Title:

IMACS: InamoriMagellan Areal Camera and Spectrograph

Description:

Fabrication: V. Kowal, R. Storts, J. Castillo, P. Ramirez. 6-7 October 2001 ... cameras at LCO, 5 more to be fabricated this year - 3 cameras for IMACS by end ... – PowerPoint PPT presentation

Number of Views:180
Avg rating:3.0/5.0
Slides: 34
Provided by: bruceb8
Category:

less

Transcript and Presenter's Notes

Title: IMACS: InamoriMagellan Areal Camera and Spectrograph


1
IMACSInamori-Magellan Areal Camera and
Spectrograph
  • Magellan SAC Status Report
  • 6-7 October 2001
  • U. Arizona, Tucson, AZ

2
Current project team A. Dressler Principal
Investigator B. Bigelow Instrument
Scientist Optical Engineering B. Sutin, H.
Epps Mechanical Engineering B. Bigelow, T.
Hare, S. Gunnels, G. Luppino (Consult.) R.
Cleary (drafting) Electrical Engineering J.
Asa, D. Carr (Consult) Detector Systems G.
Burley, I. Thompson, J. Estrada Software
Engineering C. Birk, K. Clardy Fabrication
V. Kowal, R. Storts, J. Castillo, P. Ramirez
3
(No Transcript)
4
Optics Status Collimator C01 (Field lens)
Finished, at OCIW C02 - C03 Finished, mounted in
cells C04 - C05 At Spectrum TFL for coating
Long Camera L01 - L06 At Spectrum TFL for
coating Short Camera S01, S08 Blanks at REOSC,
specifications under revision S02 - S09 At TORC
for polishing
5
Optics Status cont. Filters Two sets of UBRI
filters matching those used by Arlo Landolt have
been ordered from Barr. Grisms Design of the
grisms is in progress.
6
Current grating selection
7
Mechanical Engineering Status Guide camera
stages (Hare) Assy. IP Mask server
(Bigelow) Mods. IP Field Lens
(Hare) Done LCAM shutter (Hare) Done
Filter servers Done Disperser server
(Hare) re-design, draft. IP
8
Mechanical Engineering cont. Collimator
(Bigelow) Assy. IP Long camera
(Bigelow) Ready for Assy. Short camera
(Bigelow) Drafting IP Dewar (Luppino) Done In
strument Structure (Gunnels) IP
9
(No Transcript)
10
(No Transcript)
11
Center field guide camera assembled and tested
12
Principal and SH guide cameras being assembled
10/01
13
(No Transcript)
14
Field lens coated, in shipping fixture
15
Field lens cell
16
Collimator barrel ready for assembly
17
C02 during after final potting operation
18
C03 during first potting step
19
(No Transcript)
20
First grating tilt mechanism assembled
21
Long camera
22
LCAM materials at MT, 5/01
Rings for lens cells.
Front and rear barrel stock.
23
LCAM scale control system assembled and operated
24
Long camera with shutter, FS, and dewar mounted
25
(No Transcript)
26
(No Transcript)
27
(No Transcript)
28
(No Transcript)
29
(No Transcript)
30
Convergent/Prima commercial 150W CO2 laser
cutting system 270K (2 sec/slit).
31
Directed Light laser cutting system
32
Electronic Engineering Dave Carr is providing
electronics design for IMACS on a consulting
basis. Status of electronics (3) Motion
control (MC) chassis, 1 Done, 1 IP (1) Power
supply chassis, Done (1) Shutter control
chassis Done (2) PI chassis (flexure scale
control) Done Schematics design (all motion
stages) Done
33
Detector systems Guider cameras - 4
cameras at LCO, 5 more to be fabricated this
year - 3 cameras for IMACS by end of 2001?
Science arrays - All CCDs in house - Dewar
and detector system mechanics in house - First
OCIW science controller (with 1 CCD) operating
34
Detector systems continued Five science
cameras planned for assembly in 2001 - 2K x 4K
lab system - Red and Blue 2K x 4K cameras for
MIKE - 4K x 4K camera - IMACS 8K x 8K Jorge
Estrada now assisting with electronics
assembly of the guiders and eventually, the
science arrays.