Simulation of Airplane Traffic at Bradley International Airport - PowerPoint PPT Presentation

1 / 10
About This Presentation
Title:

Simulation of Airplane Traffic at Bradley International Airport

Description:

Airline flight schedule data. Actual flight arrival/departure times ... No flight cancellations. One gate per airline - Capacity is number of actual gates at airport ... – PowerPoint PPT presentation

Number of Views:65
Avg rating:3.0/5.0
Slides: 11
Provided by: jenifer4
Category:

less

Transcript and Presenter's Notes

Title: Simulation of Airplane Traffic at Bradley International Airport


1
Simulation of Airplane Trafficat Bradley
International Airport
Jenifer Miller Simulation Modeling and
Analysis Term Project December 2000
2
Objective and Scope
  • Simulation model of airplane traffic at Bradley
    International Airport
  • Planes only, no customer or baggage impact
  • Current utilization and impact of increased
    schedule and airport remodel

3
Requirements
  • Airline flight schedule data
  • Actual flight arrival/departure times
  • Airport runway/gate capacities
  • FAA procedural information
  • Validation information - Taxi-in times

4
Assumptions
  • No flight cancellations
  • One gate per airline - Capacity is number of
    actual gates at airport
  • Taxi-in time not modeled - results used for model
    validation

5
ProModel Elements
  • Locations - 34
  • Entities - 11
  • Processing
  • Arrivals/Arrival Cycles
  • Attributes
  • User Distributions

6
Locations
7
Processing
8
User Distributions
  • Used for time at gate - 1 for each type of plane
  • overnight at gate
  • from remote
  • from arrival
  • Arrival schedules
  • separate for each airline based on arrivals for
    that airline
  • 1 used for all airlines based on arrivals for all
    planes

9
Results
10
Conclusions
  • Base model represents current airport operation
    reasonably well
  • Doubling traffic indicates runway is limiter for
    most airlines - 2 airlines have gate limitations
    as well
  • 25 increase for new gates does not significantly
    impact operation and does not require additional
    runway construction