects 09
Go Oregon Stimulus Campus Painting
- Benefited Spaces
- Pacific Hall Corridors
- Klamath Hall Corridors
- Volanology 2nd Floor Corridor
- Knight Library
- McKenzie Rm 151
- Oregon Hall BAO
- AAA Office 210
- Chapman Hall Faculty Office Space
- Columbia Hall Faculty Office Space
- Allen Hall Rm 304
- Onyx Stair towers
21Capital Construction Summer Projects 09
Go Oregon Stimulus Campus Paint
Chapman Hall
Pacific Hall Lobby
PM Mike Hanneson
22Capital Construction Summer Projects 09
- Small/Medium Projects - Capital Repair
- Notable Projects
- Gerlinger Hall Domestic Water Replacement
- Lawrence Curtain Wall
- Faculty Office Renovations
- Elevator Upgrades
- Pacific Hall
- EC Cares
23Capital Construction Summer Projects 09
- Small/Medium Projects - Capital Repair
- Notable Projects
- Leighton Pool Water Main
- Johnson Hall Awning Replacement
- Facility Services PV Installation
- Life/Safety
- Deady Hall Fire Alarm
- Cascade Sprinkler Addition
- Friendly Hall Fire Alarm
- Pacific Hall Sprinkler Ph1 and Ph2
24Capital Construction Summer Projects 09
- Small/Medium Projects - Capital Repair
Lawrence Hall Curtain Wall Replacement 335,000 Au
gust 3, 2009 Start
PM John Weatherly
25Capital Construction Summer Projects 09
- Small/Medium Projects - Capital Repair
Gerlinger Hall Domestic Water Replacement -
290,000
PM John Weatherly
26Capital Construction Summer Projects 09
- Small/Medium Projects - Capital Repair
Pacific Hall Fire Sprinkler Retrofit - 575,000
(Total)
PM John Weatherly
27Capital Construction Summer Projects 09
- Small/Medium Projects- Capital Repair
- Roofing Projects
- Chapman Hall
- Columbia Hall
- School of Music
- Lawrence Hall
- Music Hall
28Capital Construction Summer Projects 09
Before Ballasted EPDM Roof R-6
Chapman Hall Roof
29Capital Construction Summer Projects 09
After Single Ply Membrane Roof R-27
Chapman Hall Roof 86,000
PM David Mason
30Capital Construction Summer Projects 09
- Small/Medium Projects- Capital Repair
- USER DRIVEN Projects
- STUDENT REC PROJECTS
- North Field Turf Replacement
- Tennis Court Conversion
- Climbing Wall
31Capital Construction Summer Projects 09
- Small/Medium Projects - Capital Repair
- USER DRIVEN Projects
- EMU PROJECTS
- Facility Window Replacement
- Outdoor Research Expansion
- Craft Center
32Capital Construction Summer Projects 09
- Small/Medium Projects - Capital Repair
- USER DRIVEN Projects
- HOUSING PROJECTS
- Barnhart Re-Roof
- Walton Re-roof
33Capital Construction Summer Projects 09
- Small/Medium Projects - Capital Repair
- USER DRIVEN Projects - Various
- Knight Library Special Collections
- AAA Ceramics Canopy and Fence
- McMorran House
- McKenzie Room 151 Remodel
- DPS move to ODOT
- AAA Pacific 209 Lab
- Klamath 179 Lab
34Capital Construction Summer Projects 09
Small/Medium Projects - Capital Repair OTHER USER
DRIVEN Projects
Knight Library Special Collections 307,000
Design Amy Cacan PM David Mason
35 Capital Construction Summer Projects 09
- Small/Medium Projects - Capital Repair
- COPS Notable Projects
- Friendly 214
- Condon 260
- Condon 360
36 Capital Construction Summer Projects 09
Small/Medium Projects COPS
Friendly Hall Classroom 214 Remodel -
150,000
Design Amy Cacan PM John Weatherly
After
Before
37 Capital Construction Summer Projects 09
Small/Medium Projects COPS Friendly Hall
Classroom 214 Remodel
Design Amy Cacan PM John Weatherly
After
Before
38Capital Construction Summer Projects 09
Small/Medium Projects COPS Condon Hall
Classroom 260 and 360 Remodels
Condon Hall Room 260 160,000
Condon Hall Room 360
Design Amy Cacan PM John Weatherly
39Capital Construction Summer Projects 09
- 2009 2nd Edition CONSTRUCTION STANDARDS
Maintainability Sustainability Serviceability H
igh Performance Long Lasting Cost Effective
40Capital Construction Summer Projects 09