Meeting Wrap-Up - PowerPoint PPT Presentation

About This Presentation
Title:

Meeting Wrap-Up

Description:

Tracking solenoids delivery delays. Decay Solenoid needs work ... Wes Tabler. Martha Condon. Derun Li. Scott Berg. And of course Mike! Harold G. Kirk. Backup Slides ... – PowerPoint PPT presentation

Number of Views:31
Avg rating:3.0/5.0
Slides: 14
Provided by: harol
Learn more at: https://www.cap.bnl.gov
Category:
Tags: meeting | tabler | wrap

less

Transcript and Presenter's Notes

Title: Meeting Wrap-Up


1
Meeting Wrap-Up
  • NFMCC Collaboration Meeting
  • Lawrence Berkeley National Laboratory
  • January 25-28, 2009

2
MICE
3
First Muons!
ps
µs
TOF1 TOF0, ns
4
Problems
  • Internal target breaks!
  • Tracking solenoids delivery delays
  • Decay Solenoid needs work
  • Coupling CoilMay your lives be interesting!
  • And an overriding questionwill the rf cavities
    deliver the desired gradient with the magnetic
    fields.

5
The MTA
  • First Beam To External Beam Stop
  • First Beam into Hall before end of 2009.
  • High priorityBeam into High Pressure RF cavity.

6
Soft Meson Production Efficiencies
Yield at 5Gev same as 10 GeV Peak yield at 6,7,8
GeV
X. Ding, UCLA
7
The Helical Snalke
X-Px
t-dp
Y-Py
Y. Alexahin
8
A Possible Magnetic Insulated Cavity Experiment
Palmer and Stratakis
Simplified Configuration
2-3 T
Experimental Configuration
8
9
The 5-Year Plan
  • Key GoalDelivery of a Muon Collider Feasibility
    Study by 2013.

10
Finally
  • Thank you to
  • Wes Tabler
  • Martha Condon
  • Derun Li
  • Scott Berg
  • And of course Mike!

11
Backup Slides
12
Palmers P5 Presentation
13
The Long-Term Vision
Write a Comment
User Comments (0)
About PowerShow.com