WORK PERMIT - PowerPoint PPT Presentation

1 / 69
About This Presentation
Title:

WORK PERMIT

Description:

... surrounding of the work area with fire-resisting or flame-retarding tarpaulin. ... Detail drawings of the underground facilities shall remain attached with the ... – PowerPoint PPT presentation

Number of Views:295
Avg rating:3.0/5.0
Slides: 70
Provided by: esf9
Category:
Tags: permit | work | drawings | fire | flames

less

Transcript and Presenter's Notes

Title: WORK PERMIT


1
WORK PERMIT
A.K.SINGH, SAFETY MANAGER INDIANOIL CORPORATION
LTD. BARAUNI REFINERY, INDIA
2
ROAD MAP
  • The session will include the following
  • Presentation on BR Work Permit system followed by
    discussion
  • Role of Issuing Executing Authority
  • Exercise how to fill the permit
  • Questionnaire/QUIZ

3
WHY WORK PERMIT?
  • Petroleum Refinery handles Hydrocarbons and toxic
    materials - poses special risks.
  • Maint. Personnel are not adequately familiar with
    process conditions.
  • Operation will determine that it is safe to
    perform the designated job.
  • Basic purpose of permit system is to prevent
    injuries to personnel.

4
  • Protect property from damage
  • Avoid fire
  • Ensure that all work is carried out in safest
    possible manner.
  • permit specifies the conditions and procedure for
    safe execution.

5
WORK PERMIT REQUIRMENT
  • Permit is required for the following jobs
  • Major Minor Maint. work.
  • Inspection.
  • Construction.
  • Alteration.
  • Process Equip. cleaning
  • Entry into confined space.
  • Excavation
  • Vehicle entry into hazardous areas etc.

6
WORKS - PERMIT NOT REQUIRED
  • Works carried out by Oprs. Dept. as a part of
    routine operation.
  • FIRE STATION
  • FIRE TRAINING GROUND

7
BLANKET PERMIT
  • SIX MONTHS BASIS / MAX I YEAR
  • WORK SHOP
  • INSTRUMENT LAB/WORKSHOP
  • LABORATORY
  • INSPECTION

8
TYPES OF PERMITS
  • 7 types of work permit with specific colors.
  • HOT WORK VEHICLE ENTRY PERMIT (Pink, light
    green white)
    For use of or generates local source
    of ignition,vehicle engine operated equip.
    entry to hazardous areas.

  • BRFSFR1
  • CLEARENCE COLD WORK PERMIT (YELLOW WHITE)
  • BR FS FR2
  • (For all general maint. works (no ignition
    source)
  • DYKE CUTTING EXCAVATION PERMIT(PINK ,light
    green white)
  • BR FSFR3
  • ROAD CUTTING BLOCKAGE PERMIT (PINK , yellow
    light green)
  • BR FSFR4
  • VESSEL ENTRY/VESSEL BOX UP/EXCAVATION (yellow
    white)
  • For personnel entry into confined space. BR
    FSFR14
  • WORK AT HEIGHT PERMIT (yellow
    white) BRFSFR17
  • RADIATION WORK PERMIT( PINK WHITE)
    BRFSFR18

9
FEATURES OF WORK PERMIT FORM
  • Work Permit form generally consists of the
    following features
  • THE ORIGINIAL AND COPIES
  • Original is unmarked and belongs to Executing
    Authority-pink copy
  • Printed serial number
  • FORM NO. BR FSFR...

10
  • Special instructions printed on the permit

11
PROCEDURE FOR WORK PERMIT SYSTEM(WPS)
  • WPS OPERATE ON OWNER IN CHERGE CONCEPT(UNITS-CPNM,
    LAB-SQCM,TPS-CPUM, STORES-SMTM)
  • PERMIT IN PRINTED FORM
  • SEPARATE PERMIT FOR COLD HOT WORK
  • PERMIT COLOUR CODED, SERIAL NUMBER
  • DEPTL. OR CONTRACTOR JOBPERMIT RECEIVING BY
    MN/PJ/CONSTRN. SUPERVISOR OF IOCL.
  • PERMIT INITIATION BY MN/PJ SUEPRVISOR.
  • ALL PERMITS TO BE WRITTEN IN CAPITAL LETTERS
  • WORK ORDER/LOA NO. TO BE MENTIONED ON PERMIT
  • LOCATION DRAWING/SKETCH TO BE GIVEN ALONG WITH
    PERMIT.
  • RISK EVALUATION CHECKLIST TO BE TICKED BY ISSUER
    (GSI(HOT WORK), SUPERVISOR. NOT BY EXECUTOR.

12
PROCEDURE FOR WORK PERMIT SYSTEM(WPS)
  • HOT WORKPERMIT
  • EXECUTOR TO INITIATE THE FIRE PERMIT-DUATION,LOCAT
    ION, EQUP.TAG NO., NATURE OF WORK, NAME
    SIGNATURE. ECECUTOR NOT LESS THAN A GRADE
    OFFICER
  • GSI( B GRADE AND ABOVE)-CHECK THE PERMIT,
    EVALUATE THE RISK,TICK 30 ITEMS AS APPLICABLE,
    SPECIAL INSTRUCTION IN SPACE PROVIDED IN PERMIT
    TO PREPARE THE AREA /EQUIPMENT TO CARRY OUT THE
    HOT WORK.
  • SHIFT IN CHRAGE IN E/N SHIFT TO FOLLOW UP
    DIRECT PREPARATIONS. N/SHIFT TO INSPECT THE AREA
    /EQUIPMENT JUST BEFORE THE SHIFT CHANGE AND LEAVE
    MESSAGE FOR FPS(C GRADE AND ABOVE)IN SHIFT LOG
    BOOK.

13
PROCEDURE FOR WORK PERMIT SYSTEM(WPS)
  • HOT WORKPERMIT
  • FPS AFTER GOING THROUGH LOG BOOK ,ACCOMPANIED BY
    GSI EXECUTOR INSPECT THE AREA, SATISFY HIMSELF
    WITH PREPARTIONS AND THEN SIGN THE PERMIT.
  • PERMIT TO BE RECEIVED BY EXECUTOR BY SIGNING.
  • REGISTRATION AT FIRE STATION.
  • PINK COPY FOR EXECUTOR/ WHITE FOR ISSUER
  • ISSUER REPRESENTATIVE-SHIFT PNE/SPNE/SPUE TO
    CARRY OUT GAS TEST, INSPECT THE AREA, ENSURE
    COMPLIANCE OF ALL SAFETY PRECAUTION GIVEN IN
    PERMIT , THEN ISSUE CLEARENCE CERTIFICATE TO
    START THE JOB.

14
VALIDITY OF HOT WORK PERMIT
  • HOT WORK PERMIT
  • NORMAL 8 HOURS( 8AM-5 PM). BEYOND 5 PM
  • RENEWABLE AFTER AUTHORISATION FROM HOD.RENEW AT
    FIRE STATION ON EXTENSION.
  • NORMAL HOT JOBS IN NIGHT SHIFT NOT ALLOWED UNLESS
    JOB IS URGENT, PERMISSION FROM HOD REQD.
  • FOR EACH LOCATION/EQUIPMENT SEPARATE HOT WORK
    PERMIT REQUIRED IN PROCESS UNITS
  • IN OFFSITEDISTANCE EXCEEDING 15 METERS, SEPARATE
    FIRE PERMIT.

15
WHO CAN SIGN A WORK PERMIT
  • Personnel who are authorized to sign on the Work
    Permit shall have thorough knowledge of the work
    to be performed and the conditions under which
    the work will be performed.
  • DGM(T) AUTHORISES GSI FPS AND LIST IS
    CIRCULATED.

16
ISSUING AUTHORITY OF WORK PERMIT
  • Issuing authority is responsible for preparation
    and handing over of the equipment in safe
    condition to perform the work.
  • Authority to issue all types of work permits is
    generally granted to shift supervisor(PNE/SPNE,
    UTE,ELE) level of OFFICERS and above.

17
EXECUTING AUTHORITY OF WORK PERMIT
  • Request for a work permit by executing authority.
    He shall indicate types of tools and equipment
    necessary for performing the work.
  • He shall also ensure his tools, equipment and
    accessories are in good condition and all his
    workers are provided with proper PPE.

18
PREPARATION OF THE EQUIPMENT
  • Equipment electrically isolated
  • Inspection tested(for cold hot job)
  • Isolated from steam,air gas
  • Depressurized
  • Drained
  • Positively isolated/blinded
  • Steamed water flushed

19
PREPARATION OF EQUIP. CONTD.
  • Ventilated gas freed
  • Continuous inert gas flow / continuous adequate
    ventilation arranged.
  • Vehicle/equipment in good condition with spark
    arrested
  • Radiation source removed(Confined space entry)

20
RESIDUAL HAZARDS
  • Lack of oxygen
  • H2S and/or any other toxic gases
  • Combustible gases
  • Corrosive chemicals
  • Steam / Condensate
  • Pyrophoric iron
  • High humidity

21
PROTECTION MEASURES
  • Protective clothing
  • Hearing protection
  • Safety Harness
  • Eye protection
  • Face protection
  • Respiratory protection
  • Keep fire equipment stand-by

22
PROTECTIVE MEASURES CONTD.
  • Barricade the area
  • Remove flammable and combustible
  • Cover with fire retardant tarpaulin
  • Crane with basket stand-by
  • Attendance with Airline set
  • keep man ways open
  • Allow minimum possible no. of persons inside
    confined space

23
PROTECTIVE MEASURESCONTD.
  • To ensure positive isolation maintain it all
    through
  • Ensure adequate ventilation all through
  • Display copy of entry permit near entry manhole

24
GAS TEST FOR WORK PERMIT
  • Why gas test is required ?
  • Most of the gases are unwanted
  • Hazards involved -
  • Flammability(Fire Explosion)
  • Toxicity(health hazard)
  • Oxygen Deficiency

25
GAS TEST CONTD
  • Common flammable gases/liquids in refinery are
    -
  • All petroleum products,Crude and intermediates
  • Hydrogen
  • LPG
  • Common toxic gases in refinery -
  • H2S, CO,NH3,CL2, etc.

26
GAS TEST CONTD.
  • COMMON TERMINOLOGIES
  • For flammable substances
  • Flash Point
  • Minimum temp. at which a liquid gives off
    sufficient vapor to form an ignitable mix. It
    will give a flash, flame will not continue.
  • Auto Ignition Temp.
  • The lowest temp. to which a substance will
    ignite without a spark or flame.

27
GAS TEST CONTD.
  • Explosive limit
  • The concentration range of vapor in air when
    propagation of flame(ignition) occurs in presence
    of an ignition source.
  • LEL (Lower Explosive Limit)
  • The minimum concentration of vapor to air
    required to propagate(ignite) flame.

28
GAS TEST CONTD.
  • UEL(Upper Explosive Limit)
  • The maximum vapor to air conc.above which
    propagation of a flame will not occur(will not
    ignite).

29
GAS TEST CONTD.
  • Material LEL UEL F Pt.(C)
    AIT(C)
  • Hydrogen 4 75 Gas
    585
  • Methane 5 15 Gas
    538
  • Propane 2 9.5 - 104
    466
  • Naphtha 1.1 5.9 - 18
    288
  • ATK/ATF 0.7 5.0 35-50
    210
  • Diesel 0.7 5.0 32-96
    256
  • Fuel Oil 1 5.0 66
    262-407

30
GAS TEST CONTD.
  • Toxic substances
  • TLV (Threshold Limit Value / PEL(Permissible
    Exposure Limit)
  • The maximum permissible conc. of a toxic
    substance to which exposure of a person will
    have no adverse effect on health for working 8
    hrs per day.
  • STEL(Short Term Exposure Limit)
  • Maximum conc. to which worker can be exposed
    for a period of 15 mins. without any adverse
    effect to health.

31
GAS TEST CONTD.
  • IDLH(Immediate Danger to Life Health)
  • A maximum conc. from which one can escape within
    30 mins. without irreversible health effect.
  • HYDROGEN SULPHIDE (H2S)
  • Highly toxic, combustible, colorless.
  • Smells like rotten egg.

32
GAS TEST - H2S
  • EFFECTS ON HUMAN BODY
  • PHYSICAL EFFECT CONC.(PPM)
  • Can be smelled as rotten egg 0.13
  • TLV
    10
  • STEL
    15
  • Smelling sense will dry within 150 - 200
  • 2 mins, burning sensation in
  • eye throat

33
GAS TEST - H2S CONTD.
  • PHYSICAL EFFECT CONC(PPM)
  • IDLH(Loss of smelling sense, 300
  • heavy breathing, dizziness,
  • headache,and total collapse
  • within 1 to 4 Hrs)
  • Dizziness,headache,lungs 450
  • problem and total collapse within 30 to
  • 60 mins.

34
GAS TEST-H2S CONTD.
  • PHYSICAL EFFECT CONC(PPM)
  • Slow down of heart beats, 700
  • heavy breathing with coughing,
  • then death, if not rescued
  • Fatal emergency over
    700
  • Explosive limits 4.6 to 46, it gives blue
    flame when ignited.

35
GAS TEST-H2S CONTD.
  • FIRST AID
  • IF INHALED -
  • Remove exposed person to fresh air and
    administer oxygen immediately.
  • PROTECTION
  • Use fresh air mask in case conc. exceeds 10
    PPM

36
TOXIC GAS - CO
  • TOXIC AS WELL AS FLAMMABLE
  • TLV - 50 PPM
  • STEL - 400 PPM
  • IDLH - 1500 PPM
  • LEL - 12.5
  • UEL - 74

37
GAS TEST - CO
  • HEALTH HAZARDS
  • CO combines with hemoglobin of blood and make
    it unable to carry oxygen.
  • Symptoms Headache, dizziness to unconscious
    and ultimately death.
  • First Aid
  • Remove to fresh air and apply oxygen at the
    earliest.

38
OTHER TOXIC GASES
  • TOXIC GAS TLV STEL IDLH
  • NH3 25 35
    -
  • SO2 2 5
    -
  • CL2 0.5 1
    30

39
GAS TEST CONTD.
  • For hot work the gas test results shall be
  • Combustible - Below 1 LEL
  • ( Preferably NIL)
  • For confined space entry
  • Oxygen - 19.5 minimum
  • Combustible - 10 LEL Max.
  • Toxic gases - below TLV

40
GAS TEST CONTD.
  • Confined space With BA protection
  • Combustible - 20 of LEL maximum
  • H2S - Less than 100 PPM
  • CO - Less than 500 PPM
  • However, no hot job can be carried out inside the
    confined space at this condition.

41
WORKS NEED GAS TEST
  • Gas tests are required for all hot work/vehicle
    entry and confined space entry permits some
    cold permits also.
  • Issuing authority shall determine the requirement
    of gas test frequency of re-checking.
  • Trained Gas tester only shall carry out the test.

42
RESPONSIBILIES OF GAS TESTING AUTHORITY
  • To check confirm that the gas testing
    instrument is working in perfect condition before
    proceeding for the area/equipment
  • To carry out gas test at all critical
    locations/positions
  • To advise on safe method to work inside/at the
    location i.e., further gas freeing , use of PPE
    etc.

43
ELECTRICAL ISOLATION
  • Before issuing a Work Permit, it is essential to
    ensure that the equipment / facility to be worked
    on is electrically safe and electrical power is
    isolated to the extent necessary for the safe
    conduct of the authorized work.
  • Issuing, Executing authorities and Electrical
    Maintenance shall jointly decide the extent of
    isolation required.

44
  • DO NOT OPERATE tag shall be used when
    isolation by local switch is decided as adequate
    protection.
  • Multi-lock systems to be used when different
    crafts are involved.(this is towards best safety
    practices)

45
  • SPECIAL REQUIREMENT FOR - WORKING WITH
    RADIOGRAPHY
  • Risk assessment through checklist
  • Barricade the area and provide adequate warning
    signs.
  • Film badges and Dosimeters shall be worn by
    personnel handling radiography equip.
  • job preferably during night time or with least or
    no person around.
  • Continuous monitoring of cordoned off area

46
SPECIAL REQUIREMENTS FOR HOT WORK
  • The person who authorizes the Hot Work Permit is
    responsible for ensuring that the site and the
    equipment are properly prepared to prevent the
    danger of fire explosion involving flammable
    material.
  • The equipment shall be emptied and cleaned of
    flammable materials and isolated from sources of
    hydrocarbons by means of disconnection, blanking
    or insertion of blinds.

47
  • Equipment and surrounding areas shall be checked
    to ensure that they are free from any combustible
    gas.Carry out gas test.
  • Any heavy oil deposit, dried vegetation or other
    flammable / combustible materials within 8 m of a
    hot work site shall be cleared away.
  • No hot work shall be allowed within a radius of
    15 m of any sample point, drain or relief valve
    outlet unless precautions have been taken to
    prevent the escape of flammable liquids and
    vapors.

48
  • The outlet of all units drain seals within 15 m
    of the hot work shall be plugged.
  • If welding or grinding is to be done at height,
    then precautions shall be taken to prevent the
    spread of sparks and molten metal to the
    surrounding of the work area with fire-resisting
    or flame-retarding tarpaulin.
  • A hose capable of reaching up to the hot work
    point and connected to fire water main.
  • Fire Station (333/5989) shall be informed of hot
    work.

49
VEHICLE ENTRY
  • A Hot Work / Vehicle Entry Permit is required for
    entry of all vehicles in hazardous areas. Such
    areas shall be clearly demarcated with signs
    indicating No Entry without Vehicle Entry
    Permit and/or with removable chain.
  • The signatory authorities shall ensure that all
    vehicles / equipment exhaust are equipped with
    spark arrestors of approved type.
  • Entry shall only be allowed for loading and
    unloading of materials and not for passenger
    transport.

50
REQUIREMENTS FOR CONFINED SPACE ENTRY
  • The process vessel / equipment is to be
    positively isolated by blinding.
  • Shall be made safe for entry by depressurizing,
    venting, draining, steaming, washing and
    ventilating. Radiation sources ,if any, shall be
    removed.
  • The atmosphere within the confined space shall be
    checked initially and periodically(gas test).

51
EXCAVATION AUTHORIZATION
  • An excavation authorization is required for all
    excavations. Detail drawings of the underground
    facilities shall remain attached with the
    authorization if available.
  • In addition to an Excavation Authorization a Cold
    / Hot work Permit is required to work.
  • For excavations more than 1.2 meter deep confined
    space entry permit is required. Gas tests shall
    be done as per entry permit requirements.

52
SUSPENSION OF WORK PERMIT
  • All work shall immediately stop when a fire or
    emergency alarm is sounded or accident of any
    kind occurs. Approval from the FS shall be
    obtained after necessary preliminary
    investigations, to resume such work.
  • The Work Permit shall be revalidated to resume
    the work.

53
  • Any responsible member of the PN.dept. or FS is
    authorized to suspend work and withdraw the Work
    Permit if, safety regulations are violated.
  • If work is not started or is stopped for over two
    hours, the permit shall be revalidated by the
    issuing authority.

54
VALIDITY OF PERMIT
  • Work permit shall be initially issued for a
    period of 8 hrs. and shall be renewed for one
    more shift .
  • On need basis , permit can be given for max. 7
    days period.
  • Clearance to be obtained every shift.
  • Clearance to be given after physically checking
    the site.

55
CLOSING AND FILING OF USED WORK PERMITS
  • Permit Closure Duly filled and signed by both
    executing issuing authority at completion of
    work
  • Copies of the closed permits shall be properly
    filed and kept with the respective disciplines
    for at least one month from the date of
    issue/closure. Different types of permits shall
    be filed separately in chronological order in box
    files.

56
BASIC RESPONSIBILITIES OF ISSUING AUTHORITY
  • To prepare the equipment and properly tick the
    checklist items
  • To identify indicate any residual hazard
  • To advise on protective measures mention
  • To carry out gas test wherever reqd. and enter
    the result with sign,date time

57
RESPONSIBILITIES OF ISSUING AUTHORITY CONTD.
  • To discuss explain with/to executing authority
  • Carry out electrical isolation whenever reqd.
  • Close the permit when the job is complete or end
    of permit duration, which one is earlier.
  • To preserve the permit for next one month.

58
BASIC RESPONSIBILITIES OF EXECUTING AUTHORITY
  • To clearly understand the conditions of the
    equipment and residual hazards
  • To discuss the above with issuing authority and
    decide upon the protective measures.
  • To describe the job and associated hazards to the
    workmen
  • To ensure that safe procedure of execution are
    being followed

59
RESPONSIBILITIES OF EXECUTING AUTHORITY
  • To check all the hand tools / devices /equipment
    and ensure that they are healthy
  • To make the permit available at work site all the
    time
  • To close the permit when the job is over or at
    the end of permit duration,which one is earlier.
  • To preserve the closed permit for next one month

60
AUDITORS CHECK-LIST
  • An Auditor shall check the following
  • Whether the exact location of area/unit
    equipment has been mentioned clearly
  • Detail description of work is properly written
  • Fire station has been informed and properly
    ticked

61
AUDITORS CHECK- LIST
  • Permit issued to which Dept., Div.,Section
    Craft - all mentioned
  • Equipment preparation - Equipment has been
    properly prepared, all checklist items area
    properly checked ticked
  • Residual Hazards - Identified and
    ticked/indicated
  • Protective Measures- Requirements identified
    properly marked

62
AUDITORS CHECK-LIST
  • Other details - like provision of continuous
    ventilation, additional precautions
  • GAS TEST
  • Test for all probable gases carried out and
    reading recorded with sign., date time etc.
  • Frequency of rechecking identified and carried
    out

63
AUDITORS CHECK-LIST
  • Electrical isolation was reqd., carried out and
    documented.
  • Both issuing executing authority signed
    mentioning name signature, date time.

64
AUDITORS CHECK-LIST
  • Permit has been closed by both issuing
    executing authority with date time
  • Closed permits has been kept properly filed and
    being preserved for next one month

65
OPEN FIRE
  • PERMISSION-WEST SIDE OF RD.1 OR OUTSIDE GATE.2
  • NO OPEN CHULLA IN OMS,LPG RUNNING PROCESS UNIT
    INCLUDING ROAD SIDES.
  • IN SHUT DOWN UNITS UNDER REVAMP, JOINT INSPECTION
    BY AREA IN CHARGE /FS RECOMMENDATION
    DGM(T) FOR ONE DAY

66
Clearence permit/certificate
  • for hot /cold work
  • issued against permit no.
  • 14 checklist items to be critically evaluated and
    ticked
  • issued for one shift maximum/renewed shift wise.
  • Closure on job completion/ clearing the area,
    signed , date, time, return to issuer.
  • Not meant for billing.

67
Road cutting blockage permit
  • Request by executor(A grade and above) by filling
    all the entries and attaching sketch/indicating
    on reverse of permit form
  • clearance from EL maint.
  • Clearence from Civil
  • Clearence from PN
  • Clearence from IS dept.
  • Clearence from FS
  • Approved by DGM(T)
  • Permit registered at Fire Station.
  • On completion , permit return to Fire Station.

68
Excavation Dyke cutting
  • Request by executor(A grade and above) by filling
    all the entries and attaching sketch/indicating
    on permit form
  • clearance from EL maint./ Telecom.
  • Clearence from FS
  • Clearence from CL
  • Clearence from PN/Area in charge
  • Registered at Fire Station.
  • Approved by GSI
  • On completion , permit closure and return to Fire
    Station/ Area in charge.

69
Vessel Entry
  • Request by executor(A grade and above) by filling
    all the entries clearance from EL maint./
    Telecom.
  • Critical evaluation of 27 checklist
    items./ticking
  • Approved by GSI
  • Clearence from PN/Area in charge
  • On completion , permit closure and return to Fire
    Station/ Area in charge.
Write a Comment
User Comments (0)
About PowerShow.com