Title: ARTIC Phase 1
1ARTIC Phase 1 Transportation Center Project
Vision and Goals June 9, 2009
2Agenda
- Agenda
- Introductions
- Project Overview
- Project Vision
- Word Descriptions
- Vision Questions
- Next Steps
3CONCEPTUAL DESIGN
A Soaring Open Space
World Class Transportation Hub Functional,
Adaptable, Flexible An Iconic Design Skyline
Presence and Visibility Vibrant Urban Center
Pedestrian, Sustainable, Civic, Public
4An American Train Station for the 21ST
Century, Visionary, Timeless
Arrival, Entrance, Destination, Gateway, Passage
5A Vision of Open Space, Light, Volume, Velocity,
Movement
6Concept Model 1 Phase 1
6
2
SR-57
1
7
3
Douglass
Katella
7
Santa Ana River
5
4
1. INTERMODAL CENTER 2. STADIUM PAVILION ENTRY 3.
GRAND PLAZA 4. SANTA ANA RIVER PARK 5. TREE GROVE
PARKING 6. ANAHEIM STADIUM 7. EXISTING BUILDING
(separate land owner)
7Concept Model 1 Phase 3 (Build-Out)
8
2
SR-57
SR-57
7
1
Douglass
6
3
4
Katella
5
Santa Ana River
1. INTERMODAL CENTER 2. STADIUM PAVILION ENTRY 3.
GRAND PLAZA 4. GRAND PROMENADE RETAIL/RESIDENTIAL
5. SANTA ANA RIVER PARK 6. COMMERCIAL OFFICE /
RETAIL / PARKING 7. MIXED USE DEVELOPMENT 8.
ANAHEIM STADIUM
8Cross-Section through Terminal Building and Plaza
PASSENGERS
DROP-OFF
PLAZA
TRAIN PLATFORMS
BUS PLATFORMS / TAXI
9Pedestrian Oriented Environment
ANAHEIM STADIUM
Katella Ave.
Douglass Rd.
- Safe, Pedestrian-
- Friendly Streetscape
- Wide sidewalks
- Signalized Pedestrian Cross-Walks
- Street trees, landscape, paving
- Street lighting
- CCTV Camera Monitoring
- Bicycle access in Riverfront Park
HONDA CENTER
RIVERFRONT PARK
Santa Ana River
10Vehicular Circulation
N
Katella Ave.
ANAHEIM STADIUM
ANAHEIM STADIUM
Stadium Loop Road
DROP-OFF PICK-UP AREA KATELLA BUS STOP
Douglass Rd.
HIGH SPEED RAIL
METROLINK / AMTRAK
HONDA CENTER
MAGLEV TRAIN
Santa Ana River
11Option 2 Phase 1 Initial Transportation
Facility Level M1 (145)
Option 2 Future Phases Level M1 (145)
12Vision and Goals
- Vision
- ARTIC will be a world class transportation
center where people transfer between travel
services to reach Southern California activity
centers and business districts. This facility
will be an airport without runways, featuring
remote baggage and check-in for passengers
traveling to state, national and international
destinations. - Goals
- A dynamic place
- A strong sense of identity
- A modern yet timeless transportation center
- Shared transportation operations and support
facilities - Easy traveler transfers
- Links to area attractions and destinations
- Safe and comfortable environment
13Local Context
14Transit Center Precedence - Built
15Transit Center Precedence - Design
16Vision
17Conceptual Design Principles
Functional Flexibility -Day-to-Day
Operations -Adapt to Future
Development Character -Image and Identity
-Iconic and Timeless Ownership -Belonging
(Resident Population) -Safety and
Security Authenticity -Inspiration from
Orange County History / Culture -Public Art
Program
Accommodations -Inviting Public Spaces
-Comfort and Convenience Nature -Sites
Setting -Sun and Shade Balanced
Integrated Uses -Mix of Uses
-Connectivity Throughout Sustainable Design
-LEED Certified Development -Foster
Innovation
18Conceptual Design Imagery - Architecture
19Conceptual Design Imagery Public Realm
20Conceptual Design Imagery Urban Design Features
21Conceptual Design Imagery - Sustainability
22Word Definition
23Word Definition
24Word Definition
- LEED Platinum/Sustainable
25Word Definition
26Word Definition
27Word Definition
28Challenges
29Word Definition
30Discussion Questions
- What means success for you on this project?
31Discussion Questions
- What does the future look like on this site?
32Project Team
- Project Team
- PB
- HOK
- Arellano Associates
- Arlington Group
- Buro Happold
- Communication Arts
- Diaz Yourman
- Faith Group, LLC
- Faithful and Gould
- Horton Lees Brogdon
- International Parking Design
- Intueor Consulting
- Merry Norris Contemporary Art
- Newson Brown Acoustics
- Rolf Jensen Associates
- Thomas Consultants
- Selbert Perkins
- SWA Group
- Thornton Tomasetti
- Vertical Transportation Excellence
33Schedule
- Project Schedule
- Data Collection 8 weeks
- Master Plan 16 weeks
- Concept Design 12 weeks
- Schematic Design (15) 12 weeks
- Design Development (30) 15 weeks
- Construction Documents
- 60 12 weeks
- 90 16 weeks
- 100 12 weeks October 2010
- Bidding and Award 12 weeks
- Construction Services 26 months Spring 2013
34(No Transcript)