RNO UKERNA SuperJANET5 Planning Meeting June 2006 General Update - PowerPoint PPT Presentation

1 / 7
About This Presentation
Title:

RNO UKERNA SuperJANET5 Planning Meeting June 2006 General Update

Description:

IP transition a technical refresher. Close & refreshments 15:00 ... WREN. SWERN. Kentish MAN. EMMAN. Bristol. Glasgow. Reading. Warrington. Leeds. London. T-House ... – PowerPoint PPT presentation

Number of Views:37
Avg rating:3.0/5.0
Slides: 8
Provided by: Roland7
Category:

less

Transcript and Presenter's Notes

Title: RNO UKERNA SuperJANET5 Planning Meeting June 2006 General Update


1
RNO / UKERNA SuperJANET5 Planning MeetingJune
2006General Update
2
Agenda
3
SuperJANET5 Infrastructure
  • Core infrastructure accepted
  • All core IP routers installed
  • Infrastructure to all RNs delayed into July
  • UKERNA / RNOs transition to SJ5 July to November
    2006 (avoiding clearing where possible)
  • SuperJANET4 ceases end December 2006

4
Dublin connection
  • A breakout in Dublin has been put into place
  • Agreement with HeaNET made to
  • Replace the existing connection to JANET with 1GE
    SuperJANET5 connections over the collector arc to
    the Warrington C-PoP and to the Glasgow C-PoP
  • Other bandwidth channels possible for research
    collaborations
  • Discussions with DANTE to provide a 10G
    wavelength from London to Dublin over SJ5 for a
    HeaNET backup connection to GEANT2

5
Dublin connection
Glasgow
To NIRAN RNEP 1
To NIRAN RNEP 2
1GE wavelengths
Warrington
Dublin to HeaNET PoP
10G wavelength
Reading
London
6
Questions?
7
SuperJANET5
Write a Comment
User Comments (0)
About PowerShow.com