Uninterruptible Power Source UPS Status - PowerPoint PPT Presentation

1 / 10
About This Presentation
Title:

Uninterruptible Power Source UPS Status

Description:

Battery Management System. UPS Mounting Location. Progress ... Cells, Bricks, and Battery Management System (BMS) ... Critical Design Review (CDR) October 2003 ... – PowerPoint PPT presentation

Number of Views:107
Avg rating:3.0/5.0
Slides: 11
Provided by: Lockheed7
Category:

less

Transcript and Presenter's Notes

Title: Uninterruptible Power Source UPS Status


1
Uninterruptible Power Source (UPS) Status
  • P. Nemeth/LM

2
Responsibilities
  • Cells, Bricks, and BMS
  • Yardney/Lithion R. Gitzendanner
  • Battery Casing, Electrical/Mechanical Integration
  • CSIST Jong-Ren Lee
  • Battery Charger
  • CRISA A. Posada
  • Customer/Subcontract Management
  • MIT F. Eppling and S. Ting
  • Technical Management M. Capell/MIT and G.
    Viertel/ETH
  • Subcontract Technical Monitor P. Nemeth/LM

3
CSP Functional Block Diagram
4
Battery Specifications
  • Consists of eight cells, Yardney INCP95/28/151
  • Nominal Voltage 8 X 3.6 V 28.8 V
  • Capacity 28 Ah
  • Operational Temperature Range -30 degC to 50
    degC
  • Capable of supplying 45A pulse at required
    voltage throughout mission profile
  • Battery will provide control power to payload in
    event of loss of ISS power or communication
  • Watch-dog timer/control circuit
  • Normal Ramp down function
  • Quench monitoring
  • Initiation of quench, 45A pulse

5
Yardney/Lithion Cells
6
Bricks
7
Battery Management System
8
UPS Mounting Location
9
Progress
  • UPS Statement of Work baselined 5 March, 2003
  • Sole-Source Justification completed May 2003
  • Contract Awarded 23 June, 2003 to Yardney/Lithion
    for Cells, Bricks, and Battery Management System
    (BMS)

10
Preliminary Milestone Schedule (Cells/Bricks/BMS)
  • Preliminary Design Review (PDR) - 25 August, 2003
    at Yardney/Lithion
  • Critical Design Review (CDR) October 2003
  • PDR for Battery Casing and Electronic/ Mechanical
    Integration at CSIST to follow
  • Cell Qual Testing March to May 2004
  • Flight Cell Screening May to June 2004
  • BMS Qual/Screening May to June 2004
  • Delivery July 2004