Damage Control Rapid Plotting - PowerPoint PPT Presentation

1 / 46
About This Presentation
Title:

Damage Control Rapid Plotting

Description:

... sheets are designed to provide guidance through the casualty ... Electrical damage: List equipment or system. Mechanical failure: List equipment or system ... – PowerPoint PPT presentation

Number of Views:241
Avg rating:3.0/5.0
Slides: 47
Provided by: emb6
Category:

less

Transcript and Presenter's Notes

Title: Damage Control Rapid Plotting


1
Damage Control Rapid Plotting
2
Enabling Objectives
  • 1 Select statements which describe the purpose
    of DC diagrams, status boards and logs
  • Record casualties on isometric DC
  • diagrams
  • 3 Given a DC scenario record damage control
    messages
  • 4 Match damage control symbols to the situation
    they represent

3
Failure to Communicate
  • Crew interviews and analysis of plots and
    handwritten messages after casualties on USS
    Samuel B. Roberts, USS Stark and USS Cole
    revealed
  • Improper use of complex triangle symbology
  • Damage control decision makers had limited
    knowledge of sequential actions to combat
    casualties
  • Minimal crew training on symbology
  • Improper display of information on message blanks

4
  • Challenge Reduce the complexity of triangle
    symbology
  • Solution Rapid Plotting Symbology, DCAMS

5
Initiatives to ImproveDC Plotting
  • Rapid plotting symbology
  • Rapid plotting message blanks
  • DC casualty checklists
  • DCAMS (Damage Control Action Management Software)
  • Shipboard flag training kits

6
Rapid Plotting Symbology
  • Replace triangle symbology
  • Simplifies plotting
  • Improves display of symbology on DC plates
  • Will appear in revision of NSTM 079, vol. 2,
    Practical Damage Control

7
Damage Control Rapid Plotting
  • Universal symbology standard of circle and
    slashes combined with simplified plotting
    requirements.
  • The circle and slash system eliminates the
    requirement to have several flags on the side of
    the triangle.
  • Simplified plotting requirements are accomplished
    with check sheets.

8
Damage Control Rapid Plotting
  • Check sheets similar to the Main Space Fire
    Doctrine will replace the cluttered plotting
    details that obscure the big picture of the ships
    condition with noise.
  • Check sheets are designed to provide guidance
    through the casualty process, track and document
    details and events.
  • Check sheets eliminate the requirement to plot
    things such as mechanical and electrical
    isolation.
  • Checklist examples can be found at
    www.dcfp.navy.mil as DC Tricks of the Trade 007
    in the Library

9
Rapid Plotting Symbology
  • Three symbols represent key events in a casualty.
  • Example for Class Alpha fire
  • Casualty Reported
  • Casualty Engaged
  • No Casualty
  • (Fire is out.)

A
A
A
10
Rapid Plotting Symbology
  • Example for ruptured piping
  • Casualty Reported
  • System
  • Casualty Engaged
  • No Casualty
  • (Rupture is repaired
  • or bypassed.)

R
FM
R
R
11
NSTM 079 DCAMS 5.02 Casualty Icons
Hole in Deck - Below Reported, Engaged, No
Smoke (unknown) Reported, Engaged, No
Fire (unspecified) Reported, Engaged, No
Black Smoke Reported, Engaged, No
Hole in Deck - Over Reported, Engaged, No
Fire (Class A) Reported, Engaged, No
Fire (Class B) Reported, Engaged, No
White Smoke Reported, Engaged, No
Hole in Bulkhead Reported, Engaged, No
Fire (Class C) Reported, Engaged, No
Flooding Reported, Engaged, No
Fragmentation Reported, Engaged, No
Heat Transfer Reported
Debris Reported, Engaged, No
Fire (Class D) Reported, Engaged, No
12
NSTM 079 DCAMS 5.02 Casualty Icons
Rupture Reported, Engaged, No
AFFF Rupture Reported, Engaged, No
Rupture-Potable Water Reported, Engaged, No
Rupture - Fire Main Reported, Engaged, No
Rupture - Chill Water Reported, Engaged, No
Rupture - Steam Reported, Engaged, No
Rupture- Fuel Oil Reported, Engaged, No
Rupture- Electrical Cooling Water Reported,
Engaged, No
Rupture- Salt Water Reported, Engaged, No
Rupture- JP5 Reported, Engaged, No
Rupture- Hydraulic Oil Reported, Engaged, No
Rupture-Lube Oil Reported, Engaged, No
Rupture-Pressurized Air Reported, Engaged, No
13
NSTM 079 DCAMS 5.02 Casualty Icons
Point of Impact Reported, Engaged, No
Communications Lost Reported, Engaged, No
Chemical Hazard Reported, Engaged, No
Structural Damage Reported, Engaged, No
Mechanical Failure Reported, Engaged, No
Biohazard Reported, Engaged, No
Electrical Power Lost Reported, Engaged, No
Mechanical Damage Reported, Engaged, No
Radiation Hazard Reported, Engaged, No
Electrical Damage Reported, Engaged, No
HAZMAT/Toxic Spill Reported, Engaged, No
Casualty Power Lost Reported, Engaged, No
Unexploded Ordnance Reported, Engaged, No
14
Damage Control Checklist
Decision Aids Request Action Enhanced
Communications
15
Shipboard Flag Training Kits
  • Damage Control Training Teams / Afloat Training
    Groups use the standardized kits to nonverbally
    initiate and conduct damage control drills.
  • Flags have Rapid Plotting Symbology printed on
    them to alert Investigators and other shipboard
    personnel to specific casualties.
  • Provides crew with continuous exposure to Rapid
    Plotting Symbology.

16
Rapid Plotting Message Blanks
  • Rapid plotting message blanks and DC plates will
    be used as a backup if Automated Damage Control
    Software or wireless communications fail.
  • Rapid plotting message blanks use three symbols
    instead of the six symbols employed with the
    triangle system.

17
Mechanics of plotting Casualties
  • Three primary reports are recorded on the DC
    plates 2 3 that represent the key events in the
    casualty
  • Casualty reported
  • Casualty Engaged
  • No Casualty

A
A
A
18
Mechanics of plotting(cont)
  • Message blank
  • Time and sequential number
  • Who it is from and to whom it is going
  • Compartment number, frame number, remarks etc..
  • Damage must be pinpointed (Port/Stbd, Deck/ Ovhd,
    Fwd/Aft)
  • Fire/smoke/flooding boundary reports shall have
    primary and secondary boundaries listed

19
Mechanics of plotting (cont)
  • Installed system messages require the following
  • System (Halon, AFFF, APC, Bilge Spr, CMWD)
  • Time activated/released, secured
  • Group number (if required)
  • Ruptured piping messages shall contain
  • Cut-out valve(s) used
  • System if known
  • Affected system(s)

20
Five Sections of the Rapid Plotting Message Blank
1. Originator / Time
TIME
NUMBER FROM TO
FM INV - SL
DCRS 2
2. Casualty Space / Remarks
DCRS 3
DCRS 5
DCC
COMPT. /NAME
FRAME
3. Casualty Symbology
REMARKS
OVHD
FWD
4. Specific Location of Damage
STBD
PORT
AFT
S P P S
DECK
5. Boundaries
BOUNDARIES
FB - SB - FLB - CB
21
Rapid Plotting Message Blank
TIME
NUMBER FROM TO
  • Rapid plotting message blanks
  • must be tailored in section 1 to
  • your specific ship

FM INV - SL
DCRS 2
DCRS 3
DCRS 5
DCC
COMPT. /NAME
FRAME
REMARKS
OVHD
FWD
STBD
PORT
AFT
S P P S
DECK
BOUNDARIES
FB - SB - FLB - CB
22
Reverse Side of Message Blank
23
Addressing the Message
First message of the set
1
1627
TIME
NUMBER FROM TO
Sent at1627
R
FM INV - SL
FM
DCRS 2
DCRS 3
DCRS 5
1627
1
DCC
2-58-2-Q
COMPT. /NAME
FM Fire Marshal INVInvestigator SL On Scene
Leader
60
FRAME
REMARKS
OVHD
FWD
STBD
PORT
From the Fire Marshal
AFT
S P P S
DECK
To DCRS 5
BOUNDARIES
FB - SB - FLB - CB
24
Addressing Others
First message of the set
Sent at1627
  • Other Teams / Locations
  • Bridge
  • Medical / Triage
  • CCA
  • Decon stations
  • Air staging area
  • Hangar
  • Weather deck
  • Secondary DCC
  • Secondary Conn

1627
1
TIME NUMBER FROM
TO

Triage
FM INV - SL
DCRS 2
DCRS 3
DCRS 5
DCC
From Triage area
FM Fire Marshal INVInvestigator SL On Scene
Leader
To DCRS 5
25
Casualty Space / Frame / Remarks
1
1627
TIME
NUMBER FROM TO
R
2-58-2-Q
Compt. / Name
FM INV - SL
FM
DCRS 2
60
DCRS 3
FRAME
DCRS 5
DCC
REMARKS
2-58-2-Q
COMPT. /NAME
60
At Frame 60
FRAME
In space 2-58-2-Q
REMARKS
OVHD
FWD
Casualty Space / Remarks Section
STBD
PORT
AFT
S P P S
DECK
BOUNDARIES
FB - SB - FLB - CB
26
Casualty Symbology
1
1627
TIME
NUMBER FROM TO
R
R
FM INV - SL
FM
Reported
DCRS 2
FM
DCRS 3
DCRS 5
DCC
2-58-2-Q
COMPT. /NAME
60
FRAME
REMARKS
Engaged
OVHD
FWD
No Casualty
STBD
PORT
AFT
S P P S
DECK
A note area is located below each report box.
BOUNDARIES
FB - SB - FLB - CB
27
Note Area
  • Write amplifying information in the Note Area.
    Acceptable information includes, but is not
    limited to
  • Smoke List color of smoke
  • Fire extinguishing system List system type,
    time
  • manned, time activated / secured
  • Flooding List depth (in feet and inches),
    dewatering equipment used, if water is clean or
    contaminated
  • Firefighting water List depth (in feet and
    inches) and dewatering equipment used or
    recommended
  • Progressive flooding List depth of water (in
    feet and inches) and dewatering equipment used or
    recommended, approximate rate of water entering
  • Ruptured piping system List system type, cut
    out valve numbers, sys effected
  • Structural damage List type of damage and
    recommended shoring used
  • Jammed fitting List fitting number and type

S
BLACK
28
Note Area(cont)
  • Hole List size of hole (in feet and inches)
  • Communications lost List circuit(s)
  • Electrical damage List equipment or system
  • Mechanical failure List equipment or system
  • Personnel casualty List persons name and
    billet (if known)
  • Weapon casualty List weapon type
  • Toxic gas List hazard (if known)
  • Chemical contamination List agent (if known)
    and location
  • Biological contamination List agent (if known)
    and location
  • Radiological contamination List intensity (if
    known) and

H
10 IN
29

1
1627
Leak is in the overhead.
TIME
NUMBER FROM TO
R
OVHD
FM INV - SL
FM
FWD
DCRS 2
DCRS 3
DCRS 5
DCC
2-58-2-Q
COMPT. /NAME
PORT
60
FRAME
STBD
REMARKS
OVHD
AFT
FWD
DECK
STBD
PORT
Leak is on the port side of the space in
the overhead.
AFT
S P P S
DECK
BOUNDARIES
FB - SB - FLB - CB
30
Mechanics of plotting Boundaries
Three primary reports are recorded on the DC
plates 23 that represent the two key events in
setting Boundaries Boundaries Ordered
Boundaries Set
FB
FB
31
Mechanics of plotting Boundaries
FB - Fire Boundary Primary and secondary around
fire. SB - Smoke Boundary Smoke Primary and
secondary around smoke. FLB - Flooding
Boundary Flooding Boundary Primary and
secondary around Flooding. CB - Casualty
Boundary Casualty Boundary Primary and
secondary around multi casualty area. Example A
missile strikes the ship aft, casualty boundaries
are set around the area.
32
Boundaries

Boundaries Ordered indicated by dash
Flooding Boundary Set
BOUNDARIES
S P P S
FB - SB - FLB - CB
FB - SB - FLB - CB
44
68
77
58
Boundaries Set indicated by circle
Secondary- FWD
Secondary-AFT
Pr ima r y - FWD
Pr ima r y -AFT
FB - Fire Boundary SB - Smoke
Boundary FLB - Flooding Boundary CB -
Casualty Boundary
FB - SB - FLB - CB
33
Boundaries

6
1635
TIME
NUMBER FROM TO
Flooding Boundary Set
FM INV - SL
DCRS 2
BOUNDARIES
S P P S
DCRS 3
DCRS 5
DCC
2-58-2-Q
COMPT. /NAME
FB - SB - FLB - CB
44
68
77
58
60
FRAME
REMARKS
OVHD
Secondary- FWD
Secondary-AFT
Pr ima r y - FWD
Pr ima r y -AFT
FWD
FB - Fire Boundary SB - Smoke
Boundary FLB - Flooding Boundary CB -
Casualty Boundary
STBD
PORT
AFT
S P P S
DECK
Boundaries section
BOUNDARIES
44
77
68
58
FB - SB - FLB - CB
34
Manual Plotting Methods
  • Box Method
  • Line Method
  • Column Method

B
FB
77
68
58
44
1726
B
FB
1726
68
58
44
77
B
1726
FB
77
68
58
44
35
Box Method
1610
1
B
2-60-0-E
38
S P P S
2-60-0-E
1614
2
S
S
B
Black
Black
1610
1614
2-60-0-E
S P P S
36
Line Method
1610
1
B
2-60-0-E
38
S P P S
1614
2
S
Black
2-60-0-E
S
B
Black
1610
1614
S P P S

37
Column Method
1610
1
B
2-60-0-E
38
B
1610
S P P S
S
Black
1614
1614
2
S
Black
2-60-0-E
S P P S

38
The following seven slides display message
writing examples for
  • Fire
  • Flooding (2)
  • Ruptured Piping
  • Structural Damage (2)
  • Chemical Attack

39
Fire
9
1623
TIME
NUMBER FROM TO
FM INV - SL
DCRS 2
DCRS 3
DCRS 5
DCC
2-210-2-A
COMPT. /NAME
FRAME
REMARKS
OVHD
FWD
STBD
PORT
A
AFT
S P P S
DECK
BOUNDARIES
FB - SB - FLB - CB
40
Flooding
1
1623
TIME
NUMBER FROM TO
FL
FM INV - SL
5 FT 6 IN
DCRS 2
DCRS 3
DCRS 5
DCC
2-210-2-A
COMPT. /NAME
FRAME
Clean SW
REMARKS
OVHD
FWD
STBD
PORT
AFT
S P P S
DECK
BOUNDARIES
FB - SB - FLB - CB
41
Flooding
2
1632
TIME
NUMBER FROM TO
FM INV - SL
DCRS 2
DCRS 3
DCRS 5
DCC
2-210-2-A
COMPT. /NAME
FRAME
FL
REMARKS
OVHD
2FT 4 IN
FWD
ESP
STBD
PORT
AFT
S P P S
DECK
BOUNDARIES
FB - SB - FLB - CB
42
Ruptured Piping
3
1623
TIME
NUMBER FROM TO
FM INV - SL
DCRS 2
DCRS 3
DCRS 5
DCC
2-210-2-A
COMPT. /NAME
FRAME
COV2-218-2
R
REMARKS
OVHD
FM
FWD
STBD
PORT
AFT
S P P S
DECK
BOUNDARIES
FB - SB - FLB - CB
43
Structural Damage
1
1623
TIME
NUMBER FROM TO
STR
FM INV - SL
SAG
DCRS 2
DCRS 3
DCRS 5
DCC
2-210-2-A
COMPT. /NAME
226
FRAME
REMARKS
OVHD
FWD
STBD
PORT
AFT
S P P S
DECK
BOUNDARIES
FB - SB - FLB - CB
44
Structural Damage
2
1623
TIME
NUMBER FROM TO
FM INV - SL
DCRS 2
DCRS 3
DCRS 5
DCC
2-210-2-A
COMPT. /NAME
231
FRAME
STR
Steel Shoring I type
REMARKS
OVHD
Sag
FWD

STBD
PORT
AFT
S P P S
DECK
BOUNDARIES
FB - SB - FLB - CB
45
Chemical Attack
1
1623
TIME
NUMBER FROM TO
CHM
FM INV - SL
Nerve
DCRS 2
DCRS 3
DCRS 5
DCC
weather deck
M-9
COMPT. /NAME
162
FRAME
MWB davit
REMARKS
OVHD
FWD
STBD
PORT
AFT
S P P S
DECK
BOUNDARIES
FB - SB - FLB - CB
46
Summary
  • Simple in concept
  • User Friendly
  • Supported by shipboard flag training kit.
  • Provides a clear Big Picture
  • Support transition from paper to standard
    e-Damage Control, DCAMS software, Laptops in
    DCRS, PDAs at the scene and wireless data.
Write a Comment
User Comments (0)
About PowerShow.com