Title: Managing the STORM V
1Managing the STORM VV Program
Synthetic Theater Operations
Research Model
2AFSAA/SAA - Analyses Foundations Directorate
3SAA - Focus Areas
4USAF Manager
5Developer
6Background
7User Requirements
8Common Analytical System Architecture (CASA)
9Studytool GUI for Execution
10Editable Flat File Input
11Functional Model
12Air Mission Functionality
13ASCII Flat File Output
14Additional Post-Processing
15Output Tools
16The Spectrum of VV
Utility of VV
Situational Complexity
- Low Complexity
- (Engagement Models)
- Few Systems
- 1-v-1 Assessments
- Empirically Verifiable
- VV is Objective
- VV Dominates
- Chaotically Complex
- ( Campaign Models)
- Thousands of Systems
- Force-on-Force Assessments
- Empirically Unverifiable
- VV is Subjective
- Accreditation Dominates
Source LtCols Smither and Langbehn Taking a
Functional Approach to MS Policy in Mar 02
PHALANX
17Decision Making Perspective Theory and Practice
Source LtCols Smither and Langbehn Taking a
Functional Approach to MS Policy in Mar 02
PHALANX
18Governing Documents
- DoD Directive 5000.59, DoD Modeling and
Simulation Management, 1 Apr 94 w CH1, 20 Jan 98 -
- DoD Instruction (DoDI) 5000.61, DoD Modeling and
Simulation Verification, Validation,
Accreditation (VVA), 29 Apr 96 - DoD Recommended Practices Guide (RPG), VVA
Printable Documents at http//www.msiac.dmso.mil/v
va/default.htm - AFPD 16-10, Modeling and Simulation Management,
30 Jan 95 - AFI 16-1001, Verification, Validation,
Accreditation (VVA), 1 Jun 96
19DoDD 5000.59Basic Definitions
- Verification--The process of determining that a
model implementation accurately represents the
developers conceptual description and
specifications. - Validation--The process of determining the
degree to which a model is an accurate
representation of the - real-world from the perspective of the intended
uses of the model. - Accreditation -- The official determination by
the accreditation authority that the MS is
acceptable for a specific purpose
20AFI 16-1001 VV Concepts
- VV is a continuous process throughout a models
lifecycle - Different VV activities are sponsored to
support specific accreditation needs - A systematic VV plan will be part of MS
development - VV activities support model acceptance/accredita
tion requirements defined by the accreditation
authority - Models must meet VV requirements of managing
MAJCOM, FOA or DRU - VV agent performs all VV activities and
prepares a final VV report
21Putting It All Together
Simulation Credibility
STRUCTURED ACCREDITATION ASSESSMENT
Output
Data
Software
Capability
Usability
Accuracy
MS Requirements
User Capabilities
Problem
Credible Solution
USABILITY
CAPABILITY
Simulation has adequate user support to
facilitate correct operation and interpretation
of its outputs
Simulation possesses all required functionality
and fidelity for the problem being solved
Process of Accreditation Assesses All These
Factors!
Source http//www.xo.hq.af.mil/xoc/8-ToolKit-VVa
ndA-DAMM5 (JASA Brief to DAMM SG 11/00)
22Major STORM Milestones
- Program Initiation - Late 1996
- Version 0.7 Delivery - May 2001
- User Group Meeting - May 2002
- Version 1.0 Delivery - Dec 2002
- User Group Meeting - May 2003
- AFSAT Entry - Feb 2004
- Retire Thunder at AFSAA - May 2004
- User Group Meeting - May 2004
- Version 1.1 Delivery - TBD
Source STORM CRLCMP, 3 Jan 2002
23Criteria for AFSAT Entry
24AFSAT Entry Process
Source http//www.xo.hq.af.mil/cgi-bin/dir_list.
pl/XOCA/DAMMSG/AFSAT
25VVA of New Models
26VV Process for New MS Development
Source The VV Agents Role in the VVA of New
Simulations, DoD VVA RPG, 5/15/01
27STORM VV Process
28Conceptual Model Mapping
29Design Verification Mapping
30Design Verification Mapping
31Implementation Mapping
32Maptool Output from STORM v0.7
33Calendar Year 2002 Schedule
Jan Feb Mar Apr May Jun Jul
Aug Sep Oct Nov Dec
Verification, Validation and Accreditation
Activities 1. VV Plan
-------------------- 2. Derived Requirements
------------------------- 3. Conceptual
Model Validation ---------------------------
3. Design Verification -------------------
---------------- 4. Implementation
Verification ------------------------------
----- 5. Data VV --------------------------
--------------------------------------------------
------ 6. VV Testing
---------------------V 0.7-----------------
----------------- 7. STORM to THUNDER
Comparison
---
31
28
31
30
30
31
30
31
30
31
30
31
Unclassified
Classified
30
31
As of 27 Mar 02
34Calendar Year 2003 Schedule
Jan Feb Mar Apr May Jun Jul
Aug Sep Oct Nov Dec
Verification, Validation and Accreditation
Activities 5. Data VV ---------------------
------ 7. STORM to THUNDER ---------V
1.0------------------------------------- 8.
Evaluation Support Package / Final VV Report
------------------------------------
31
28
Classified
30
31
31
30
As of 27 Mar 02
35Post AFSAT Entry VV
- VV is a lifecycle MS activity
- VV for new STORM software releases
- Add-on scenarios and databases
- Study-specific accreditation