1Production Planning
- Eric van Herwijnen
- Thursday, 20 june 2002
-
2Contents
- Current capacity channel interest
- Additional capacity (Grid)
- Job organization
- Data Quality Checking
- Improvements to Production tools
3Current MC capacity (estimate)
Center Nr. Of CPUs (GHz) Disk space Channel
CERN 300 MSS
RAL 100 x 1.4 ? (80 x 1 80 x 0.6 60 x 0.45) MSS Bs ? J/? ?
Lyon 30 MSS
Bologna 20 x 0.866 30 x 1 100 x 1.4 2 Tb Bd,s ? ?? ?? ,K? ??,K? K? Bd ? D?(excl,incl) ??
Nikhef 20 x 0.866 120 Gb Bs ? J/? ?
4Current MC capacity (estimate)
Center Nr. Of CPUs (GHz) Disk space Channel
Bristol 20 Bd,s ? ?? ?? , K? ?? Bd ? ?? ?? ?0 Bs ? Ds ? ?? , Ds K? D ? K ? , D ? X
Edinburgh 128
Oxford 10 x 1 0.5 Tb Bd,s ? ?? ??
Cambridge 1 x 0.933 4 x 1 1 x 2 2 x 1.8 2 x 1.9 ? Bd ? D? D?
5Additional capacity (GRID)
- Several centers (Nikhef, Cambridge) are making
CPUs exclusively available through DataGrid - Status DataGrid?
6Organization
- Most centers are operational now
- Sw installed
- Jobs submitted through web interface
- Output and logs sent back to cern
- Bookkeeping db updated
- Install latest versions of Sicbmc and Brunel for
test productions, tar files will be provided
(next week) - Run prototype production (26/6 3/7)
7Job organization (prototype production)
- Prototype production mainly done at CERN but will
also be used to consolidate outside centers - Channel (or generic b/c) job will consist of
- Generation of 1 channel/generic b/c set of 1000
events - Reconstruction of 1 channel set
- Channel DST sent back to CERN
8Job organization (prototype production)
- Channel (or background) job will consist of
- Generation of 3 mbias sets of 500 events for
spillover - Generation of 1 channel set of 1000 events
- All RAWH sent back to CERN
- Channel DST sent back to CERN
9Job organization (production)
- Channel (or background or b/c inclusive) job will
consist of - Generation of 3 mbias sets of 500 events for
spillover - Generation of 1 background/b/c incl set of 1000
events - Channel/background/b/c incl. DST sent back to
CERN - Mbias DST (500 events) sent back to CERN
10Data Quality Check
- Existing program works with Zebra
- Needs to be converted to OODST, merged with
current histograms in Brunel - Centers will be responsible for checking
- Size of output datasets
- Correct filetransfer to CERN
- Correct updating of bookkeeping db
11Improvements to production tools
- Suggestion for removing site dependencies from
Java code to local scripts from Andrei - Prototype installed in Lyon, will be tested in
production - Also installed at CERN, to be tested with new
production/configuration/bookkeeping db and tools