Title: Chakachamna Hydropower


1
Chakachamna Hydropower
  • TDX Power
  • Nicholas Goodman
  • Eric Yould
  • for
  • Alaska Forum on the Environment
  • February 13, 2008

2
Inventory of Alaska Hydropower Potential
  • U.S. Bureau of Reclamation
  • U.S. Army Corps of Engineers
  • 256 sites with continuous power greater than 2500
    KW
  • 192 billion KWH energy potential
  • 40 of the United States untapped hydropower

3
Potential Major Alaska Hydropower Projects
4
Existing Hydropower Statewide
  • 40 projects
  • Most located in Southeast

5
Existing Hydropower Southcentral
  • Eklutna 37.5 MW
  • Bradley Lake 115 MW
  • Cooper Lake 20 MW

6
Susitna Project Location
7
Upper Susitna Dam Sites
8
Susitna Four Dam Scheme
9
Devil Canyon Watana
10
Watana Site Layout
11
Devil Canyon Site Layout
12
Results of Screening Process
13
Alternatives Outside the Susitna Basin
14
Hydro Alternatives
15
Chakachamna Hydropower Investigations
16
Chakachamna Hydro Power
  • Studied by Alaska Power Authority in early 1980s
  • Divert stream flow from Chakachatna River to a
    powerhouse on the McArthur River by way of a 10
    mile 25 foot diameter power tunnel
  • Minimal dam on Chakachamna Lake
  • Installed capacity of 330 MW, generating 1.6
    billion KWH annually
  • Total cost of project in 1980 dollars 1.0
    billion
  • Project is 40 miles from Chugach Electric power
    facilities at Beluga

17
Chakachamna Project Location
18
Chakachamna Aerial View
19
Chakachamna Dam Site
20
Power Plant Site
21
Chakachamna Selected Plan
22
Chakachamna Lake Tap Gate Shaft Inflow to
Power Tunnel
23
McArthur River Underground Powerhouse
(Chakachamna)
24
Chakachamna Lake Outlet Plan
25
CHAKACHAMNA FISHERIES
  • 5 species of salmon use the basin
  • Sockeye the main salmon species
  • Dolly Varden ubiquitous in the streams
  • Lake trout observed in lake
  • Not a large anadromous fishery but worthy of
    protecting
  • Fish ladders at lake outlet required
  • Possible temperature enhancement to river

26
1982 FISH INVESTIGATIONS
27
CHAKACHAMNA WILDLIFE
  • 56 species of birds
  • 16 species of mammals
  • Moose, wolves, lynx, bear, wolverine, other fur
    bearers
  • None on the endangered species list
  • Less impact than other hydro projects of similar
    size

28
Chakachamna Wildlife
29
Geotechnical Considerations
  • Seismic Castle Mountain Fault
  • Volcanic Mount Spurr (1992 1953 eruptions)
  • Glacial Barrier, Blockade, McArthur, Shamrock

30
Geotechnical Overview
31
CHAKACHAMNA DAM SITE
32
CHAKACHAMNA DAM SITE
33
MT. SPURR GEOTHERMAL
34
BARRIER GLACIER
35
KENIBUNA LAKE
36
McARTHUR RIVER POWERHOUSE SITE
37
McARTHUR RIVER UNDERGROUND POWERHOUSE
38
SUSITNA CHAKACHAMNA COMPARED
Susitna Chakachamna
39
SUSITNA CHAKACHAMNA COMPARED
Susitna Chakachamna
40
Next Steps