Title: Hydropower in Nepal
1Hydropower in Nepal
2Nepals Hydropower Development
1911 PHARPING P ? 500 kW 1934 SUNDARIJAL,
Kathmandu P ? 640 kW 1942 CHISANG KHOLA P ? 677
kW 1964 LOHANDRA KHOLA P ? 667
kW 1965 PANAUTI P ? 2.400 kW 1967 PHEWA P ?
1.088 kW 1967 THRISHULI P ? 24.000
kW 1970 Installed capacity ? 30
MW 1989 Installed capacity ? 250
MW 1999 Installed capacity ? 400
MW 2004 Installed capacity ? 533 MW
3(No Transcript)
4(No Transcript)
5(No Transcript)
6Nepals Hydropowerper 1. January 2004
- Installed power capacity ca. 533 MW
- Annual energy production ca. 1,5 TWh
Nepals main rivers and basins
7Theoretical Power PotentialSource Nepal
Electricity Authority
8Hydropower Potential in Nepal Source Nepal
Electricity Authority
- Theoretically Possible 83.290 MW
- Technically Feasible 44.600 MW
- Economically Feasible 42.133 MW
9Large Hydro Power Stations
Power gt 10 MW
Modi Khola
Chilime
Bhote Khosi
Trisuli
Jhimruk
Marsyangdi
Kali Gandaki
Devighat
Khulekhani II
Gandak
Khulekhani I
Khimti
10Small Hydro Power Stations
1 MW lt Power lt 10 MW
Seti
Tatopani
Phewa
Indrawati
Andhi Khola
Sun Koshi
Tinau
Panauti
Chatara
Puwa
11Major Hydro Power Stations
12Hydro Power Stations under construction
M. Marsyangdi
13Planned Hydro Power Stations
Power gt 10 MW
Chamelia
Pancheshwor
W. Seti
Budhi Ganga
U. Karnali
U.Marsyangdi
Langtang Storage
Langtang
Chisapani
U.Modi
Up. Tamakoshi
Madi-Ishaneswor
Up. Seti
Budhi Gandaki
U. Arun
Khimti II
Andhi Khola
Thulo Dhunga
Arun 3
Likhu
L.Arun
Kali Gandaki II
Kabeli A
Tamor-Mewa
Khulekhani III
Dudh Koshi
Kankai
14Hydro Power StationsPlanned and under
construction, P gt 10 MW
15Planned Hydro Power Stations
1 MW gt Power gt 10 MW
Rahughat
L. Indrawati
Daram Khola
Piluwa Khola
16Hydro Power StationsPlanned and under
construction, 1 MW gtP gt 10 MW