Transcript and Presenter's Notes

Title: Tommy E' Nantung


1
Bridge Decks and Rail Cracking Midwest Concrete
Consortium
  • Tommy E. Nantung
  • INDOT Research Division

St. Louis, MO April 18 20, 2006
2
The Challenges
3
The Challenges
4
The Challenges
5
The Challenges
6
The Challenges
7
The Challenges
8
The Challenges
9
The Challenges
  • Do not read the specs
  • Rely on somebody else to tell
  • Bad specifications
  • Lack of knowledge and expertise to keep up with
    the concrete technology
  • Lack of resources for inspection
  • Penalties are too light to penalize
  • Owners most of the time ended up fixing and
    paying the mistakes
  • Weather and fast track constructions

10
Attempts to Reduce Cracks
  • Materials and mixtures
  • Strength maximum and minimum
  • Water and cement contents (paste)
  • Aggregate gradation (max size) and content
  • Air content
  • Coarser cement particles
  • Slump low slump concrete
  • Admixtures shrinkage reducing, superplasticizer
  • Mineral admixtures fly ash, silica fume, GGBFS

11
Attempts to Reduce Cracks
  • Designs
  • Bridge
  • Cover thickness, both top (settlement cracking)
    and bottom (max size aggregate)
  • Modified stay-in-place deck form placement
  • Jointless bridge
  • Pre-cast elements
  • Shoring

12
Attempts to Reduce Cracks
  • Construction
  • Environment temperature, relative humidity, wind
    speed, solar radiation
  • Concrete pumping with less rich paste (bridge)
  • Order of concrete placement (bridge)
  • Monitoring concrete deck thickness (bridge)
  • Concrete compaction
  • Concrete finishing and tining/grooving
  • Concrete curing type and time

13
Balancing Acts
Cost, Constructability, and Knowledge
Material Properties and Methods
Location and Materials availability
14
Key Opportunities for Codes
  • All parameters that reduce cracks cannot all be
    incorporated in the spec
  • Supplemental specs
  • Special provisions
  • Construction memo
  • Design memo
  • Characteristics
  • Emphasize consistency of material properties,
    methods, etc. that ensure to decrease the
    tendency for cracking.
  • Example smaller standard deviation for pay
    adjustment
  • Move the responsibility more to the contractor
    side
  • End results spec, performance related specs, etc.

15
Key Opportunities for Research
  • One size does not fit all
  • Different state has different objectives
  • Monitoring equipment and methods
  • Performance of materials
  • Performance of contractor (workmanship)
  • Non-destructive evaluation
  • Performance-prediction and maintenance-cost
    models for life-cycle-cost to determine
    incentives and penalties
  • How do we measure quality?
  • How do you reward quality work?
  • Needs wholistic approach

16
Questions???