WP 5 Logistics and Infrastructure - PowerPoint PPT Presentation

1 / 7
About This Presentation
Title:

WP 5 Logistics and Infrastructure

Description:

Improved solutions for communications in the Barents region and ... WP meeting february 2004 finetuning the budgetary issues. SWOT-analysis continues... – PowerPoint PPT presentation

Number of Views:16
Avg rating:3.0/5.0
Slides: 8
Provided by: mikaran
Category:

less

Transcript and Presenter's Notes

Title: WP 5 Logistics and Infrastructure


1
WP 5Logistics and Infrastructure
  • B2010 - Umeå 20.11.2003

2
WP 5 Main goals
  • Vision
  • Reinforced cross-border transport and
    communication systems
  • Strategic focus
  • To develop communication systems and set focus
    on missing links in the transport infrastructure
    systems (Physical as well as Digital).
  • Planned results
  • Improved solutions for communications in the
    Barents region and identification of missing
    links and malfunctions in the transport
    infrastructure system (Physical as well as
    Digital).

3
WP 5 cooperation with STBR
  • Sustainable Transport in the Barents Region
  • Linking the management group work between the two
    projects to avoid overlapping and to guarantee
    efficient exchange of information between the
    projects
  • STBR Management group meeting 2.12.2003, possible
    place to discuss about work division in between
    two projects
  • B2010 FOCUSES ON PRACTICAL WORK RELATED TO
    LOGISTICAL NEEDS OF COMPANIES

4
WP 5 milestone 1
  • Survey of facts about the infrastructure and
    communication system in the Barents region (STBR)
  • Identification of transport and communication
    needs for industry and citizens (STBR)
  • meeting with STBR 2.12.2003 to talk about work
    division, informing rest of the project about the
    results of the meeting (Oulu)
  • listing regionally the logistical needs and
    central companies and other key players (Oulu to
    act as a reminder) goods people IT-systems
    checking it with other WPs
  • SWOT-analysis based on the present situation
  • WP meeting february 2004 finetuning the
    budgetary issues

5
WP 5 milestone 2
  • SWOT-analysis continues
  • Covering the holes of fact survey with external
    expertise
  • Meetings with other WPs during spring 2004
  • forestry and mining
  • fisheries
  • Large network meeting beginning of June 2004

6
WP 5 milestone 3
  • Based on the findings of logistical needs
    starting to discuss about possible common
    logistical strategy input to STBR What must be
    done to develop logistics in Barents region
  • Meeting according to the time schedule of the
    whole project schedule, autumn 2004

7
WP 5 milestones 4 and 5
  • to be decided and clarified during the project,
    based on the findings from 3 first milestones
Write a Comment
User Comments (0)
About PowerShow.com