Folie 1 - PowerPoint PPT Presentation

1 / 11
About This Presentation
Title:

Folie 1

Description:

DB AG, Roland Heinisch, Systemverbund Bahn (V) , DB AG, Roland Heinisch, ... F. JAEGER, Luxembourg CFL. L. DINU, Romania - CFR. J. HARTMANN, Germany - DB Netz ... – PowerPoint PPT presentation

Number of Views:33
Avg rating:3.0/5.0
Slides: 12
Provided by: rolandh5
Category:
Tags: folie | jaeger

less

Transcript and Presenter's Notes

Title: Folie 1


1
ERA ERTMS Conference 2007 LILLE, 07 JUNE 2007
Roland HEINISCH, ERTMS Platform Chairman
DB AG
Roland Heinisch
Systemverbund Bahn (V)
Lille, 07.06.2007
2
A i m a n d P u r p o s e o f E R T M S
( E T C S G S M R )
  • Simplification of cross-border transport
    services with direct trains
  • (Benchmark locomotive change and/or
    multiple on-board system
  • packages for crossing system interfaces)
  • Cost savings resulting from use of less
    expensive train control
  • technologies, infrastructure and vehicles,
    at least in the long term
  • (harmonisation, standardisation, competition,
    production quantities)
  • "ERTMS is not an end in itself, but only a means
    to an end - its success must be measured by its
    effectiveness."

3
M a n a g e m e n t P r o c e s s E R T M S
4
UIC E R T M S P L A T F O R M
5
  • Railways basic needs for the interoperability
    (ERTMS/ETCS applications)
  • To guarantee their consultation and coordination
    with each other as a whole
  • To exchange information and recommendation among
    the different railways companies (IMs and RUs)
    and institutions (CER-EIM-ERFA), in order to
    express a unique, agreed railways position
  • Way to satisfy the identified basic needs
  • To integrate all the ERTMS aspects into a
    common Platform.
  • Common Platform main topics
  • alignment and coordination of the various
    railways activities and tasks,
  • management of some tasks like
  • Improvement, rationalization and diffusion of all
    the ERTMS/ETCS information, especially the ones
    related to the applications experiences,
  • definition of the methodology for the costs
    evaluation,
  • users indication for the medium / long term
    signalling standardization strategy for the
    interoperability
  • Forecasted results
  • To produce, also by the support of the EEIG
    ERTMS User Group, the basic findings to be used
    as railways recommendations for the European
    railways bodies formal decisions

6
Overriding railways objective To safeguard
increase the competitiveness of the rail system
  • Raise not endanger the output capacity of
    system/lines/nodes.
  • Cost-benefit analysis limit additional
    expenditures.
  • adopting Version 3.0.0 for European mainlines
    (output capacity)
  • using Version 2.3.0 as a means of proceeding
    towards Version 3.0.0
  • gt whilst simultaneously with different
    solutions in corridors, but meeting
  • the compatibility criteria
  • gt key aspects e.g. braking curves, level
    crossings, start of mission (under ETCS)

7
M a n a g e a b l e M i g r a t i o n ( f o r
r a i l w a y u n d e r t a k i n g s )
  • Adapting to existing, non-harmonised
    technologies in
  • operational environments make migration
    difficult
  • (must be taken into consideration, however).
  • Exploiting full range of capabilities of ETCS
    technology
  • (options directed to the common goal of
    standardisation
  • i.e. while also accepting compatible interim
    stages).
  • Taking tolerable restrictions for fleet
    operators into account
  • (corridor deployment, logical migration
    stages).

8
S y s t e m s C o m p a t i b i l i t y V e r
s i o n a v a i l a b i l i t y
S R S s
3.0

C o m p a t i b i I i t y
Additional CRs
2.3.0

Subset 108
Subset 108

2.2.2
D i f f e r e n t C o r r i d o r s /
part of the European Network
9
(No Transcript)
10
Summary Main goals
  • To Clarify technical facts/maturity and To
    disseminate information
  • To Co-ordinate railways position in the
    relation with the Industry
  • To give the requested support to the EC
    activities for the migration

11
Summary Main Action
  • SRS 2.3.0 Determine definitive content and
    confirm practicality of application in
  • combination with producer/system needs.
  • SRS 3.0.0 Preparation /clarification (in
    parallel with SRS 2.3.0 action)
  • Interoperability task force/support group per
    corridor with cross comparison and
  • correlation of results
  • Migration tools to be clarified together with
    their use/benefit
  • - Limited Supervision Radio in-fill STM etc
  • Synchronize migration plans on corridors
  • System interfaces onboard/track
    side/interlocking
  • Systems costs (benchmark and general strategy
    for reduction)
  • - Opening of the Interfaces definition of
    modules use of the EU finance.
  • System evolution (ETCS/GSM-R, GPRS)
  • GSM-R Frequencies MoU
  • Satellite applications in the railway system