IMACS: InamoriMagellan Areal Camera and Spectrograph - PowerPoint PPT Presentation

1 / 22
About This Presentation
Title:

IMACS: InamoriMagellan Areal Camera and Spectrograph

Description:

B. Bigelow, T. Hare. S. Gunnels, G. Luppino, R. Cleary Mechanical des. ... Disperser server (Hare) done, mounted - Grating cells (Bigelow) 1 of 6 done ... – PowerPoint PPT presentation

Number of Views:77
Avg rating:3.0/5.0
Slides: 23
Provided by: bruceb8
Category:

less

Transcript and Presenter's Notes

Title: IMACS: InamoriMagellan Areal Camera and Spectrograph


1
IMACSInamori-Magellan Areal Camera and
Spectrograph
  • Magellan SAC Status Report
  • 18/19 January 2003
  • OCIW, Pasadena, Ca

2
IMACS project team A. Dressler Pr.
Investigator B. Bigelow Instrument
Scientist B. Sutin, H. Epps Optical
des./eng. B. Bigelow, T. Hare S. Gunnels, G.
Luppino, R. Cleary Mechanical des. V.
Kowal, R. Storts, J. Castillo Mechanical fab. A.
Bagish, D. Carr, J. Asa Electronics G.
Burley, I. Thompson, J. Estrada Detector
systems C. Birk, K. Clardy Software eng.
3
(No Transcript)
4
(No Transcript)
5
(No Transcript)
6
Optics Status Collimator C01 (field lens) -
C05 done, installed Long Camera
L01-L06 done, installed Short Camera S01 -
S09 done, mounted Grisms 200 l/mm done,
ready to mount 300 l/mm ruling at RGL 600
l/mm ruling at RGL
7
Optics Status cont. Filters 2 sets of CTIO
B,V,I, done, mounted 2 sets of CTIO R done,
mounted CTIO U (LCAM) awaits ADC
coating Sloan u, g, r, i, z not
ordered Imaging Mirrors Al mirror
mounted Ag mirror done Echellette
Optics Grating done Prism (Zygo) IP
8
Current grating selection
9
Mechanical Engineering Status Guide camera
stages (Hare) done, mounted Calibration lamp
system (Hare) IP Mask server (Bigelow) done,
mounted Field Lens (Hare) done,
mounted Shutters (Hare) done, mounted Filter
servers (Bond/Bigelow) done, mounted Disperser
server (Hare) done, mounted - Grating cells
(Bigelow) 1 of 6 done - Grism cells
(Bigelow) IP - Mirror cells (Bigelow) 1 of 2
done
10
(No Transcript)
11
(No Transcript)
12
Mechanical Engineering cont. Collimator mech.
(Bigelow) done, mounted Long camera mech.
(Bigelow) done, mounted Short camera mech.
(Bigelow) done, assy IP Dewar (Luppino) done,
mounted Instrument Structure (Gunnels) done Inst
rument Carriage (Gunnels) done Instrument
Enclosures (Gunnels) done, minor mods
IP Instrument Utility wrap (Gunnels) done Integr
al Field Unit (Durham) IP
13
(No Transcript)
14
(No Transcript)
15
Electronic Engineering (Baggish) Schematics
design (all motion stages) done (4) Motion
control (MC) chassis, done (1) Power supply
chassis, done (1) Shutter control
chassis done (2) Electronics racks for
chassis done (2) SA FC power supply
chassis IP (2) Guider power supply
chassis IP Instr. wiring harnesses IP new
since last meeting
16
Detector systems Guide cameras - 3
cameras in house, one loaned to LCO Science
array - First light with 7 chip array 12/10/02
- Multiple test runs, flexure testing IP - CCD
copper cooling strap tuning IP -
Test/integration of detector focus and flexure
control IP - Electronic/software integration
IP
17
Software Instrument Control (Birk) Individual
module testing Module GUI status H/W
tests Pr. Guider done 80 SH
guider done 80 CF guider done 90 Slit
Mask Server done 75 Disperser
Server 90 50 Long Camera Focus done 90 Fi
lter Servers (2) done 90 Flexure
Control done 75 Detector Focus 50 10 HP
Sensor System done 60
18
Software Instrument Control cont. Integrated
instrument testing - One GUI at this level,
showing all critical aspects of each module
(encoder positions, limit status, temperatures,
etc). - This GUI is written and 90 tested,
unfinished stages remain (Disperser Server,
Grating tilts, detect. focus) User Level
Software - Two GUIs at this level - Instr.
control interface (select a grating, etc.) - 75
done - Graphical Instr. Status Display - 50 done
19
Software Science Array Control (Birk) Shutter
control - micro-controller for linear
motors 90 done CCD readout / camera control -
ccdserver for array readout working -
camgui for user interface working Quick-Look
Tool - functional with real data 90 done
20
Slit Masks Laser mask cutting system -
high quality masks delivered to SBS for
testing - some laser tuning issues remain -
still debugging RS-274 (G-code) generation -
syntax - storage of used masks? - order of
large stock of mask blanks? - mask blanks
approx. 100 each
21
(No Transcript)
22
Coming up - Final assembly and testing of F/2
camera - Final integration of detector
system - Fab of grism cells, mounting of grisms
(3) - Fab of grating cells (5), and tilt
mechanisms (3) - Power supply chassis (3), SA
FC controllers, guiders - Instrument cooling
system plumbing - Thermal testing (Bally
enclosure due 1/27/03) - Shipping preparations
started
23
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com