Title: DLE to NGS Migration: Contracts Clinic


1
DLE to NGS MigrationContracts Clinic
  • 24th February 2006

The information in this presentation relates to
plans currently under development and subject to
consultation, and may be subject to change.
Detailed implementation depends upon a number of
factors including the capabilities of suppliers
and the final 21CN network design.
2
DLE to NGS MigrationContracts Clinic Aims
Objectives
  • To achieve a consensus position on BTs proposed
    contracting plan
  • As far as this is possible to do so
  • Identify the steps required in order to enact it
  • To improve understanding of the VIC product and
    the Implementation process for early tranches of
    DLE to NGS interconnect migration to facilitate
    development and agreement of contractual terms
  • Develop and manage an issues list
  • Develop and manage contractual documentation
  • To agree an action plan next steps

3
BTs Contracting Plan
Phase 1 DLE to NGS Migration
Phase 2 End Customer Migration
Phase 3 NGN
  • Phase 1 is relatively well understood
  • Building a good understanding of engineering
    costs
  • VIC Clinics starting to flesh out
    non-engineering costs
  • Phase 2 impacts across the obligatory products
    not just interconnect
  • Product discussions still ongoing
  • Complex undertaking and impacts not fully
    understood to enable detailed commercial
    discussions to take place
  • Communication Provider contracts feedback
    indicated that smaller bites would be better
    received.

4
Phase 1 Contracts Documentation
  • VIC Supplemental
  • Normal approach to introduce a new schedule to
    the SIA
  • No Change to Annexes A, B or D proposed by BT
  • Schedule 131
  • Deals with the introduction of VIC
  • SAN side letter
  • Can apply generically to Tranches 1-4 or
    individually to each tranche
  • The choice is open to each individual CP

5
Cost Recovery where are we in the process?
  • Most Communication Providers have provided BT
    with a view of likely engineering costs
  • Includes engineering project management costs as
    appropriate
  • Required to put a number in the SAN side letter
  • Greater understanding required of VIC solution
    design required to size non-engineering costs
  • Top level view (from CPs _at_ VIC clinic 8/2/06) is
    costs may arise from
  • Entering VIC information in billing systems
  • Reconciliation of circuit bills
  • Management of the supplementary bill for overflow
  • Question How do we solve this one for tranche 1
    contractually?

6
Phase 1 Contract Timetable
VIC Solution Design Workshops Provision Experts
Billing
VIC Clinic to identify discuss issues
VIC product
08/02/06
06/02/06
24/02/06
13/02/06
01 02/03/06
31/03/06
17/03/06
Contract
Contracting Plan/SIA Supp/Sch 13/SAN letter shared
Contracts Clinic (1)
T1 contracts signed
T2 contracts signed
Contracts Clinic (2)
7
Agenda for today
  • VIC Storyboard
  • Whats closed, what new concerns arise?
  • What are the concerns with BTs proposed phased
    contracts approach?
  • Detailed Contractual Arrangements for Phase 1
  • Thoughts and comments
  • Next Steps
  • What actions do we need in place to resolve the
    key issues we have identified?
  • Product description update
  • VIC Migration guidance document update
  • When/should we meet again?