1

HPTF CRYOGENICS
2
HPTF CRYOGENICS
  • Design scope
  • Heat load and capacity requirements
  • Cryogenics at Meson Detector Building (MDB)
  • Cryogenics at New Muon Lab (NML)
  • Schedule
  • Conclusions

3
DESIGN SCOPE
  • Source of refrigeration
  • Distribution system
  • Cryogenics controls

4
HEAT LOAD CAPACITY
5
DESIGN SOLUTIONS
6
CRYOGENICS AT MDB
  • Meson Cryogenic Test Facility (CTF) cryogenic
    plant ?
  • Meson tunnel transfer line ?
  • Vacuum pump ?
  • Helium recovery and purification system ?

7
CRYOGENICS AT NML
  • Temporary Cryogenic System
  • Option 1 - Dewar Based System ?
  • Option 2 - TeV Satellite ?
  • New Cryogenic System
  • Option 1 - Modified SSC plant
  • Option 2 - New Hybrid Type Plant

8
SCHEDULE
  • MDB
  • Cap Cav II 4K Operation - October '05
  • Cap Cav II 2K Operation - December '05
  • 8 cavity 1.3 GHz ILC CM - Spring '07
  • PD Test Area - Fall '07
  • NML
  • Decision on Phase I option - June '05
  • Decision on Phase II option - August '05

9
CONCLUSIONS
  • Phased approach is taken to construct HPTF
    cryogenic systems
  • Test area cryogenic distribution systems are user
    specific
  • New cryogenic plant is the critical path

10
(No Transcript)
11
DEWARS BASED SYSTEM
12
TeV SATELLITE
13
CTF
14
CTF UPGRADE
  • Refurbish gas storage
  • Move oil removal vessels outside CTF
  • Add PS-1 Mycom compressor and its controls
  • Upgrade refrigerator controls
  • Modify compressor piping
  • Install tunnel side bayonet can w/ LN2 subcooler

15
TUNNEL TRANSFER LINE
16
TUNNEL TRANSFER LINE
  • Isolate unused header and transfer line (TL)
    branches
  • Fix existing expansion box _at_ 1000' West
  • Transition to Pbar/Muon style TL
  • Reuse muon expansion box
  • Install 350' TL and headers
  • Refurbish existing instrumentation
  • New bayonet can with He and N2 subcoolers

17
TUNNEL TRANSFER LINE
18
TUNNEL TRANSFER LINE
19
VACUUM PUMP
  • Manufactured by Tuthill Kinney
  • Roots Blower - Model KMBD 10000
  • Liquid Ring - Model KLRC 2100
  • Skid was assembled by JLab
  • Capacity is 10 g/sec at 12 torr
  • Being modified at PAB for He service

20
HELIUM RECOVERY
  • PS-1 compressor is used to recover helium from
    the MDB
  • Full flow inline purifier
  • Connections to mobile purifier