Fundamentals of Operations Management BUS 3 140 Aggregate Planning - PowerPoint PPT Presentation

1 / 35
About This Presentation
Title:

Fundamentals of Operations Management BUS 3 140 Aggregate Planning

Description:

Points out a useful application of the economic concept of Elasticity of Demand. Page 16 ... Burger King. Typical Technology Manufacturer. Dell Computer ... – PowerPoint PPT presentation

Number of Views:104
Avg rating:3.0/5.0
Slides: 36
Provided by: SEAG2
Category:

less

Transcript and Presenter's Notes

Title: Fundamentals of Operations Management BUS 3 140 Aggregate Planning


1
Fundamentals ofOperations ManagementBUS 3
140Aggregate Planning Master SchedulingOct
9, 2007
2
Capacity Planning Review
3
Definitions
  • Design capacity
  • Maximum output rate or service capacity for
    which an operation, process, or facility is
    designed
  • Effective capacity
  • Design capacity minus allowances such as
    personal time, maintenance, and scrap
  • Actual output
  • Rate of output actually achieved--cannot exceed
    effective capacity.

From Stevenson, Operations Management, Ninth
Edition, McGraw Hill Irwin
4
Measures of Capacity (Table 5.1)
From Stevenson, Operations Management, Ninth
Edition, McGraw Hill Irwin
5
Constraints
Anything that LIMITS a system in reaching its Goal
  • Types of Constraints
  • Resource
  • Material
  • Supplier/Vendor
  • Financial
  • Knowledge/Competence
  • Policy

6
Fixed and variable Costs
  • Fixed Costs
  • Remain CONSTANT regards of level of Volume
  • Rent
  • Manager salaries
  • Insurance
  • Overhead
  • Variable Costs
  • Vary directly with Volume of Output
  • Total Material Cost
  • Total

Beware of ABSORBING OVERHEAD (amortizing Fixed
Costs) as a justification for producing more than
can be Sold
7
Potential Bottleneck Operations (2 Examples)
Bottleneck
Operation 120/hr.
Operation 210/hr.
Operation 315/hr.
10/hr.
Maximum output ratelimited by bottleneck
40 Units coming in every hour, but only 30 going
out
Machine 1
10/hr
Machine 2
Bottleneck Operation
10/hr
30/hr
Machine 3
10/hr
Machine 4
10/hr
8
Bottleneck
True Definition
A Constraint that causes REVENUE to be Lost
IMBALANCE
IMBALANCE
IMBALANCE
Operation 120/hr.
Operation 210/hr.
Operation 315/hr.
10/hr.
Unless more than 10 units per hour can be
SOLD, the Operations are Imbalanced but not a
true bottleneck
9
Breakeven Exercise
Page 194 of Book
10
Aggregate Planning
11
Intermediate Planning (Table 13.1)
Intermediate Plans
Short-Range Plans
Long-Range Plans
  • General levels of
  • Employment
  • Output
  • Finished Goods Inventory
  • Subcontracting
  • Backorders
  • Long-term capacity
  • Location
  • Layout
  • Product Design
  • Work System design
  • Detailed Plans
  • Machine loading
  • Job assignments
  • Job sequencing
  • Production Orders
  • Work schedules

From Stevenson, Operations Management, Ninth
Edition, McGraw Hill Irwin
12
Intermediate Planning (Figure 13.1)
From Stevenson, Operations Management, Ninth
Edition, McGraw Hill Irwin
13
Aggregate Planning
  • Focus on Quantity and Timing of expected Demand
    (forecast)
  • Start with Multiple plans and choose the most
    appropriate one
  • Factor in Revenue, Market Share, and Inventory
    targets
  • Estimate the impact of Product Transitions

14
Aggregate Planning Inputs and Outputs (Table 13.2)
From Stevenson, Operations Management, Ninth
Edition, McGraw Hill Irwin
15
Demand Options
  • When Demand does not match Capacity then alter
    (i.e. Influence) demand
  • Pricing
  • Promotion
  • New demand to smooth peaks and valleys (e.g. Bus
    taking kids on field trips during the school day)
  • Points out a useful application of the economic
    concept of Elasticity of Demand

16
Capacity Options
  • Hire workers and / or layoff workers
  • Attraction and Retention risk
  • Skill set replacement
  • Union issues
  • Hiring and layoff costs
  • Part time workers and contractors
  • Work schedule adjustments
  • Overtime
  • Second (and third) shifts
  • Sending workers home
  • Four day weeks
  • Inventories
  • Subcontracting, offloading, outsourcing

17
Managing Uneven Load
  • Level Load
  • Chase
  • Develop Business Rules
  • No more than x of forecasted demand
  • Never short an order
  • No more than 110 of capacity
  • No more than 50 in last month of Quarter
  • Other

18
Managing Uneven Load (Table 13.3)
CHASE Approach
Capacities are adjusted to match demand
requirements over the planning horizon
LEVEL Approach
Capacities are kept constant over the planning
horizon
From Stevenson, Operations Management, Ninth
Edition, McGraw Hill Irwin
19
Techniques for Aggregate Planning
  • Know your Demand
  • Know your CAPACITIES (including Flex up or down)
  • Account for company policies on Layoffs, costs,
    overtime, etc..
  • Agree on The Plan
  • Draw the Capacity Line and the Load bars against
    it

20
Summary of Techniques for Aggregate Planning
(Table 13.7)
True Optimization is rare, but the analysis is
useful to drive Business Rules and formal
decision criteria
From Stevenson, Operations Management, Ninth
Edition, McGraw Hill Irwin
21
Aggregate Planning in Services
  • Cannot stock Finished Goods Inventory
  • Demand is Perishable
  • Input is highly variable
  • Cross train people to increase effective capacity
  • Yield Management (Airlines)

22
Master Scheduling
23
The Master Schedule disaggregates the
Aggregate Plan
Figure 13.4
Figure 13.5
Aggregate Planning
Aggregate Plan
Jan
Feb
Mar
Lawn Mowers
200
300
400
Disaggregation
Master Schedule
Jan
Feb
Mar
Push Mowers
100
100
100
Power Mowers
75
150
200
Riding Mowers
25
50
100
Total
200
300
400
Master Schedule
From Stevenson, Operations Management, Ninth
Edition, McGraw Hill Irwin
24
The Master Scheduling Process (Figure 13.6)
Outputs
Inputs
  • Beginning Inventory
  • Forecast
  • Orders
  • Projected Inventory
  • Master Production Schedule
  • Uncommitted Inventory

PROCESS
From Stevenson, Operations Management, Ninth
Edition, McGraw Hill Irwin
25
Additional Key Points in Master Scheduling
  • Rough Cut Capacity Planning
  • Time Horizons
  • Time Fences
  • Available to Promise

The most valuable part of the job is knowing
when to say, Yes and when to say, No
26
Time Fences
frozen(firm orfixed)
liquid(open)
slushysomewhatfirm
Only Executive Exception would authorize a Change
Only Executive Exception would NOT authorize a
Change
Changes are likely to be accepted, but require
Research and / or Business Case
27
Time Fences can be Dynamic
Typical Technology Manufacturer
Dell Computer
Cargo Airplanes for the US Dept. of Defense
Restaurant
Burger King
  • Generally varies by Lead Time to obtain Materials
    and Capital equipment
  • Goal is to minimize the Red and Yellow and keep
    FLEXIBILITY and RESPONSIVENESS to a maximum

28
Sales Operations PlanningA bridge between
Aggregate Planning Master Scheduling
29
Sales Operations Planning (SOP)
Purpose
  • Senior Management Alignment on Revenue and Supply
    plans
  • Greater accountability of individual plans
  • Consensus on managing gaps

Output
  • Judged Revenue Plan
  • Master Build Schedule
  • Contingency plans
  • Documented agreements and planned outcomes

30
Key SOP Inputs, by Function
  • Unconstrained Forecast
  • Execution to Plan
  • Capacity
  • Materials Plan
  • Time to Volume
  • Buffer Targets

Sales
Operations
BUs
Finance
  • Prelim. Revenue Plan
  • GM Revenue objectives
  • Profitability scenarios
  • Prelim. Budgets
  • Prelim. FGI Targets
  • Return on Invested Capital
  • Market Trends TAM
  • Share expectations
  • Customer TAM expectations
  • Roadmaps and Transitions

31
SOP Output is a Consensus Plan
  • Constrained Revenue plan
  • Accountability for Forecast Accuracy
  • Standard, system-generated, accuracy metrics
  • Defined ownership by Sales and Marketing
  • Joint ownership of FGI between Sales and
    Operations
  • MPS tied to single plan of record and business
    rules
  • Published Lead Times
  • Integrated Revenue plan
  • Credible EPS guidance
  • Exception Loops between meetings

32
Introduction to Inventory Management
33
Reasons for Carrying Inventory
  • Revenue
  • Have what Customers want, when they want it
  • Compensate for non-linear demand that doesnt
    match your capacity
  • Buffer for upside demand
  • Buffer for when competitors cannot deliver
  • Buffer against unexpected internal supply
    problems

Carrying Buffer inventory is necessary, but
continuous, relentless efforts to minimize
variability, and thus eliminate the need for the
Buffers is greatly preferred
34
Reasons for Carrying Inventory
  • Cost
  • Minimize shortages, to avoid delays and idle time
  • Optimize plant, people, and equipment utilization
  • Obtain volume discounts for favorable unit
    pricing
  • Hedge against future price increases

Optimizing utilization and unit pricing are
valuable only when the goods made or purchased
will SOLD to a paying Customer in a reasonable
time
The cost of a STOCKOUT is hard to quantify, but
is to be AVOIDED at all times
35
Types of Inventory
Raw Materials
Work In Process (WIP)
Finished Goods (FGI)
Maintenance, Repair, Operating Supplies (MRO)
Resale Items
Manufacturing
All
Chocolate Cake
Finished Goods
Cake
Icing
Subassembly (WIP)
Raw Material
Water
Egg
Mix
MRO
Raw