Title: Middle Fork Project Project Description


1
Middle Fork Project Project Description
  • April 25, 2006

2
Middle Fork American River Hydroelectric Project
  • Provide a Project Overview
  • Describe Major Project Features
  • Describe Supporting Infrastructure
  • Discuss Operating Constraints
  • Describe General Operations and Maintenance
  • Summary of Recreation Facilities
  • Questions

3
MFP - Overview
  • Developed as a Water Supply and Generation
    Project
  • Initial Operation 1967
  • 224 MW Nameplate Generating Capacity
  • 120,000 Acre-Feet Water Supply
  • Operated by Placer County Water Agency
  • PG E Acquires Power Output

4
Major Project Features
  • Two Large Dams and Storage Reservoirs
  • Two Medium Dams and Reservoirs
  • Three Small Dams and Diversion Pools
  • Five Powerhouses
  • Five Tunnels

5
Supporting Infrastructure
  • Electrical Switchyards and Substation
  • Access Roads and Trails
  • Communication and Power Lines
  • Stream Gages
  • Maintenance and Dormitory Facilities

6
Duncan Creek Diversion
  • Spillway Crest - 5,265 ft Elevation
  • Diversion - Concrete Gravity - 165 ft Long
  • Diversion Capacity - 400 cfs
  • Surface Area - Approximately 1 Acre
  • Gross Storage - 20 Acre-Feet

7
Duncan Creek - Middle Fork Tunnel
  • 1.5 Miles Long
  • 10 ft Horseshoe Cross-Section
  • Capacity 400 cfs
  • Intake With Trash Rack

8
French Meadows Damand Reservoir
9
French Meadows Damand Reservoir
  • Spillway Crest at 5,273 ft Elevation
  • French Meadows Dam - Gravel and Earthfill -
    2,700 ft Long
  • Surface Area - 1,404 Acres Maximum,434 Minimum
  • Gross Storage - 134, 993 Acre-Feet
  • Shoreline - 9 Miles

10
French Meadows - Hell Hole Tunnel
  • 2.6 miles long
  • 12.3 ft Horseshoe Cross-Section
  • Capacity 400 cfs
  • Intake in French Meadows Reservoir and Trash Rack
  • Terminates in a 6.25 ft Diameter - 691 ft Long
    Penstock to the French Meadows Powerhouse

11
French Meadows Powerhouse
12
French Meadows Powerhouse
  • Located on Hell Hole Reservoir
  • Water Supply - Discharge from French Meadows -
    Hell Hole Tunnel
  • Single Francis Turbine
  • 15.3 MW / 60,000 Volts
  • Discharges to Hell Hole Reservoir

13
Hell Hole Dam and Reservoir
14
Hell Hole Dam and Reservoir
  • Spillway Crest at 4,650 ft Elevation
  • Hell Hole Dam - Rockfill - 1,570 ft Long
  • Surface Area - 1,253 Acres Maximum, 185 Acres
    Minimum
  • Gross Storage - 207,500 Acre-Feet
  • Shoreline - 11 Miles

15
Hell Hole Powerhouse
16
Hell Hole Powerhouse
  • Located at Outlet from Hell Hole Dam
  • Water Supply - Hell Hole Dam Discharge Conduit
  • Single Francis Turbine
  • 0.725 MW / 12,000 Volts
  • Discharges to Rubicon River

17
Hell Hole - Middle Fork Tunnel
  • 10.4 Miles Long
  • 13.5 ft Horseshoe Cross-Section
  • Capacity 920 cfs
  • Intake in Hell Hole Reservoir
  • Terminates in a 9 - 7.5 ft dia. - 3,653 ft Long
    Penstock to the Middle Fork Powerhouse

18
North Fork Long Canyon Creek Diversion
19
North Fork Long Canyon Creek Diversion
  • Dam Crest at 4,720 ft Elevation
  • Diversion - Concrete Gravity - 120 ft Long
  • Diversion Capacity 100 cfs
  • Surface Area - Less than 1 Acre
  • Pipe and Shaft to the Hell Hole - Middle Fork
    Tunnel

20
South Fork Long Canyon Creek Diversion
21
South Fork Long Canyon Creek Diversion
  • Dam Crest at 4,650 ft Elevation
  • Diversion - Concrete Gravity - 145 ft Long
  • Diversion Capacity 200 cfs
  • Surface Area - Less than 1 Acre
  • Pipe and Shaft to the Hell Hole - Middle Fork
    Tunnel

22
Middle Fork Powerhouse
23
Middle Fork Powerhouse
  • Located on Middle Fork Interbay Reservoir
  • Water Supply- Hell Hole - Middle Fork Tunnel
  • Two Pelton Waterwheels
  • 122.4 MW / 60,000 Volts
  • Discharges to Middle Fork Interbay Reservoir

24
Middle Fork Interbay Damand Reservoir
25
Middle Fork Interbay Damand Reservoir
  • Dam Crest at 2,536 ft Elevation
  • Interbay Dam - Concrete Gravity - 233 ft Long
  • Surface Area - 7 Acres
  • Gross Storage - 175 Acre-Feet

26
Middle Fork TunnelRalston Tunnel
  • 6.7 Miles Long
  • 13.5 Horseshoe Cross-Section
  • Capacity 924 cfs
  • Intake in Middle Fork Interbay Reservoir / Trash
    Rack
  • Terminates in a 9.5 - 8 ft dia. - 1,670 ft Long
    Penstock to the Ralston Powerhouse

27
Ralston Powerhouse
28
Ralston Powerhouse
  • Located on Ralston Afterbay Reservoir
  • Water Supply - Middle Fork Tunnel - Ralston
    Tunnel
  • Single Francis Turbine
  • 79.2 MW / 60,000 Volts
  • Discharges to Ralston Afterbay

29
Ralston Afterbay and Afterbay Dam
30
Ralston Afterbay and Afterbay Dam
  • Dam Crest at 1,189 ft Elevation
  • Ralston Afterbay Dam - Concrete Gravity - 560 ft
    Long
  • Gross Storage - 2,782 Acre-Feet

31
Ralston - Oxbow Tunnel
  • 0.1 Miles Long
  • 13.25 ft Horseshoe Cross-Section
  • Capacity 1,075 cfs
  • Intake in Ralston Afterbay Reservoir / Trash Rack
  • Supplies Oxbow Powerhouse

32
Oxbow Powerhouse
33
Oxbow Powerhouse
  • Located on Middle Fork American River
  • Single Francis Turbine
  • Generator - 6.1 MW / 60,000 Volts
  • Discharges to Middle Fork American River below
    Ralston Afterbay Dam

34
Other Project Components
  • Project Power and Communication Lines
  • Stream Gaging Stations
  • Project Roads and Trails
  • Microwave Reflector Stations and Radio Towers
  • Support Facilities

35
Project Operations
  • Operating Constraints
  • Water Rights (Storage and Diversion Allowances)
  • Minimum Pool Requirements
  • Stream Maintenance Flows (i.e. Minimum Instream
    Flows)
  • Dam / Diversion Discharge Capacities

36
Minimum Pool Requirements
37
Minimum Instream Flow Requirements
38
Minimum Instream Flow Requirements
39
Minimum Instream Flow Requirements
40
Dam and Diversion Discharges
41
Dam and Diversion Discharges
42
Dam and Diversion Discharges
43
MFP Operations
  • Operated to Meet Water Supply Requirements
  • Operated to Meet Minimum Instream Flow
    Requirements
  • Operated to Optimize Value of Generation

44
Operations Overview
  • Operations Governed By
  • MF Project FERC License Conditions
  • Water Rights Permits
  • Contractual Obligations (Delivery of Water and
    Power)
  • Physical Constraints (Size of Tunnels, Capacity
    of Powerhouses)
  • Power Market High Value Periods of Operation

45
Seasonal Pattern of Operations
  • Reservoir Storage
  • French Meadows and Hell Hole Reservoirs, 343,000
    Acre-Feet Total Storage
  • Seasonal Pattern of Operations
  • Store Water During Winter and Spring
    Precipitation and Runoff Periods (Refill Period)
  • Releases During the Dry Summer and Fall Months
    (Drawdown Period)
  • Reservoirs are Operated to Maintain Relative
    Balance between Reservoirs
  • Dec. 31 Carry-Over Target for Dec. 31 of 150,000
    Acre-Feet (Two Reservoirs)

46
Reservoir Operations
  • Operations during refill period to meet demands,
    fill reservoirs, avoid spill
  • Operations during drawdown to meet demands, hit
    end-of-year storage target
  • Reservoir storage targets through the year
  • Generally based on historic practice
  • Refined during refill period based primarily on
    hydrologic conditions, with some consideration of
    power market conditions
  • Storage managed during drawdown period based on
    consumptive obligations and power market trends
  • At all times meet minimum release obligations

47
Generation Scheduling
  • Watershed provides sufficient water to operate
    about half of the time at full load (50
    capacity factor)
  • Full-load operations are most efficient for
    generation
  • Project typically operates in peaking mode
    8-16 hours per day, during the most valuable time
    periods
  • Annual generation approximately 1 million MW
    hours.

48
Scheduling and Operations
  • Project operations have been much the same since
    the construction of the Project
  • Variation in specific operations practices
    through time in response to
  • Project maintenance requirements
  • Changes in California power markets
  • Recreation demands downstream of the Project

49
Maintenance
  • Facility Testing (powerhouse equipment testing
    and maintenance, gate and valve testing)
  • Debris Removal Management
  • Sediment Management
  • Vegetation and Pest Management
  • Facility Painting
  • Road Maintenance

50
Recreation Facilities
  • Recreation Plan developed as required by the
    license
  • Recreation Facilities include campgrounds, picnic
    areas, boat launch areas, and one scenic vista
  • Operated by the Tahoe and Eldorado National
    Forests

51
Recreation Sites
  • French Meadows Reservoir
  • Reservoir North Shore - picnicking, camping, boat
    ramp and parking (McGuire, Poppy)
  • Reservoir East end - single-unit and group
    campgrounds (Lewis, Coyote Group, gates Group and
    Ahart)
  • Reservoir South Shore - picnicking, camping, boat
    ramp and parking (French Meadows Complex)

52
Recreation Sites
  • Hell Hole Reservoir
  • Hell Hole Reservoir - scenic vista, picnicking,
    camping, boat ramp and parking
  • Big Meadows Campground
  • Upper Hell Hole (boat-in/hike-in campground)
  • Ralston / Oxbow
  • Ralston Picnic Area
  • South Fork Long Canyon
  • One single-unit and one group campground (Big
    Meadows and Middle Meadows Group)