Church Building History - PowerPoint PPT Presentation

About This Presentation
Title:

Church Building History

Description:

Major & minor Remodel in 1994 and 2004: Sanctuary. Dinner Hall ... Kitchen. Maintenance Cost. Church Current Situation. Adult attendance: 100-130. Children: 40-45 ... – PowerPoint PPT presentation

Number of Views:31
Avg rating:3.0/5.0
Slides: 7
Provided by: palmbeac
Category:

less

Transcript and Presenter's Notes

Title: Church Building History


1
Church Building History
  • Built in 1974
  • CBS Construction
  • Total Footage 5,800
  • Major minor Remodel in 1994 and 2004
  • Sanctuary
  • Dinner Hall
  • 3 Classroom, 1 Classroom/Library, 1 Office, 1
    Nursery Room
  • Restroom 2 - Men, 2 - Women
  • Kitchen

2
Maintenance Cost
3
Church Current Situation
  • Adult attendance 100-130
  • Children 40-45
  • Youth 10-15
  • Church Members 110
  • Regular Members attendance 60-70
  • Each year baptized members 5-10
  • Sunday school and Worship
  • Adult - Elementary
  • Youth - Preschool
  • Middle

4
Church Member Projection
  • Per 1990 Census, Chinese 2,201 , 0.25 of County
    population
  • Per 2000 Census, Chinese 3,722, 0.33 of County
    population
  • Our adult congregation is around 110, about 4 of
    Chinese pop.
  • By 2025, Countys projected population
    1,798,700
  • Assuming the share growth .08 grows every ten
    years
  • By 2025, Chinese would comprise 0.53 of the
    Countys pop.
  • In 20 years, by 2025, Chinese population in Palm
    Beach County
  • 1,798,700 x .53 9,533

5
Church Member Projection
  • Assuming an optimistic 5-6 conversion rate,
    Christian in 20 years will be 477-572
  • (This means every year we add 24-29 members to
    the church.)
  • Assuming a realistic 3 conversion rate, Chinese
    Christian in 20 years will be 286
  • note This increasing share growth of Chinese Pop
    is very optimistic, even if we expect that the
    Scripps Institute, FAU, and in growthing
    industrial will bring in Chinese Scientist, skill
    tech, and students. Therefore, the 9,533 Pop
    figure is perhaps the ceiling in 20 years in the
    PBC.

6
Expansion of Existing Building
  • Sewer hook-up Gulfstream Plaza or wait for the
    neighbors to develop first
  • Drainage and storm water retention
  • Buffer wall in minimum 6 feet high
  • Restrooms expansion
  • A/C and electricity lines need to be realigned or
    capacity expanded
Write a Comment
User Comments (0)
About PowerShow.com