Title: Shoreline AlterationDredge


1
Shoreline Alteration/Dredge Fill Permit
RequestClaude BridgesDistrict 5
Environmental Protection Division
  • January 13, 2009

2
Location Map
Lake Pearl
3
Aerial Location Map
Lake Pearl
4
Site Photograph
Lake Pearl
Location of seawall repair
20
Photo taken facing northeast
5
Site Plan
Plan/View
6
Site Plan
Site Plan
Side View
7
Staff Findings
  • There is no EPD enforcement case associated with
    the subject property however, the seawall does
    not have a valid permit from EPD. This permit,
    once approved, will authorize the replacement of
    a 20-foot-long section of the seawall and the cap
    along the entire length of the wall. If and when
    future repairs to the seawall are required then
    the applicant will be required to submit a new
    site plan to EPD that includes the location of
    the repair(s), the installation of riprap, and
    additional native plantings (as needed) for staff
    approval. It is the intent that future repairs to
    the seawall could be authorized by EPD without a
    public hearing.

8
Action Requested
ACTION REQUESTED Approval of Shoreline
Alteration/Dredge and Fill Permit
Application subject to the conditions listed in
the staff report as well as authorize the
Environmental Protection Officer to approve any
future repairs to the wall.