2Overview
- What is performance contracting and how does it
works? - Saving potentials in schools and reasons, why
this potential is not used - The first performance contracting project with
citizen participation Eco-Watt Project at
Staudinger School - The solarsave projects
- Experiences and results
3What is performance contracting and how does it
works?
4What is performance contracting and how does it
works?
5Advantage of performance-contracting in schools
with participation of silent shareholders
- No risk of rising investment costs for the
building owner - No risk concerning the energy savings
- No risk of unprofitable investment
- Lower interest for the capital investment,
compared to a conventional contracting-project - Higher envolvement of teachers and pupils
- Higher public interest
- Reduced energy-consumption in future and
therefore reduced risk of rising energy-prices in
future - Orders and work for regional companies
- Higher tax-income on local level from companies
- Less environmental damages
6Saving potentials and reasons, why these
potentials are not used
7Saving potentials and reasons, why these
potentials are not used
- Why saving-potentials in schools in many cities
are not used? - There is no financial incentive for the permanent
employees of the city municipality - There is no incentive for the schools and the
caretaker to change behaviour - In many cases, the employees dont have the
knowledge for a successful energy efficient
building renovation - The city may have no budget for the investment
(even if it is profitable) - It makes less work and there is no risk if
nothing in the building is changed - The citizen dont care enough about energy
consumption and are not able to control the
city-administration.
8The first performance contracting project with
citizen participation Eco-Watt Project at
Staudinger School
City Freiburg/D Built between 1973 and
1978 1.200 pupils Library, youth-center,
cafeteria, 2 gymnastic halls, surface area
23.000m2 Energy and water cost before start of
the project 250.000 Euro/a Start of the project
in 1998 End 9/2007
9The first performance contracting project with
citizen participation Eco-Watt Project at
Staudinger School
- Investment within the Eco-Watt Project
- Total investment 270.000 Euro
- Efficient lighting in classrooms, floors,
gymnastic hall, toiletts - Better control of the heating system and the
ventilation system - Solar thermal system to produce hot water for the
gymnastic hall (40m2) - Photovoltaik system to produce electricity from
sun light (2 kW) - Measures to save water water saving shower head,
flushing of toiletts - Money comes from 90 people teachers, parents of
students, private persons (the limited partners ,
Kommanditisten)
10The first performance contracting project with
citizen participation Eco-Watt Project at
Staudinger School
11The first performance contracting project with
citizen participation Eco-Watt Project at
Staudinger School
12The first performance contracting project with
citizen participation Eco-Watt Project at
Staudinger School
13The first performance contracting project with
citizen participation Eco-Watt Project at
Staudinger School
14The first performance contracting project with
citizen participation Eco-Watt Project at
Staudinger School
15The first performance contracting project with
citizen participation Eco-Watt Project at
Staudinger School
16The first performance contracting project with
citizen participation Eco-Watt Project at
Staudinger School
- Results part one
- Energy and cost reduction for energy- and
water-supply of about 30 - High profitability of the efficiency measures
- Lifetime of the investment about 20 years
- Duration of the contract 8 years
- Short payback period in total (about 4 years)
- There is an additional potential for energy
savings at the shools - After the good experience with performance
contracting, the municipality of Freiburg startet
two other, bigger contracting projects with more
than 10 schools.
17The first performance contracting project with
citizen participation Eco-Watt Project at
Staudinger School
- Results part two
- Many activities of students and teachers
- Students competitions for correct behavior with
energy, - Training of energy foxes Pupils learn to
analyse and evaluate their energy-consumption at
home - Energy monitor at the assembly hall of the school
- The care-keepers of the school are integrated
18The first performance contracting project with
citizen participation Eco-Watt Project at
Staudinger School
- Results part two
- Energy monitor at the assembly hall of the
school -
- make efficiency visible!
19Further project development solarsave project
in cooperation with Wuppertal Institut
- New framework conditions
- Erneuerbare-Energien-Gesetz (EEG, in the year
2000) - Higher prices for electricity
- Tax-reduction for oil and gas, which is used in
combined heat and power plants (0,55 Cent/kWh) - New Project named 100.000 Watt-Solar-Initiative
- 50 Watt of electricity production per pupil
- 50 Watt of electricity savings per pupil
- 100 Watt of production or savings per student
- Big schools with 1.000 pupils ? 100.000
Watt-Solar-Initiative or - solarsave-projects
- CEO of the solarsave contract Ltd is Dr. Kurt
Berlo, Wuppertal Institut für Klima, Umwelt,
Energie GmbH
20The solarsave projects
- Aims of the project
- Making efficiency more attractive in combination
with PV - To show, that energy-efficiency and PV are
profitable investments
21The solarsave projects
- Aggertal-Gymnasium in Engelskirchen
- Willibrord-Gymnasium in Emmerich am Rhein
- Gesamtschule Berger Feld in Gelsenkirchen
- Europaschule in Köln
22The solarsave projects Aggertal-Gymnasium
Engelskirchen
Aggertal-Gymnasium before renovation
23Measures at Aggertal-Gymnasium Engelskirchen
Combined heat and power(50 kW)
Hydraulic redevelopment, high efficient pumps
Replacement of luminaires in all rooms
Control-system for heating, water-savings
PV-power plant (43 kW)
24Measures at Aggertal-Gymnasium Engelskirchen
Before hydraulic balance About 15 pumps with
more than 6 kW have been installed Now 2 high
efficient pumps with 20,55 kW are installed
electricity-savings of about 90 of the former
electricity consumption for pumps.
25The solarsave projects investment into climate
protection
- Example Aggertal-Gymnasium
- Minimal Share 500 Eurofor parents, pupils and
teachers of the school - Other still shareholder up from 2.500 Euro
- Duration of investment 20 years
- Losses in the first years, profit distribution
from the 4th year on - Calculated Profit-rate 5 to 6
26The solarsave projects Willibrord-Gymansium in
Emmerich
27The solarsave projects Willibrord-Gymansium in
Emmerich
- Basic financial data for Willibrord-Gymnasium
- Investment 664.000 Euro
- Energy-cost-reduction in 2006 98.000 Euro
- Share of school and city 14.000 Euro
- Duration of contract 20 years
- Profit for silent shareholder 6-10
28The solarsave projects Willibrord-Gymansium in
Emmerich
29The solarsave projects
30 Articles in newspapers and journals 3 examples
Frankfurter Rundschau
SOLARboulevard
taz, Berlin
31- Experiences and results I
- There is a profitable energy-saving potential at
every school - A reduction of CO2-emissions of 50 and more is
feasible at many schools - Contracting and financing by silent private
share-holders is not the solution for all
schools. Investment through the owner usual is
the more simple way - Private persons in Germany are interested to
invest in such projects - We needed about half a year per school to collect
the money (with low-cost advertising) - There is interest from the side of teachers and
the management of the schools, but usually the
engagement for such projects has to come from
outside of the schools - Very positive reaction from media and press
- The projects find imitators in the public and
private sector
32- Experiences and results II
- The administration of the municipalities dont
like this kind of project so much - They feel, that the actors interfere into the
domain of the administration. - The contractor gets an insight-view of the
management of the building. - If the project works good, there will be
questions to the administration why dont you do
it in the same way? - If it works bad The administration has accepted
the project, so it will have to bear part of the
responsibility. - The concept is quite new and not well known and
usually the administration doesnt like any kind
of risks. - If the city owns an energy utility, the utility
might intervene because it will lose money. - In spite of everything Its not easy but it
works!
33 Thank you for your attention! For more
information please visit
http//www.wupperinst.orgwww.solarundspar.dewww.
eco-watt.dewww.oe2.de