Title: UPRMHPA Seminar Richard Antley TIFellow Mike Yazdani PE Manager
1UPRM-HPA SeminarRichard Antley TI-FellowMike
Yazdani PE Manager
- 1st session
- HPA Product Engineering
- January 26th, 2008
2Profile Mike Yazdani
- BSEE 1983 UTA
- MSEE 1990 SMU
- MSEM 2001 SMU
- Hired into TI as Product Engineer 1986
- Worked as Product, Test, Design engineer
- Worked on Standard Logic, ADCs, DACs, CODECs, and
Audio products. - Now Product Engineering Manager in charge of
sustaining Audio and Imaging Products at TI
3Agenda
- Presented by Mike Yazdani
- SC business overview
- New Product Development
- PE/TE roles
- Why test
- How to test
- Limit setting GRR - Temp and Machine
(Capability) GBs - QA testing
- Production testing
- Product sustaining
- Characterization of a product
- Wafer fab and probe test concepts.
- Quality and reliability
- Presented by Richard Antley
- Data sheet understanding
- A simple OP-Amp Analog
- A simple ADC/DAC CODEC
- ATE Tester Overview
- Tools, Testers
- What is precision
- What is accuracy
This is a Product and Test Engineering seminar
designed to increase the understanding of
senior and graduate level students of PE/TE.
4Engineering roles at TI
- Product Engineer
- Test Engineer
- Design engineer
- FAB MQ engineer
- Systems engineer
- Marketing engineer
- Planning
- Finance
- Process engineer
- FAB Yield engineer
- FAB Product engineer
- Packaging engineer
- Project Manager
- Facilities engineer
- Technical Staff
- Equipment engineer
- EDA
- PCB
- A/T product engineer
- Software engineer
- Define, Design, Validate
- Application engineer
- Technical writer
5SC business overview
- SC group in TI is organized in 5 SBEs
- Strategic Business Units
- HPA, HVAL, WTBU, ASP, DLP
- 14 billion in 2007, 25.3 PFO
- 15,900 in The Americas 12,600 in Texas
11,300 in North Texas 10,400 in Dallas Area - 8,800 in Asia
- 2,400 in Japan
- 3,200 in Europe
Approximately 30,300 employees worldwide
6TI has over 75 Years of Innovation
- TI engineer Jack Kilby invented the worlds first
integrated circuit in 1956, an invention that
changed the world forever and garnered him a
Nobel Prize in 2000 - TI invented the first calculator in 1967 weighing
4 ½ pounds and costing 2500. Today, TI has
shipped more than 20 million graphing
calculators. - TI has won two Emmy Awards for its DLP
technology - More than half of the worlds cell phones use TI
technology - 75 of the worlds PCs use TI for power
management and data storage - TI DSPs are so fast they are listed in the
Guinness Book of World Records - TI builds some of the worlds most advanced
seminconductor designs on 300 mm silicon wafers
with leading-edge 65-nanometer process
technology
7(No Transcript)
8TI Businesses
Semiconductor 11.8 B
Education Technology .5B
Semiconductors
2005 TI Revenue By Segment (B) 12.3B
Continuing operations, excludes the divested
Sensors Controls business.
Education Technology
B
9 Segway Human Transporter
Digital Motor Control
10HPA New Product Development
11HPA New Product Development
- New product Development is divided into several
sections - Kickoff phase This is where the project is
evaluated from a financial, market, schedule
fusibility - Validation phase In this phase a schedule is in
place that had valid dates up to and including
the Release To Market. Marketing numbers are
reviewed again. - Create phase This is where the device is
designed, and fabricated. Meanwhile test hardware
and software is prepared. - Evaluate phase This is where the device is
evaluated vs. specified parameters both on the
ATE and on Bench. Product also goes through
varous qualification testing - RTM phase This is where all hardware, software,
qualification, and other required material (Data
sheet, pricing, COB, BOM,) are set and device is
ready for mass production. - Ramp To Volume phase In this phase, we ensure
all yields and test times and optimized.
Multisite testing is added for devices that have
high volumes.
12PE/TE roles
- Test Engineer
- Reviews and understands the data sheet of a given
product. All specs as well as theory of
operations are clearly defined and understood - Understands how to define and test all specified
parameters. Can identify bench instruments needed
to test the parameters. - Understands at least one Automatic Test Equipment
and its set of instruments and capabilities - Can write software to operate the ATE to test a
given product. - Design hardware to test device. HIB, PIB
- Familiar with schematic capture tools as well as
layout of PCB
13 The Complete Signal Processing Chain and Power
Architecture
Analog Signal Conversion to Digital
The Real World
Signal Conditioning
Temperature Pressure Position Speed Flow Humidity
Sound Light
Power Management
Digital Signal Processor
Digital Signal Conversion to Analog
Interface
Signal Conditioning
Clocks timers
14PE/TE roles
- Product Engineer
- Understand the entire flow of the semiconductor
development process as well as sustaining devices
in production. - Understands fabrication flows and factory process
flows. - In most cases serves as project manager for NPD
phase. - Understands and performs product qualification.
- Can help is identifying qual and test failures.
- A very good understanding of statistics
- Monitors and maintains devices in production both
probe and final test. - Yield monitor, analysis,
- Low yield disposition
- New package spins
- 70-30.
15Why Test
- All devices that leave our factory must meet all
specified parameters at all specified conditions. - Because of this we must fully test or SBD for all
specified parameters.
16How to test
- Bench characterization
- Functional
- Parametric
- ATE. Full 100 test across all specified temps
or guard bands in place to meet temp specs. - Use various ATEs. HP, Teradyne, LTX, ETS,..
- Use handlers. Delta, Multitest, YoKowa,
- Use high performance sockets.
17VLCT
18VX3 Fusion
Integra Flex
19200mm TSK Prober
20Delta Castle
21Delta Flex Pick and place
Multi test - Gravity
22Multitest
23- Continuity
- Purpose of Continuity Testing
- ATE to Test Head connection
24- Purpose of Continuity Testing
- Verify Bond Wire Connection between die bond pad
and package lead frame
10pin
No bond wire!
3pin
1pin
25- Continuity
- Continuity Test Technique
- On chip protection diodes
- Protect input and output from Electrostatic
Discharge (ESD) and other overvoltage - Pins have either one or two reverse biased diodes
26Limit setting GRR - Temp and Machine
(Capability) GBs
- Limits are set to prevents bad units being
shipped to customers. - Guard bands are calculated based on the GRR which
is a Temp drift study and test setup capability. - Temp across specified temp.
- I -40 to 85C. Room is 25C
- C 0 to 70C.
- Test setup
- HIB, tester, Sites on the HIB
This is the GB for Temp variation if only room
temp testing is done.
This is the GB for Capability of the test
solution.
Gt G1G2 2 Gt less than 10 of spec
USL
FTL
LSL
FTL
G1
G2
27QA LAT testing
- All production lots will be sample tested for lot
acceptance testing - A sample of 200 or 315 (depending on the lot
size) is pulled and retested to the data sheet
limits. - Yield should be 100 or the entire lot will have
to be retested. - This depending on the sample size will ensure a
ceratin AQL or DPPM. - This will catch binning, handling, jam count,
issues - TestSPC in HPA will replace LAT
28Production testing
- Refer to the pictures in the how to test
section of this presentation and the day 2 of the
August presentation. - Reminder All devices shipped from TI to our
customers are 100 tested at least once to the
specified parameters.
29Characterization of a product
- Usually done on the bench
- One a few devices
- Used lab instruments, PC, software,.
- Verifies most all parameters/function
- Also can be done on ATE for corr.
30(No Transcript)
31(No Transcript)
32(No Transcript)
33Wafer fab and probe test
- Wafer fabrication site are where we process Raw
wafers to a final device. - Some 9 to 38 masks are used to make devices.
- Make CMOS, BiPolar, BiCMOS processes
- TI has 10 wafer fabs and 8 assembly test
facilities that turn raw silicon wafers into
quality packaged chips that are vital for end
products like cell phones, PDAs, MP3 players,
and digital cameras. - Probe testing is done at the end of fab
processing to identify and remove bad dies from
assembly and test. - A wafer map (see picture) is created after probe
testing.
34200mm TSK Prober
35VLCT docked to TSK prober
36Wafer Ring
Chuck
37Probe Card
38Probe Card
39Probe Marks
40(No Transcript)
41Quality and Reliability
- All new devices, new packages, new fab process
and any change to an existing device is
production will have to be qualified according to
TIs internal specs. - Tests included for qualification are
- SSLT or BI, or HTOL (dynamic and Static)
- HAST
- Temp Cycle or Thermal shock
- ESD
- Latch up
- Characterization
- Autoclave
42Packaging
43Semiconductor Packaging
The semiconductor package provides the electrical
interconnect between the integrated circuit and
the printed circuit board.
Epoxy encapsulant
Leads
Circuit board traces
Bond wires
Integrated circuit
44TI Offers A Wide Package Portfolio, Including
Quad Flatpack No Leads (QFN)
Thin Quad Flatpack (TQFP)
Small Outline No Leads (SON)
Small Outline Transistor Package (SOT23)
Transistor Outline (TO236)
Mini Small Outline Package (MSOP)
Shrink Small Outline Package (SSOP)
Heat Sink Thin Quad Flatpack (HTQFP)
Surface Mount Header (DDPak)
Small Outline Integrated Circuit (SOIC)
Thin Shrink Small Outline Package (TSSOP)
Small Outline Transistor (SOT223)
Plastic Dual-In-Line Package (PDIP)
Power Modules
Heat Slug Small Outline Integrated Circuit
PowerPad Small Outline Package (HSOP)
Transistor Outline (TO220)
Power Small Outline Package (PSOP3)
Analog Mirror Packages
Thermally Enhanced BGAs
MicroStar JR Chip Scale Pkg (uJR
BGA) MicroStar Ultra Thin Land Grid Array Chip
Scale Package (uUT LGA)
MicroStar BGA Chip Scale Tape
BGA (uBGA) Laminate Chip Scale BGA (nFBGA)
Wafer Scale Package (WSP)
Flip-Chip Power Packages
45Assembly process
DIE ATTACH/CURE
SAW
WIRE BOND
IR REFLOW
BALL ATTACH
MOLD
FLUX WASH
VM V/M Lot Accept
BALL INSPECT
PACKPACK LOT Accept
inc. Bake
SHIP
46Purpose of the Semiconductor Package
- Provide the electrical connection between the
semiconductor and end application. - Semiconductor I/O are at very fine pitch (0.060mm
is not unusual) - End product I/O are often 0.5 to 0.8mm pitch.
- The semiconductor package provides environmental
protection against - Heat
- Corrosion
- Mechanical damage.
47(No Transcript)
48