Title: Fundamentals of Operations Management BUS 3 140 Aggregate Planning
1Fundamentals ofOperations ManagementBUS 3
140Aggregate Planning Master SchedulingOct
9, 2007
2Capacity Planning Review
3Definitions
- Design capacity
- Maximum output rate or service capacity for
which an operation, process, or facility is
designed - Effective capacity
- Design capacity minus allowances such as
personal time, maintenance, and scrap - Actual output
- Rate of output actually achieved--cannot exceed
effective capacity.
From Stevenson, Operations Management, Ninth
Edition, McGraw Hill Irwin
4Measures of Capacity (Table 5.1)
From Stevenson, Operations Management, Ninth
Edition, McGraw Hill Irwin
5Constraints
Anything that LIMITS a system in reaching its Goal
- Types of Constraints
- Resource
- Material
- Supplier/Vendor
- Financial
- Knowledge/Competence
- Policy
6Fixed and variable Costs
- Fixed Costs
- Remain CONSTANT regards of level of Volume
- Rent
- Manager salaries
- Insurance
- Overhead
- Variable Costs
- Vary directly with Volume of Output
- Total Material Cost
- Total
Beware of ABSORBING OVERHEAD (amortizing Fixed
Costs) as a justification for producing more than
can be Sold
7Potential Bottleneck Operations (2 Examples)
Bottleneck
Operation 120/hr.
Operation 210/hr.
Operation 315/hr.
10/hr.
Maximum output ratelimited by bottleneck
40 Units coming in every hour, but only 30 going
out
Machine 1
10/hr
Machine 2
Bottleneck Operation
10/hr
30/hr
Machine 3
10/hr
Machine 4
10/hr
8Bottleneck
True Definition
A Constraint that causes REVENUE to be Lost
IMBALANCE
IMBALANCE
IMBALANCE
Operation 120/hr.
Operation 210/hr.
Operation 315/hr.
10/hr.
Unless more than 10 units per hour can be
SOLD, the Operations are Imbalanced but not a
true bottleneck
9Breakeven Exercise
Page 194 of Book
10Aggregate Planning
11Intermediate Planning (Table 13.1)
Intermediate Plans
Short-Range Plans
Long-Range Plans
- General levels of
- Employment
- Output
- Finished Goods Inventory
- Subcontracting
- Backorders
- Long-term capacity
- Location
- Layout
- Product Design
- Work System design
- Detailed Plans
- Machine loading
- Job assignments
- Job sequencing
- Production Orders
- Work schedules
From Stevenson, Operations Management, Ninth
Edition, McGraw Hill Irwin
12Intermediate Planning (Figure 13.1)
From Stevenson, Operations Management, Ninth
Edition, McGraw Hill Irwin
13Aggregate Planning
- Focus on Quantity and Timing of expected Demand
(forecast) - Start with Multiple plans and choose the most
appropriate one - Factor in Revenue, Market Share, and Inventory
targets - Estimate the impact of Product Transitions
14Aggregate Planning Inputs and Outputs (Table 13.2)
From Stevenson, Operations Management, Ninth
Edition, McGraw Hill Irwin
15Demand Options
- When Demand does not match Capacity then alter
(i.e. Influence) demand - Pricing
- Promotion
- New demand to smooth peaks and valleys (e.g. Bus
taking kids on field trips during the school day)
- Points out a useful application of the economic
concept of Elasticity of Demand
16Capacity Options
- Hire workers and / or layoff workers
- Attraction and Retention risk
- Skill set replacement
- Union issues
- Hiring and layoff costs
- Part time workers and contractors
- Work schedule adjustments
- Overtime
- Second (and third) shifts
- Sending workers home
- Four day weeks
- Inventories
- Subcontracting, offloading, outsourcing
17Managing Uneven Load
- Level Load
- Chase
- Develop Business Rules
- No more than x of forecasted demand
- Never short an order
- No more than 110 of capacity
- No more than 50 in last month of Quarter
- Other
18Managing Uneven Load (Table 13.3)
CHASE Approach
Capacities are adjusted to match demand
requirements over the planning horizon
LEVEL Approach
Capacities are kept constant over the planning
horizon
From Stevenson, Operations Management, Ninth
Edition, McGraw Hill Irwin
19Techniques for Aggregate Planning
- Know your Demand
- Know your CAPACITIES (including Flex up or down)
- Account for company policies on Layoffs, costs,
overtime, etc.. - Agree on The Plan
- Draw the Capacity Line and the Load bars against
it
20Summary of Techniques for Aggregate Planning
(Table 13.7)
True Optimization is rare, but the analysis is
useful to drive Business Rules and formal
decision criteria
From Stevenson, Operations Management, Ninth
Edition, McGraw Hill Irwin
21Aggregate Planning in Services
- Cannot stock Finished Goods Inventory
- Demand is Perishable
- Input is highly variable
- Cross train people to increase effective capacity
- Yield Management (Airlines)
22Master Scheduling
23The Master Schedule disaggregates the
Aggregate Plan
Figure 13.4
Figure 13.5
Aggregate Planning
Aggregate Plan
Jan
Feb
Mar
Lawn Mowers
200
300
400
Disaggregation
Master Schedule
Jan
Feb
Mar
Push Mowers
100
100
100
Power Mowers
75
150
200
Riding Mowers
25
50
100
Total
200
300
400
Master Schedule
From Stevenson, Operations Management, Ninth
Edition, McGraw Hill Irwin
24The Master Scheduling Process (Figure 13.6)
Outputs
Inputs
- Beginning Inventory
- Forecast
- Orders
- Projected Inventory
- Master Production Schedule
- Uncommitted Inventory
PROCESS
From Stevenson, Operations Management, Ninth
Edition, McGraw Hill Irwin
25Additional Key Points in Master Scheduling
- Rough Cut Capacity Planning
- Time Horizons
- Time Fences
- Available to Promise
The most valuable part of the job is knowing
when to say, Yes and when to say, No
26Time Fences
frozen(firm orfixed)
liquid(open)
slushysomewhatfirm
Only Executive Exception would authorize a Change
Only Executive Exception would NOT authorize a
Change
Changes are likely to be accepted, but require
Research and / or Business Case
27Time Fences can be Dynamic
Typical Technology Manufacturer
Dell Computer
Cargo Airplanes for the US Dept. of Defense
Restaurant
Burger King
- Generally varies by Lead Time to obtain Materials
and Capital equipment - Goal is to minimize the Red and Yellow and keep
FLEXIBILITY and RESPONSIVENESS to a maximum
28Sales Operations PlanningA bridge between
Aggregate Planning Master Scheduling
29Sales Operations Planning (SOP)
Purpose
- Senior Management Alignment on Revenue and Supply
plans - Greater accountability of individual plans
- Consensus on managing gaps
Output
- Judged Revenue Plan
- Master Build Schedule
- Contingency plans
- Documented agreements and planned outcomes
30Key SOP Inputs, by Function
- Unconstrained Forecast
- Execution to Plan
- Capacity
- Materials Plan
- Time to Volume
- Buffer Targets
Sales
Operations
BUs
Finance
- Prelim. Revenue Plan
- GM Revenue objectives
- Profitability scenarios
- Prelim. Budgets
- Prelim. FGI Targets
- Return on Invested Capital
- Market Trends TAM
- Share expectations
- Customer TAM expectations
- Roadmaps and Transitions
31SOP Output is a Consensus Plan
- Constrained Revenue plan
- Accountability for Forecast Accuracy
- Standard, system-generated, accuracy metrics
- Defined ownership by Sales and Marketing
- Joint ownership of FGI between Sales and
Operations - MPS tied to single plan of record and business
rules - Published Lead Times
- Integrated Revenue plan
- Credible EPS guidance
- Exception Loops between meetings
32Introduction to Inventory Management
33Reasons for Carrying Inventory
- Revenue
- Have what Customers want, when they want it
- Compensate for non-linear demand that doesnt
match your capacity - Buffer for upside demand
- Buffer for when competitors cannot deliver
- Buffer against unexpected internal supply
problems
Carrying Buffer inventory is necessary, but
continuous, relentless efforts to minimize
variability, and thus eliminate the need for the
Buffers is greatly preferred
34Reasons for Carrying Inventory
- Cost
- Minimize shortages, to avoid delays and idle time
- Optimize plant, people, and equipment utilization
- Obtain volume discounts for favorable unit
pricing - Hedge against future price increases
Optimizing utilization and unit pricing are
valuable only when the goods made or purchased
will SOLD to a paying Customer in a reasonable
time
The cost of a STOCKOUT is hard to quantify, but
is to be AVOIDED at all times
35Types of Inventory
Raw Materials
Work In Process (WIP)
Finished Goods (FGI)
Maintenance, Repair, Operating Supplies (MRO)
Resale Items
Manufacturing
All
Chocolate Cake
Finished Goods
Cake
Icing
Subassembly (WIP)
Raw Material
Water
Egg
Mix
MRO
Raw