Title: Progress Report of ECAL Work in Beijing
1Progress Report of ECAL Work in Beijing
Hesheng Chen Institute
of High Energy Physics, CAS Oct.
27-31, 2003, AMS TIM, CERN
2Outlines
- ECAL SQ Tests in Beijing
- FEM Model Correlation after SQ Tests
- Weight Saving of ECAL Structure
- Prepare for ECAL flight Module Manufacture
- Future study on data of ECAL Beam Test
31. ECAL SQ Tests in Beijing
- Jan. 2003 the final assembly of ECAL prototype
was done in IHEP, and the ECAL Space
Qualification Tests (SQT) was completed in BISEE
according to the relevant documents and specific
conductions from NASA/LM. - 4 engineers from LM and Mr. Franck Cadoux
from LAPP joined with us during the SQT. - ECAL SQT was successful.
4 Final assembly of ECAL is ready in IHEP
workshop in Jan. 9, 2003.
5 ECAL in Vibration Tests and
Sine Burst along horizontal direction, in BISEE.
6 ECAL was in Vibration Tests
and Sine Burst along vertical direction, in
BISEE
72. FEM Model Correlation after SQ Tests
- After ECAL SQ Tests, we started the FEM
analysis for model correlation following the
suggestion from LM engineers and the agreement in
ECAL group. The work was cooperated with Yi Wang
at CERN. - See the talk by Dr. Yi Wang.
- The FEM Model Correlation have been
accepted by LM.
8From Martin, Trent mailtotrent.martin_at_lmco.com
Sent Monday, September 22, 2003 346 PM To Yi
Wang Cc Bollweg, Ken Balas, Chittur Tutt,
Chris franco.cervelli_at_pi.infn.it Jean-Pierre
Vialle Chen Hesheng Franck
Cadoux Subject RE Progress on ECAL FEM
Correlation This looks much better than what
you had before. It is acceptable to use this
model for the Safety Review and the weight
savings analysis. Please do not make any changes
to the brackets for your weight savings
efforts. Please document your results in a
formal report and forward to us prior to the end
of October to support the Phase II safety review
data package. Thanks, Trent
93. Weight Saving for ECAL Structure
- Based on this new FEM Correlation Model, and
- the detailed analysis about the stresses, margin
of - safety, natural frequencies, displacements, also
check - bolts M.S., fail and safe analysis, etc. We
discussed with the mechanical engineers and
manufacture engineers for the detail technical
procedures for ECAL manufacture, now - we suggest the following weight saving plan
10Basic ECAL Mechanical Structure
11Main Parts in the structure
12Original saving (before SQT) only by cut 2 raw
square holes on 2 Side Panels (4 raw PMTs)
3.2kg
Fasteners change increased 0.8 kg Thus the total
weight is 73.6kg.
13Our New Weight Saving
1) cutting vertical slots on side panels
Mass reduction 0.1kgx20.1kgx20.4kg
Before
After
142) Decreasing the depth of PMT holes from 38mm to
18mm
Mass reduction 1.4kg x 2 1.6 kg x 2 6.0kg
38mm
18mm
After
Before
153) Cutting horizontal grooves on side panels
Mass reduction 0.18 kg x 4 0.7 kg
164) Decreasing plate thickness due to material
changed to AL-7050
Mass reduction 0.1 kg x 4 0.4 kg
18mm
20mm
After
Before
175) Cutting triangle holes on side walls
Mass reduction 0.07kgx4 0.28 kg
Before
After
186) Cutting rectangular holes on back wall
Mass reduction 0.1kg x 4 0.4kg
Before
After
19Mass increasing due to additional anti-loose caps
1 piece 24g Quantity 16 Sub 384 g
1 piece 14g Quantity 8 Sub 112 g
Total 0.5 k g
20Mass reduction summary
21- The weight of ECAL Structure will be reduced
from - Before SQT 76 kg 3.2 kg 0.8kg 73.6 kg
This reduction 7-7.5 kg. - the expected final weight 66.1 - 66.6 kg
224. Prepare for ECAL flight Module Manufacture
- 45 months are expected to produce Flight
Module - Before the production started, we have to
- 1) Agreement in ECAL group in the weight
reduction approval by LM - To check interfaces with panecake and PMT support
parameters of all dimensions - The new engineering drawings based on the new
weight saving plan frozen parameters
234) fixed manufacture schedule of Flight
Module 5) order materials - AL. 7075 and
relevant fasteners (help from LM) - Spring
Foam A274 (help from Pisa) 6) Send Pancake with
the assembly plate to Beijing We are
happy to have an engineering meeting beforehand
in Beijing for the discussion of technical
interface.
245. Future study of ECAL prototype Beam Test data
- Improve e/p separation
- Titled impact
- Effective area
- Preliminary !
25e/p separation Update
- electron preselection
- in addition to from number of hits and energy
per hit cut, shower start point is required to be
inside the first superlayer to select electrons
in the electron run - energy mixed electrons were used to train
- against proton with 120 GeV
26Neural network cut 0.97 50 GeV electron
efficiency 90 120 GeV proton efficiency
0.45 ECAL alone
27At 120GeV proton efficiency 0.45 , electron
with different energies stay at around 90 with
ECAL alone normal impact in the middle
of ECAL.
28Normal impact vs tilted impact
As for the energy resolution difference is
small. but 10 Degree is the best
29Normal impact vs tilted impact
The difference in angular resolution, is
small. 10 degree is also the best.
30Normal impact vs tilted impacte/p separation
Trained against 120GeV proton with normal impact
in middle. For 120GeV electron, 20 degree is the
best.
31Effective area energy measurement
Energy mean value and resolution of electron
impact on the last PMT is deteriorated Dead PMT
causes more severe problem.
32Effective area angle measurement
- For electrons with normal impact on the
- last PMT on edge
- mean value deviate
- from impact angle by more than one sigma
- resolution is not deteriorated too much.
33Effective area e/p separation
xy
In compare with 120GeVproton normal impact
in middle, electron efficiency is not
deteriorated on edge and even on corner.
y5
With proton efficiency 0.45
34Thanks
35ECAL test configuration in Z direction
36ECAL test configuration in X and Y direction
37Summary
- For normal impact, the effective area is
- the region with
- 34PMTs X 34PMTs
- To know the effective area changes with
- impact angle, more (runs) and better (without
dead PMT) data is needed.