RNO UKERNA SuperJANET5 Planning Meeting General Update - PowerPoint PPT Presentation

1 / 10
About This Presentation
Title:

RNO UKERNA SuperJANET5 Planning Meeting General Update

Description:

Fibre infrastructure (Verizon) Transmission infrastructure (Verizon) SuperJANET5 General Update ... 5 2 year contract signed with Verizon in mid December ... – PowerPoint PPT presentation

Number of Views:26
Avg rating:3.0/5.0
Slides: 11
Provided by: Roland7
Category:

less

Transcript and Presenter's Notes

Title: RNO UKERNA SuperJANET5 Planning Meeting General Update


1
RNO / UKERNA SuperJANET5 Planning
MeetingGeneral Update
2
Agenda
3
Transmission Infrastructure
  • 52 year contract signed with Verizon in mid
    December
  • Rollout project team and structures established
  • Key delivery dates
  • Core infrastructure by end April 2006
  • Infrastructure to all RNs by end June 2006
  • UKERNA / RNOs transition to SJ5 July to November
    2006
  • SuperJANET4 ceases
  • RNEP site surveys to take place in Feb / March
  • RNEP preparation information issued earlier this
    week

4
Dublin connection
  • An option to provide a breakout in Dublin is
    available
  • Discussions with HeaNET to
  • Replace the existing connection to JANET with a
    SuperJANET5 connection over the collector arc to
    the Warrington and Glasgow PoPs
  • Other bandwidth channels possible for research
    collaborations

5
Dublin connection
Glasgow
To NIRAN RNEP 1
To NIRAN RNEP 2
1GE wavelengths
Dublin to HeaNET PoP
Warrington
6
IP Router procurement update
  • Lucent Technologies selected as the supplier of
    Juniper T-640 series routers
  • A hardware supply framework agreement for the
    T-Series only is being established
  • Publicly funded bodies connected to JANET can use
    this
  • 51 OFF list price
  • Routers RFS from 31st May 2006

7
JANET IP
  • Implementation of the JANET IP service test
    regime (of dual links) explained at the Nov 05
    meeting
  • Overview document will be produced and issued
  • Cisco 6509 router interfaces purchasing on behalf
    of RNOs (for those that asked) underway
  • UKERNA IP equipment will be kept at some RNEPs to
    support schools and ACL connections

8
Bandwidth Channels (UKLight)
  • UKLight infrastructure will be migrated to
    SuperJANET5
  • For RNOs connected to UKLight the connection to
    SuperJANET5 will be via the 10Gbit/s bandwidth
    channel wavelength
  • For those RNOs that dont have a UKLight
    connection UKERNA will work with them to
    determine how best to make use of the 10Gbit/s
    bandwidth channel wavelength

9
Practical Optical Networking Event
  • 16th March 2006, RUSI London

10
Questions?