Transit Center Study - PowerPoint PPT Presentation

1 / 13
About This Presentation
Title:

Transit Center Study

Description:

City has operated adjacent facility successfully for 10 years ... Image by Truex Cullins & Partners Architects. Proposed Structure ... – PowerPoint PPT presentation

Number of Views:31
Avg rating:3.0/5.0
Slides: 14
Provided by: mbo55
Category:
Tags: center | study | transit | truex

less

Transcript and Presenter's Notes

Title: Transit Center Study


1
Transit Center Study
Burlington South End Neighborhood Transit Center
Study
Presentation to theBurlington City Council
November 21, 2005 700 PM
2
Agenda
  • Background
  • Project Location
  • Project Elements
  • Proposed Site Plan
  • Proposed Structure
  • Environmental Process
  • Conceptual Costs
  • Potential Future Use Areas
  • Next Steps

3
Background
  • Goal
  • Increase public transit service
  • Remove traffic from neighborhood streets
  • Provide commuter parking
  • City has operated adjacent facility successfully
    for 10 years
  • SENTC project would make arrangement permanent
    and within the Citys control
  • Partnership of City, CATMA and CCTA
  • Federal earmarks and CATMA match available

4
Background
  • Current study scope
  • NEPA process (Categorical Exclusion)
  • Conceptual design
  • Conceptual cost estimates
  • Technical Advisory Committee
  • Public participation
  • Coordination with AIA competition

5
Project Location
6
Project Elements
  • Transit facility
  • Park-and-Ride parking
  • Passenger waiting area, vendor space, restrooms
  • Pedestrian and bicycle improvements
  • Opportunity for complementary Future Use

7
Proposed Site Plan
8
Proposed Structure
Image by Truex Cullins Partners Architects
9
Proposed Structure
Image by Truex Cullins Partners Architects
10
Environmental Process
  • Categorical Exclusion (CE) under NEPA (National
    Environmental Policy Act)
  • Areas of Interest
  • Traffic
  • Stormwater
  • Soils
  • Construction Phasing

11
Conceptual Costs
  • Conceptual Capital Costs
  • 11.3 - 13.4 million
  • Includes 30 contingency and 20 soft costs
    (design/engineering/construction services)
  • 80 Federal, 20 CATMA
  • Conceptual Operations Maintenance Cost
  • 360,000 to 660,000 annually
  • OM cost allocation to be determined

12
Potential Future Use Areas
13
Next Steps
  • Continued Public Involvement
  • Filing of CE Checklist
  • Application to FTA for funding for Preliminary
    Engineering
  • Design Engineering
  • Construction
Write a Comment
User Comments (0)
About PowerShow.com