Title: BuildingGreen Top 10 Green Products
1(No Transcript)
2BuildingGreen Top 10 Green Products
3BuildingGreen Top 10 Green Products
1 Pozzotive Plus CMU Brick
- Uses Pozzolan (SCM Supplementary Cementitious
Material) binder made from 100 post consumer
recycled glass to replace some of the portland
cement - 30 reduction in portland cement
4BuildingGreen Top 10 Green Products
2 Thermafiber Mineral Wool Insulation
- No toxic flame-retardant chemical needed
naturally flame retardant - Termite resistant
- 95 recycled content
- Phenolic binder, but very low formaldehyde
emissions
5BuildingGreen Top 10 Green Products
3 Invelope Integrated Wall Rainscreen
Systems
- Insulated wall system for steel framed
construction - All-in-one insulation, sheathing, air and vapor
barrier and building wrap - MBDC (McDonough Braungart Design Chemistry)
Cradle-to-Cradle Certified Silver
6BuildingGreen Top 10 Green Products
4 Baltix Recycled-Content and Bio-Based
Furniture
- Bio-Surf bio-based laminate made from soy
corn - Recycled Content
- FSC wood veneers
- Low-VOC no formaldehydes
7BuildingGreen Top 10 Green Products
5 Project Frog Modular Classrooms
8BuildingGreen Top 10 Green Products
6 Rheem Heat Pump Water Heater
- 1st heat pump heater from a mainstream HWH
company - Twice the efficiency of standard electric HWH
- Free cooling in the summer pulls heat from the
space - Low noise compared to other HP HWH
9BuildingGreen Top 10 Green Products
7 Convia Energy Management Infrastructure
- Herman Miller in partnership with Wiremold
- Radio-frequency instead of hard wire
10BuildingGreen Top 10 Green Products
8 Rentadyne GTX Flywheel Batteries
- For UPS (Uninterrupted Power Source) applications
- Carbon fiber flywheel
- Eliminates lead-acid batteries
- 250 watts to keep charged
11BuildingGreen Top 10 Green Products
9 Silva Cell from Deep Root Partners
- Tree Protection stormwater management system
- Each cell manages 2-2.5 CF water
12BuildingGreen Top 10 Green Products
10 Mobile Solar Power Generator
- Up to 18.7 kW hour power per day
- Stores up to 45 kW hours
- Replaces Gasoline, diesel and propane generators
- No noise or odor
13HOW THE LEED EB CERTIFICATION PROCESS
TRANSFORMS YOUR OPERATIONS AND ENGAGES PEOPLE
Kimberly Dominguez, National Education
Association Cynthia Leon, Formerly Vision Service
Plan Maureen Roskoski, Facility Engineering
Associates, PC Teena Shouse, Facility Engineering
Associates, PC
14HOW THE LEED EB CERTIFICATION PROCESS
TRANSFORMS YOUR OPERATIONS AND ENGAGES PEOPLE
Case Studies of two existing buildings that
achieved LEED-EB 2.0 Certification
Vision Service Plan (VSP) 152,000 SF office
building Rancho Cordova, CA Achieved LEED-EB 2.0
Platinum
National Education Assoc (NEA) 470,000 SF office
building Washington, DC Achieved LEED-EB 2.0 Gold
15HOW THE LEED EB CERTIFICATION PROCESS
TRANSFORMS YOUR OPERATIONS AND ENGAGES PEOPLE
In both cases the majority of their efforts
boiled down to 5 things
- Energy Benchmarking energy use
- Water Benchmarking water use
- Sustainable Purchasing
- Waste Management
- Indoor Environmental Quality
16HOW THE LEED EB CERTIFICATION PROCESS
TRANSFORMS YOUR OPERATIONS AND ENGAGES PEOPLE
Their process
- Establish baseline
- Benchmark performance
- Investigate opportunities for improvement
- Implement Measures
- Verify if implementations work
17HOW THE LEED EB CERTIFICATION PROCESS
TRANSFORMS YOUR OPERATIONS AND ENGAGES PEOPLE
VSP Highlights
- Rigorous Retro-commissioning
- Check HVAC equipment to see how it is performing
in comparison to the way it was designed - Many pieces of equipment were not operating as
designed - Added sub-metering to measure energy and water
usage of equipment (100,000) - Installed light sensors.
- Training Help people take ownership of their
actions - understand that building is theirs
that they are not just occupants.
18HOW THE LEED EB CERTIFICATION PROCESS
TRANSFORMS YOUR OPERATIONS AND ENGAGES PEOPLE
VSP Highlights
- Installed new irrigation (40,000)
- Replaced older toilets with ultra-low-flow
toilets - Re-worked landscaping
- Removed 15 of trees
- Removed many older scrubs older scrubs need
more water that newer ones - Employees complained because their landscaping
was so beautiful and a source of employee
gratification and pride.
19HOW THE LEED EB CERTIFICATION PROCESS
TRANSFORMS YOUR OPERATIONS AND ENGAGES PEOPLE
VSP Lesson Learned
- People need to know why
- Educated employees on why they were removing
trees scrubs. Then there was a lot more
understanding
20HOW THE LEED EB CERTIFICATION PROCESS
TRANSFORMS YOUR OPERATIONS AND ENGAGES PEOPLE
NEA Highlights
- Optimized Air-Handling controls
- Used economizer cycle to avoid running compressor
unit. - Minimized use of steam humidification
- Replaced defective steam traps
- Low or no-cost items wanted to focus on the
things that cost the least to implement. - Wanted to do things that didnt significantly
increase the responsibilities of the maintenance
staff.
21HOW THE LEED EB CERTIFICATION PROCESS
TRANSFORMS YOUR OPERATIONS AND ENGAGES PEOPLE
NEA Highlights
- Replaced flush valves with low-flow flush valves
- Replaced standard urinals with waterless urinals
- Irrigation planted more native plants to reduce
need for watering.
22HOW THE LEED EB CERTIFICATION PROCESS
TRANSFORMS YOUR OPERATIONS AND ENGAGES PEOPLE
Sustainable Purchasing
- Ongoing Consumables (Supplies)
- Durable Goods
- Facility Alteration Additions
- Food Lamps
Goal Purchase products that have a lesser or
reduced effect on human health and the environment
23HOW THE LEED EB CERTIFICATION PROCESS
TRANSFORMS YOUR OPERATIONS AND ENGAGES PEOPLE
Developed a process
- Located Supplier
- Collaborate with Vendors
- Communicate with end-users
- Formalized existing or created new purchases
24HOW THE LEED EB CERTIFICATION PROCESS
TRANSFORMS YOUR OPERATIONS AND ENGAGES PEOPLE
Sustainable Purchasing
Lesson Learned The most sustainable purchase is
the non-purchase.
- Example VSP
- Bought 750,000 per year
- Spent 7,587 to buy 1 mug for every employee
- Net savings per year 52,000
- Kept 750,000 Styrofoam cups out of landfill
25HOW THE LEED EB CERTIFICATION PROCESS
TRANSFORMS YOUR OPERATIONS AND ENGAGES PEOPLE
Waste Management
- Educated staff about recycling procedures
- Made recycling convenient
- Replaced individual waste baskets with very small
baskets
26HOW THE LEED EB CERTIFICATION PROCESS
TRANSFORMS YOUR OPERATIONS AND ENGAGES PEOPLE
Indoor Environmental Quality
- Benchmark outside air flow rates
- Improve air quality
- Improve comfort
- Green Cleaning
27HOW THE LEED EB CERTIFICATION PROCESS
TRANSFORMS YOUR OPERATIONS AND ENGAGES PEOPLE
Indoor Environmental Quality
Strategies
- Adjusted outside air flow rates
- Implemented green cleaning products procedures
- Utilized low-VOC materials for maintenance
alterations - Conducted occupant survey
- Building Cleanliness
- Thermal comfort
- Lighting
- Noise
- Work towards satisfying the majority of the
people. Survey requires 80 satisfaction (per
LEED EBOM).
28HOW THE LEED EB CERTIFICATION PROCESS
TRANSFORMS YOUR OPERATIONS AND ENGAGES PEOPLE
Indoor Environmental Quality
VSP Strategy Comfort Complaints
- Treated every complaint like the person was
speaking the truth - Trouble-shoot-ed to find a cause and found real
problems - Did some extra steps for regulars small fans
or individual heaters. - Were successful with getting more people on-board
with the process and making progress with finding
problems.
29HOW THE LEED EB CERTIFICATION PROCESS
TRANSFORMS YOUR OPERATIONS AND ENGAGES PEOPLE
Operational Excellence Achieved
VSP
- Reached 82 waste recycled
- 95 score Energy Star
- 50 annual water savings
- Premium credit - 5 reduction on insurance premium
30HOW THE LEED EB CERTIFICATION PROCESS
TRANSFORMS YOUR OPERATIONS AND ENGAGES PEOPLE
Operational Excellence Achieved
NEA
- 19 first year energy savings
- Trending towards additional 12 savings
- 13 annual water savings
- Reduced paper usage by 1,000,000 sheets
31GREENWASHED OR GREEN ... SINGLE OR TRIPLE BOTTOM
LINE?
Jay Coen Gilbert, B Lab Jay Bolus, MBDC Heather
Gadonniex, Mindclicks Sandy Wiggins, Consilience
LLC
32GREENWASHED OR GREEN ... SINGLE OR TRIPLE BOTTOM
LINE?
Why is Greenwashing Prevalent?
33GREENWASHED OR GREEN ... SINGLE OR TRIPLE BOTTOM
LINE?
Why is Greenwashing Prevalent?
- Companies want to quickly capitalize on green
- Disconnect between marketing science
- Lack of green education
34GREENWASHED OR GREEN ... SINGLE OR TRIPLE BOTTOM
LINE?
ISO Standards ISO 14020 Series Environmental
Labels and Declarations, General Principles
- Type 1 Environmental Seal of Approval
- Type 2 Self-Declared Environmental Claims
- Self-Declared
- Must be verifiable
- Type 3 Environmental Product Quantitative Cycle
Declaration Assessment - LCA (Life Cycle Analysis)
35GREENWASHED OR GREEN ... SINGLE OR TRIPLE BOTTOM
LINE?
Green Companies have sustainability embedded in
all parts of their corporate structure
People
Sustainable Brand/ Sustainable Business
Corporate Governance
Planet
Profits
Employees
36GREENWASHED OR GREEN ... SINGLE OR TRIPLE BOTTOM
LINE?
How to Determine if a Company is Truly
Green? Companies that are Green
- Have third-party verified claims
- Follow internationally recognized practices
- Integrate product and corporate sustainability
37GREENWASHED OR GREEN ... SINGLE OR TRIPLE BOTTOM
LINE?
Case Study Valley Forge Fabrics
- Started 3 years ago
- To date have transferred 50 of products to green
- 35 reduction in CO2 produced by operations
- Proven reduction in water, waste, energy
footprint - Over 70 voluntary employee engagement
- Customer recognition and trust of FRESH equal to
LEED
As the acronym implies, FRESH fabrics are made
from synthetic yarns derived from pre-consumer
and post-consumer recycled products which are
made at a low impact manufacturing
platform. FRESH fabrics are 100 recycled
content - no blends.
38GREENWASHED OR GREEN ... SINGLE OR TRIPLE BOTTOM
LINE?
What can you do to avoid greenwashing in your
company?
- Incorporate sustainability into the core of your
business - Institute Triple Bottom Line policies into
procurement practices - Ask suppliers for 3rd party verification data
39GREENWASHED OR GREEN ... SINGLE OR TRIPLE BOTTOM
LINE?
How can we harness the power of business to solve
cultural societal problems? The B Corporation
(B for Benefit)
Criteria 1 - Expand corporate accountability
through a new legal framework
- 20th Century Corporation
- Shareholder Capital
- Maximize Shareholder value exclusively
- 21st Century Corporation
- Shareholder Capital
- Create Social Shareholder Value
- Transparency
40GREENWASHED OR GREEN ... SINGLE OR TRIPLE BOTTOM
LINE?
The B Corporation
Criteria 2 Drive social impact through 3rd
Party standards
- B Impact Rating System
- Free web-based tool to assess company
- Difference between good company and just good
marketing - Meet higher standard of social and environmental
performance, accountability and transparency
41GREENWASHED OR GREEN ... SINGLE OR TRIPLE BOTTOM
LINE?
The B Corporation
Over the last 10 years the leaders of the green
movement have transformed the Building Industry
Over the next 10 years the leaders of the green
movement can transform the Economy
www.bcorporation.net
42COMMISSIONING AND ENERGY MODELING VALUE, COST and
PROJECT INTEGRATION
Phillip G. Bernstein Vice President of Building
Industry AutodeskVivian Loftness Professor,
Carnegie Mellon UniversityGeorge Denise Global
Account Manager, Cushman WakefieldTed van der
Linden Director of Sustainability, DPR
Construction, Inc.Kim Shinn Principal, TLC
Engineering for ArchitectureMalcolm Lewis
President/CEO, CTG Energetics, Inc.
43COMMISSIONING AND ENERGY MODELING VALUE COST and
PROJECT INTEGRATION
Commissioning Audience Survey 1000 attendees
No or Disagree
Maybe or Dont Know
Yes or Agree
Voting Cards
44COMMISSIONING AND ENERGY MODELING VALUE COST and
PROJECT INTEGRATION
Commissioning Audience Survey 1000 /-
attendees
45COMMISSIONING AND ENERGY MODELING VALUE, COST and
PROJECT INTEGRATION
Energy Modeling Take Aways
- Track record on average, not good at predicting
absolute energy usage. - Very good at comparing scenarios
- Reason for 1is that energy modelers are using
best case scenario usage Building used as
planned and the people maintaining and occupying
doing so as intended (for example no manual
over-rides) - Need more Measurement Verification You cant
improve what you cant measure. - Needs to be used to inform system selection
decisions, not just to confirm usage after
selections are made.
46MAKE IT RIGHT A PERFORMANCE BUILDING LABORATORY
Mike Holmes, Make It Right Sarah Howell, John C.
Williams Architects, LLC Jon Sader, Make It
Right New Orleans, LLC Katherine Grove, William
McDonough Partners (Moderator)
47MAKE IT RIGHT A PERFORMANCE BUILDING LABORATORY
Overview of Program
- 27 Prototype Houses
- Small House Performance Laboratory
- 13 LEED Platinum Certified Homes
- Avg score of 88
- Constant Collaboration Designers, Owners,
builders, code officials - Every generation of house is built better
48MAKE IT RIGHT A PERFORMANCE BUILDING LABORATORY
Philosophy of Construction Process Learn
Implement - Teach
- Managers and Contractors learn how to build a
particular prototype - The prototype gets built (Implement)
- Then they teach it to other contractors who will
build future versions of the prototype
49MAKE IT RIGHT A PERFORMANCE BUILDING LABORATORY
Building Laboratory
- Six different construction types
- Stick Built
- 3 Structural Insulated Panels (SIPS)
- 2 wood SIPS
- 1 steel SIPS
- Modular
- Saebi Alternative Building System (SABS
concrete coated foam) - Cross-Training contractors
50MAKE IT RIGHT A PERFORMANCE BUILDING LABORATORY
House Prototype Kieran Timberlake (Architects)
- 1,200 SF
- House will evolve over the generations built
- 1st generation panelized exterior walls
(structural insulated panels SIPS) with steel
skin and foam insulation core. - 2nd generation - modular
- Steel stud interior walls
- Geothermal heating
- Trellis on entire side of house for a natural
plant canopy
51MAKE IT RIGHT A PERFORMANCE BUILDING LABORATORY
House Prototype William McDonough (Architects)
- 1,800 Total SF
- 1,400 SF Primary residence
- 400 SF Secondary Apt
- Chases shade At any time of day there is a
shady area outside to rest. - Cradle to Cradle All materials are recyclable
to flow into biological cycle
52MAKE IT RIGHT A PERFORMANCE BUILDING LABORATORY
House Prototype Morphosis Float House
- 945 SF
- Base is expanded polystyrene foam coated in glass
fiber reinforced concrete, with all required wall
anchors, electrical, mechanical and plumbing
systems pre-installed - In event of flood will float above piers
- SIPS panelized exterior walls
53MAKE IT RIGHT A PERFORMANCE BUILDING LABORATORY
Construction Innovation 16 OC vs 24 OC
- 24 OC is a method of saving material (LEED for
Homes Credit ?) - Single top bottom plate
- Added glue to 24 OC
- Tested mock-up sections at Univ. of NO College
of Engineering - Tested 5 times stronger than required by code
54MAKE IT RIGHT A PERFORMANCE BUILDING LABORATORY
Product Innovation Pervious Concrete
- Pervious concrete is needed to meet goals of zero
run-off for each site - Testing mixes to make stronger version for
increased durability. - Training contractors to install material
55THE ROOFTOPS OF AMERICA A PLATFORM FOR A
SUSTAINABLE FUTURE
Steven Peck, Green Roofs for Healthy Cities Scott
Sklar, The Stella Group, LTD Molly
Trombley-McCann, Cool Roof Rating Council James
Hoff, The Center for Environmental Innovation in
Roofing
56THE ROOFTOPS OF AMERICA A PLATFORM FOR A
SUSTAINABLE FUTURE
Roofing Installation Fact
- Each year 4 billion SF of roofing installed
- 1 billion new
- 3 billion roof replacements
- If this 4 billion of roofing installed in
compliance with LEED EA Credit 1 Standard - Save 1.8 billion in energy savings per year
57THE ROOFTOPS OF AMERICA A PLATFORM FOR A
SUSTAINABLE FUTURE
Cool Roof Rating Council (CRRC)
- Non-Profit Organization
- Cool Roof Rating System
- Measuring/Rating System for Roofing Systems
- Solar Reflectance Ability to reflect solar
energy - Thermal Transmittance
- Initial and 3-yr values
- 3 sites in 3 regions
- ANSI Accredited
58THE ROOFTOPS OF AMERICA A PLATFORM FOR A
SUSTAINABLE FUTURE
Cooler Roofs mean
- Less heat transfer into building (Reduced heat
load and energy to cool building) - Reduced peak energy demand Hottest time of the
day is usually the when electric rates are the
highest - Reduced Urban Heat Island
59THE ROOFTOPS OF AMERICA A PLATFORM FOR A
SUSTAINABLE FUTURE
Cool Roof Misconceptions
- Cool Roof White Roof
- Cool Roof Flat, Low Sloped Roof
- Cool Roof is effective in hot climates only
60THE ROOFTOPS OF AMERICA A PLATFORM FOR A
SUSTAINABLE FUTURE
New Cool Roof Materials
- Thermocramatic Mood Roof changes with the
temp. White when temperature is hot, black when
temperature is cold. - Cool Colored roofs Reflecting the colors we
dont see Look this up - Nano-scale reflective glass micro-sphere
technology Look this up
61THE ROOFTOPS OF AMERICA A PLATFORM FOR A
SUSTAINABLE FUTURE
Green Roofs for Healthy Cities
- Non-Profit Organization
- To increase awareness of green roofs walls
- Gather and disseminate performance data on green
roofs - Increase education and knowledge
- Yearly conferences started in 2003, Chicago
62THE ROOFTOPS OF AMERICA A PLATFORM FOR A
SUSTAINABLE FUTURE
Green Roofs for Healthy Cities - Resources
- Green Roof Tree of Knowledge
- Full-featured database on research and policy
related to green roof infrastructure. - Green Wall Fund
- research community to undertake research and to
produce research data on, but not limited to, the
aspects of exterior green walls identified below.
- Biodiversity Protocol
- Publication defining the most common definitions
of a green roof, focusing on biodiversity. - Green Save Life Cycle Calculation
- Green roof Life Cycle Costing Calculator
capable of assessing 3 investment scenarios
side-by-side over a period of up to 60 years - Provide Professional Training
- Green Roof Professional Accreditation Program
63THE ROOFTOPS OF AMERICA A PLATFORM FOR A
SUSTAINABLE FUTURE
Rooftop Energy Facts Solar Photovoltaic,
Solar-Thermal - Wind
- Easy access to sun wind
- Low-cost real-estate
- No additional land acquisition
- Minimum development cost most if not all of
infrastructure exists - Property already generating economic value
- Close to the customer Close to the grid
- Zero-Energy buildings are not achievable without
rooftop energy