Title: Bernhard Lauss
1MuCAP Slow Control Status
Bernhard Lauss
MuCAP Collaboration Meeting PNPI, Gatchina, Ru,
June 14-18, 2004
2General Definition
Slow Control (is sub-part of the main DAQ) All
parameters which are not detector hit times -gt
main DAQ
? Temperatures, Magnetic Field, Humidity,
H2-Pressure, Count Rates, selected Hit energy,
main contributions by Steve Fred B
MuCAP Collaboration Meeting PNPI, Gatchina, Ru,
June 14-18, 2004
3Present Setup
MuCAP Collaboration Meeting PNPI, Gatchina, Ru,
June 14-18, 2004
4Computers
CHEETAH / DOLPHIN
TURTLE
CAMAC - Crate 8 4 Serial Ports MSCB
Slow Control
BEARS
NI DAQ Cards
MuCAP Collaboration Meeting PNPI, Gatchina, Ru,
June 14-18, 2004
5Bears.psi.ch
Computer (Windows) located on the experimental
platform 2 National Instruments DAQ Cards read
out via LabView - total 2x8 differential Inputs
attached sensors 2 Hallprobes (upper/lower
coil) 6 Temperatures (RTDs) 2 x TPC
upper/lower coil ePC1,
ePC2 H2-Pressure 1 Humidity Sensor Gas-flow
card1
MuCAP Collaboration Meeting PNPI, Gatchina, Ru,
June 14-18, 2004
6Windows 2000
MuCAP Collaboration Meeting PNPI, Gatchina, Ru,
June 14-18, 2004
7present LabView Page
MuCAP Collaboration Meeting PNPI, Gatchina, Ru,
June 14-18, 2004
8Turtle.psi.ch
Computer (LINUX) located in the barack controling
via MIDAS CAMAC crate - Scalers - I/O
Units - DAC (TPC thresholds) -
Discriminators (eSC thresholds) - ADCs (energy
of selected eSC hits) Keyspan - USB ? 4 serial
ports adapter USB extender Control of 3
Nitronic High Voltage Supplies on experimental
platform VsCom - USB ? 8 serial port
adapter Control/Readout of HV Supplies (TPC,
muPCs, ePCS) MSCB - PSI Slow Control Bus - ePC
currents,
MuCAP Collaboration Meeting PNPI, Gatchina, Ru,
June 14-18, 2004
9MuCAP Collaboration Meeting PNPI, Gatchina, Ru,
June 14-18, 2004
10MIDAS Page Presently /hv-midas/hv-frontend 3
Nitronic HV Supplies /Scalers/frontend CAMAC
Readout read also LabView file Bears
(LabView writes via Samba directly on Turtle
disc (Steve set this up last year for the first
time) when starting up bears mu.vi - reconnect
network drive G as Turtle/data/labview_data
turtle is in MuCAP Workgroup
MuCAP Collaboration Meeting PNPI, Gatchina, Ru,
June 14-18, 2004
11MuCAP Collaboration Meeting PNPI, Gatchina, Ru,
June 14-18, 2004
123x32 High Voltages 1-64 eSC
MuCAP Collaboration Meeting PNPI, Gatchina, Ru,
June 14-18, 2004
13TPC thresholds
MuCAP Collaboration Meeting PNPI, Gatchina, Ru,
June 14-18, 2004
14Discussion Which other parameters should be
monitored ? Do we need new / other sensors
? e.g 3-axis magnetometer
MuCAP Collaboration Meeting PNPI, Gatchina, Ru,
June 14-18, 2004
15MuCAP Collaboration Meeting PNPI, Gatchina, Ru,
June 14-18, 2004