Simmie Meredith has started helping with drawings in his free time ... Need to get updated quote from Fike. Will get quotes from two other manufacturers ... – PowerPoint PPT presentation

Number of Views:29
Avg rating:3.0/5.0
Slides: 11
Provided by: Ferm1
Category:

less

Transcript and Presenter's Notes

Title: Status Update for Proton Driver Vertical Test Cryostat


1
Status Update for Proton Driver Vertical Test
Cryostat
  • Mike White
  • TD/Engineering Fabrication
  • January 31, 2006

2
Model
  • Items to be completed
  • Heat Exchanger Piping
  • Phase Separator Piping
  • Instrumentation

3
Drawings
  • Approximately 50 Drawings Created
  • Current drawings have varying degrees of
    completeness
  • Approximately 75 to 100 Total Drawings Required

4
Timeline
  • Simmie Meredith has started helping with drawings
    in his free time
  • Has not been effective yet due to IDEAS problems,
    but problems should be resolved soon (today)

5
Fermilab Parts
  • Checked on the availability of Fermilab supplied
    and manufactured parts
  • bayonets, valves, actuators, etc.
  • Plenty of parts in stock

6
Instrumentation
  • I have model numbers and quotes for all sensors,
    power supplies, and transmitters required
  • Will consult with AD/Cryo one more time before
    ordering parts

7
Miscellaneous Parts
  • Waiting for updated quote from Velan
  • The valve controls flow to vacuum header
  • Waiting for quote from burst disk manufacturers
  • Need to get updated quote from Fike
  • Will get quotes from two other manufacturers

8
Miscellaneous Parts (cont.)
  • Waiting to select check valve
  • Check valve will be used as relief valve
  • Leakage against flow direction critical
  • Circle Seal valve ordered for testing
  • Waiting for quote on relief valve
  • For phase separator
  • All other parts will be supplied by vendor
    manufacturing cryostat

9
Other Engineering Work
  • Specifications should be examined again
  • Checking MAWPs
  • Including information on instrumentation
  • Checking Models and Drawings

10
The End
  • Questions, comments, or concerns?