Description:

It includes: general type, size, plans and specifications, time, place date of bid opening ... General Conditions ... Condition: bidder 4 refused to accept the ... – PowerPoint PPT presentation

Number of Views:14
Avg rating:3.0/5.0
Slides: 16
Provided by: civil83
Category:

less

Transcript and Presenter's Notes

Title: CIVL202 Construction Engineering I


1
CIVL202Construction Engineering I
  • Tutorial 2
  • T1 Mon 1100 1150
  • T2 Wed 0900 0950

2
Tutorial Outline
  • Notice to Bidders
  • Bid Package
  • Proposal Form
  • Contract Price
  • General Conditions
  • Supplementary Conditions
  • Technical Specifications
  • Addenda
  • Contractors decision to bid
  • Prequalifications
  • Subcontractors
  • Bid Bond

3
Notice to Bidder
  • Definition announcement that the design document
    are available and bids are ready to receive
  • It includes general type, size, plans and
    specifications, time, place date of bid opening

4
Bid Package
  • Things to be included
  • Proposal form
  • General conditions based on similar type of
    project
  • Specific conditions different with projects
  • Technical specification
  • Plans and drawings

5
Proposal Form
  • Definition it indicates contractors intention
    to enter into contract to complete specific work
    at specified price
  • Contract price lump sum and unit price

6
Contract price
  • Lump sum the amount of money the client is
    willing to pay for certain construction item
  • Unit price the price of every unit of
    material/construction price of a particular item

7
General Conditions
  • Defining the rights, privileges and
    responsibilities of different parties
    (contractor, client and designer)
  • Enforced by law

8
Supplementary Conditions / Specific Conditions
  • Unique in particular project
  • Changes to general conditions

9
Technical Specification
  • Description of the technical requirements
  • Related to quality of different components of
    work
  • Stating specific brand or model of material or
    equipment

10
Addenda
  • Stating the changes in details of contract,
    additions, corrections and contract conditions

11
Contractors decision to bid
  • Quantity takeoff determining the required
    material quantities on a job
  • Example in lecture
  • Assume the contractor would like to bid for four
    project,
  • cost of bidding each project 50,000
  • if the contractor could get one bid, the profit
    it would earn in the project should cover the
    entire bidding cost (200,000)

12
Prequalification
  • Clients judgment on whether the contractor is
    capable or not, it is based on the history of the
    contractor on similar project
  • If the contractor is not capable to complete
    project, even the bid price is low, the client
    will not consider

13
Subcontractors
  • The cost of work done by sub-contractor as well
    as the work done by the prime contractor will be
    included in the bid price
  • The prime contractor will integrate the quotation
    of construction cost into the total bid price

14
Bid Bond
  • Definition to protect the clients from the
    failure of the contractor to start the project
  • Example in lecture
  • Assume there are four bidders,
  • Bidder 1 2.0M
  • 2 1.8M
  • 3 1.6M
  • 4 1.5M

15
  • Condition bidder 4 refused to accept the
    contract, bidder 3 will be chosen.
  • In the bid price, it includes the price of bid
    bond(20 of the bid price) and the price of
    hiring the bonding company(0.5 3 of the bid
    price)
  • If bidder fails to start the project
  • Damage to the client 1.6M 1.5M 0.1M
  • the bonding company will have to pay for the bid
    bond
  • But afterwards, the contractor will have to pay
    the bonding company back the amount of bid-bond
Write a Comment