Title: post shutdown calibration
1post shutdown calibration
last calibration committed to DB 214795 from
Jan. 30 New calibrations 222818/222822/222824
Jul 3rd hardware changes Jul
9th 222972/222973/222974 Jul 9th 223349/223351/223
352 Jul 19th hardware changes Jul 23rd
and Jul 29th (PS-changes) ?new calibration Aug
1st 223775/223776/223777
2comp. with pre-shutdown calib
?new gains about 0.2 higher than before
shutdown
3offset determination
PULSER 0 1 2 3 4 5 6 7 8
9 10 11 ICD PRE 75 87 57 151
206 100 62 78 78 208 112 204 0 0 0 0
(DAC) POST 73 86 53 151 194 70 59 74 8
207 60 205 15 15 15 15
DAC needs to be changed on Pulser 8!
offset value corrected for pulsers 5 and 10
4bad channels
see list of bad channels in http//www-d0.fnal.go
v/bassler/222972_222973_222974.bad 1 bad pulser
pattern pulser 4 pattern 90 check cable? 15
dead channels 1 bls card 1/11/5 and 2 channels
with strong nlc-effect 8 channels with high
dac-offset 5 channels with no nlc-effect 3
channels with gain1/gain8 transition
5NEW icd-calibration
- ICD channels are now fitted as the calorimeter
channels - increment version number in DB version6
- good channels
- and bad channels
- ? 6 dead channels
- ?all channels in box 12 are bad
- ?2 types of bad channels
- nlc-problem / offset problem
6ICD characteristics
offsets
box 12 2 populations
same behavior in the 3 other quadrants
slope a
ratio g
- slope is generally higher in ICD than in
calorimeter - small slopes correspond to box 12
7comb effect in L/M cards?
crate 0/1 4/5 6/7 10/11
adc 2/8 5/11
adc 1/7 4/10
bls 6
bls 3
bls 2
bls 7
icd channels
icd channels
no special corrections are applied