Title: DLE to NGS Migration: Contracts Clinic
1DLE to NGS MigrationContracts Clinic
The information in this presentation relates to
plans currently under development and subject to
consultation, and may be subject to change.
Detailed implementation depends upon a number of
factors including the capabilities of suppliers
and the final 21CN network design.
2DLE to NGS MigrationContracts Clinic Aims
Objectives
- To achieve a consensus position on BTs proposed
contracting plan - As far as this is possible to do so
- Identify the steps required in order to enact it
- To improve understanding of the VIC product and
the Implementation process for early tranches of
DLE to NGS interconnect migration to facilitate
development and agreement of contractual terms - Develop and manage an issues list
- Develop and manage contractual documentation
- To agree an action plan next steps
3BTs Contracting Plan
Phase 1 DLE to NGS Migration
Phase 2 End Customer Migration
Phase 3 NGN
- Phase 1 is relatively well understood
- Building a good understanding of engineering
costs - VIC Clinics starting to flesh out
non-engineering costs - Phase 2 impacts across the obligatory products
not just interconnect - Product discussions still ongoing
- Complex undertaking and impacts not fully
understood to enable detailed commercial
discussions to take place - Communication Provider contracts feedback
indicated that smaller bites would be better
received.
4Phase 1 Contracts Documentation
- VIC Supplemental
- Normal approach to introduce a new schedule to
the SIA - No Change to Annexes A, B or D proposed by BT
- Schedule 131
- Deals with the introduction of VIC
- SAN side letter
- Can apply generically to Tranches 1-4 or
individually to each tranche - The choice is open to each individual CP
5Cost Recovery where are we in the process?
- Most Communication Providers have provided BT
with a view of likely engineering costs - Includes engineering project management costs as
appropriate - Required to put a number in the SAN side letter
- Greater understanding required of VIC solution
design required to size non-engineering costs - Top level view (from CPs _at_ VIC clinic 8/2/06) is
costs may arise from - Entering VIC information in billing systems
- Reconciliation of circuit bills
- Management of the supplementary bill for overflow
- Question How do we solve this one for tranche 1
contractually?
6Phase 1 Contract Timetable
VIC Solution Design Workshops Provision Experts
Billing
VIC Clinic to identify discuss issues
VIC product
08/02/06
06/02/06
24/02/06
13/02/06
01 02/03/06
31/03/06
17/03/06
Contract
Contracting Plan/SIA Supp/Sch 13/SAN letter shared
Contracts Clinic (1)
T1 contracts signed
T2 contracts signed
Contracts Clinic (2)
7Agenda for today
- VIC Storyboard
- Whats closed, what new concerns arise?
- What are the concerns with BTs proposed phased
contracts approach? - Detailed Contractual Arrangements for Phase 1
- Thoughts and comments
- Next Steps
- What actions do we need in place to resolve the
key issues we have identified? - Product description update
- VIC Migration guidance document update
- When/should we meet again?