Title: Production Planning


1
Production Planning
  • Eric van Herwijnen
  • Thursday, 20 june 2002

2
Contents
  • Current capacity channel interest
  • Additional capacity (Grid)
  • Job organization
  • Data Quality Checking
  • Improvements to Production tools

3
Current MC capacity (estimate)
Center Nr. Of CPUs (GHz) Disk space Channel
CERN 300 MSS
RAL 100 x 1.4 ? (80 x 1 80 x 0.6 60 x 0.45) MSS Bs ? J/? ?
Lyon 30 MSS
Bologna 20 x 0.866 30 x 1 100 x 1.4 2 Tb Bd,s ? ?? ?? ,K? ??,K? K? Bd ? D?(excl,incl) ??
Nikhef 20 x 0.866 120 Gb Bs ? J/? ?
4
Current MC capacity (estimate)
Center Nr. Of CPUs (GHz) Disk space Channel
Bristol 20 Bd,s ? ?? ?? , K? ?? Bd ? ?? ?? ?0 Bs ? Ds ? ?? , Ds K? D ? K ? , D ? X
Edinburgh 128
Oxford 10 x 1 0.5 Tb Bd,s ? ?? ??
Cambridge 1 x 0.933 4 x 1 1 x 2 2 x 1.8 2 x 1.9 ? Bd ? D? D?
5
Additional capacity (GRID)
  • Several centers (Nikhef, Cambridge) are making
    CPUs exclusively available through DataGrid
  • Status DataGrid?

6
Organization
  • Most centers are operational now
  • Sw installed
  • Jobs submitted through web interface
  • Output and logs sent back to cern
  • Bookkeeping db updated
  • Install latest versions of Sicbmc and Brunel for
    test productions, tar files will be provided
    (next week)
  • Run prototype production (26/6 3/7)

7
Job organization (prototype production)
  • Prototype production mainly done at CERN but will
    also be used to consolidate outside centers
  • Channel (or generic b/c) job will consist of
  • Generation of 1 channel/generic b/c set of 1000
    events
  • Reconstruction of 1 channel set
  • Channel DST sent back to CERN

8
Job organization (prototype production)
  • Channel (or background) job will consist of
  • Generation of 3 mbias sets of 500 events for
    spillover
  • Generation of 1 channel set of 1000 events
  • All RAWH sent back to CERN
  • Channel DST sent back to CERN

9
Job organization (production)
  • Channel (or background or b/c inclusive) job will
    consist of
  • Generation of 3 mbias sets of 500 events for
    spillover
  • Generation of 1 background/b/c incl set of 1000
    events
  • Channel/background/b/c incl. DST sent back to
    CERN
  • Mbias DST (500 events) sent back to CERN

10
Data Quality Check
  • Existing program works with Zebra
  • Needs to be converted to OODST, merged with
    current histograms in Brunel
  • Centers will be responsible for checking
  • Size of output datasets
  • Correct filetransfer to CERN
  • Correct updating of bookkeeping db

11
Improvements to production tools
  • Suggestion for removing site dependencies from
    Java code to local scripts from Andrei
  • Prototype installed in Lyon, will be tested in
    production
  • Also installed at CERN, to be tested with new
    production/configuration/bookkeeping db and tools