Title: Why go for Centralized solution
18th National e-Governance Conference
Public Expenditure Management
Bhubaneswar, Orissa
3rd 5th February, 2005
2Discussion Topics
- Issues Concerns
- Major Challenges
- Solution Option
- Proposed Functional Features
- Capacity Planning (Hardware, Network Sizing)
- Training
- TCS Offering
3Issues Concerns
- Overdrawal of Funds
- Fraudulent Withdrawals
- Wrong Classification
- Non reconciliation of Accounts
- Delay in finalisation of Accounts
- Delay in settling the Claims
-
4Our Aim..
- Effective Budget Control
- Comprehensive Receipts Expenditure
Reports - Compilation Classification of Accounts
- Elimination of Systemic Deficiencies
5Major Challenges.
- Determination of the right technical Solution
- Capacity Planning
- Training
- Ensuring the required infrastructure
- Implementation till the lowest level
6Solution Options
- Option I Decentralised Solution
- Option II Complete Centralised Solution
- Option III Hybrid Model
-
7Decentralised Solution
- Time lag between passing of Govt. order and its
implementation - Inability of the Finance Dept. to reconcile the
fiscal position in a given time-frame - Payment details of treasuries not transparent to
Departments/DDOs - Time lag in getting a correct picture of funds
flow - Lack of computerization in sub-treasuries hamper
consolidation in the parent treasuries - Solution works without proper connectivity
-
8Centralised Solution
- Requires proper network connectivity
- Facilitates timely implementation of Govt. orders
and effective monitoring of the Budget Ceilings
applicable to the concerned Departments - Timely reconciliation of fiscal position
- Electronic reports showing payment transactions
of treasuries available to Departments/DDOs
immediately - Reports will be available in both Push and Pull
mechanisms - Transparent view of funds flow with no time lag
resulting in a proactive approach - Better budget planning and administrative control
-
9De-Centralised vs Centralised Solution
- De-Centralized
- Difficulty in maintaining the system in different
locations - Require more people resulting in high manpower
cost in maintaining the system - Difficulty in version control resulting in non
standard approach across the treasuries
- Centralized
- Easy to maintain the system across all treasuries
from the central location - Require skeletal manpower resulting in
substantially low manpower cost in maintaining
the system - Version Control will take place from the central
location and hence standard practices can be
implemented across the treasuries uniformly
10-
- It is evident now that the Centralised, and not
the De-Centralised, Solution is desirable to meet
the objectives of Treasury Computerisation. - But, What If, a proper network connectivity is
not in place ? -
- The Solution A Hybrid Model
11Hybrid Model
- Partly using 2-tier architecture and partly using
the proven 3-tier architecture - 2-tier application would run in the treasury
offices - 3-tier application would be profile based and can
be accessed through the Internet - Instant MIS reports and status of any file / work
would be available at DTA Head Office - Finally, Smooth transition from 2 tier to 3 tier
mode leading to complete centralised solution -
12Complete, Integrated Solution ?
A Consolidated Information Warehouse Database is
Required !
Treasury Management System
Budget Management System
Departmental System
Consolidation of Information Warehouse
But Integration ?
13Complete, Integrated Solution ?
Budget Management System
14Proposed Functional Features
- MODULES
- Budget
- Treasury
- Department
- DDO
- Consolidated Treasury Data Repository
-
- USER REQUIREMENTS
- Fund Monitoring
- Budget Monitoring
- MIS Reports
- Compiled Account Financial Reporting
- Salary and Pension Payments
- Bills and Challans Processing
- Interface with AG, Bank and Commercial Tax Dept.
15Capacity Planning
16Hardware Sizing
- Review Application and System Architecture, and
Workload - Establish a Reference Measure for Sizing
- Estimate Workload
- Build CPU Sizing Model for Online Processing
(Application and DB servers) - Estimate RAM and Hard Disk Size requirements
- Review Batch Processing Requirements
17Network Sizing
- Create and validate network baseline model
- Capture network traffic
- Review Batch Processing Requirements
- Evaluate design alternatives
- Estimate Network Bandwidth Size
- - number of concurrent users
- - operational profile of users
- - transaction rates
- - the web interactions per transaction
- - the size per web page
- - response time requirement
- - kind of security imposed
18Training
- Basic Computer Training for all end users
- Conduct Orientation Workshops
- Application training for the users of different
operation profile - System Administration training to a select group
of officials - User Manuals for ready reference
-
19TCS Offerings - CTMIS
- CTMIS ensures Integrated Planning and Control
over expenditure and revenue - Internet enabled Complete Solution for
formulating and executing the Government's
treasury functions - Enables a Long-term, Open Architecture,
Flexible technology for transparently managing
Govt. Finance - Smooth transition from 2 tier to 3 tier mode
without affecting user interface in case of
adopting Hybrid Model
20TCS Offerings - CTMIS
- Centralised architecture ensuring IT management
at single location - Fully Integrated Modular Design allowing
deployment in phases - Treasury module can be deployed across multiple
treasuries - Data transfer across Modules will be seamless
- Integrated workflow support
- Integrated Application offering a Uniform Browser
Interface, Minimal requirement of user training - Decision Support Tools (OLAP) supporting Adhoc
Analysis - Security and control With SSL
- Interface facilities with Banks / AG office
- Audit Trails on sensitive tables
21 For Further EnquiriesS K Bhattacharya,
TCSe-mail syamal.bhattacharya_at_tcs.com
22