Shell EPW Wells HSE Learning Bulletin
Fountain Report Number 81882
Location Pinedale Rockies - Nabors 267
Incident Date 6-20-06
What happened
As the crew was pulling drill pipe out of the
hole, the Driller assigned the Derrickman the
driller duties so that he could focus on
supervising the two short service employees (SSE)
that were on the rig floor. The crew
successfully laid down seven joints of pipe with
this crew arrangement. As the derrickman was
unscrewing the eight joint with the top drive, he
mistakenly grabbed the rotary control lever
instead of the brake out lever, causing the
rotary to engage. This caused the lead tongs
(that were still attached to the drill string)
to rotate striking one of the SSE in the mouth,
knocking out two teeth. The injured employee
was transported to Rock Springs hospital,
examined and released to work on light duty
pending further dental specialist evaluation.
  • Early Learning Points
  • Per the Wells Out of Position (OOPs) policy, only
    competent persons shall be pre-approved to
    relieve all rig positions.
  • Per SEPCo SSE Policy, all SSEs should be assigned
    individual mentors are who available to supervise
    SSE work practices.
  • Scheduling of rig supervision crew change, off
    site meetings and training should be arranged to
    minimize disruption of continuous on-site
    supervision.

Brake out handle
Handle that was mistakenly pulled