Operational Review - PowerPoint PPT Presentation

1 / 24
About This Presentation
Title:

Operational Review

Description:

Usenet News. LINX. Use increasing now at the limit allowed for Gb ether connection. ... Birmingham's recently delivered. UHI sorting out housing it. ... – PowerPoint PPT presentation

Number of Views:86
Avg rating:3.0/5.0
Slides: 25
Provided by: timk68
Category:

less

Transcript and Presenter's Notes

Title: Operational Review


1
Operational Review
  • Tim KiddProduction Services DirectorUKERNA

2
Agenda
  • External Connectivity
  • External Access Resilience
  • Backbone
  • Status of FE College connections
  • NetSight
  • CERT Structure
  • Videoconferencing
  • Usenet News

3
LINX
  • Use increasing now at the limit allowed for Gb
    ether connection.
  • Second Gb ether connection soon.
  • Increased the bandwidth of the private peering.
  • Expect more private peering over the coming year.

4
GBytes
LINX Usage
5
Global Internet Connectivity
  • Traffic is increasing (!)
  • ESnet and Abiline peering from 155Mbps to
    622Mbps.
  • Instability in Sept/Oct on old 6155Mb Teleglobe
    links.
  • New global internet connectivity installed early
    in the new year.

6
Global Internet Connectivity
7
GBytes
International Usage
22.5Gb
From 4155M to 6155M
8
European Connectivity
  • Use has increased following move from TEN-155 to
    GEANT.
  • GEANT in service from 1 December.
  • Stopped running TEN-155 on 31 November 2001.
  • Thanks to ULCC staff for the smooth changeover.

9
GBytes
European Usage
GEANT
10
External Access Resilience
11
Total JANET Traffic
Tbytes per month
12
Backbone Traffic - June 2001
0.4
WarringtonC-PoP
LeedsC-PoP
8
6.3
8.8
LondonC-PoP
ReadingC-PoP
11.2
ULCC
13
Backbone Traffic - Feb 2002
0.4
? 2
WarringtonC-PoP
LeedsC-PoP
8
6.3
? 19
? 9.3
8.8
? 16
LondonC-PoP
ReadingC-PoP
11.2
? 17
ULCC
14
Backbone Resilience
  • Some problems on the backbone over the past year.
  • All off-net (contractors sub-contracted to
    WorldCom).
  • Implemented improvement plans with WorldCom to
    solve the issues.
  • An example

15
EastNet Access Link
  • Link lost for 15 hours in January.

144 fibres cut.
16
EastNet Access Link
Cambridge
Bury St Edmonds
Bedford
Copdock
Hemel Hempstead
Enfield
Chelmsford
London C-PoP
17
Reliability
  • Concerns about reliability
  • Telcos
  • People rather than technology.
  • Turbulence in the industry.
  • Take-overs and re-structuring.
  • External connectivity

18
FE College Connections
  • England 410 of 415 connected.
  • Scotland all 47 connected.
  • Wales all 24 connected.
  • Northern Ireland all 17 connected.

Thanks toregional networks and Regional Support
Centres for invaluable help.
19
NetSight
  • 17 (out of 22) in operation.
  • Birminghams recently delivered.
  • UHI sorting out housing it.
  • KentishMAN waiting for purchase of fast ethernet
    card for the BAR.
  • Oxford and Reading systems still to be sent out.

20
CERT Structure
21
Videoconferencing
  • Videoconferencing Management Centre to provide
  • ISDN
  • IP
  • Gateways
  • New contract for March 2003

22
Video Technology
  • Video Technology Advisory Service (VTAS)
    available via JANET Customer Service.
  • New documentation available soon
  • Audio engineering for videoconferencing
  • Introduction to videoconferencing
  • Advice on web www.video.ja.net

23
Usenet News
  • JANET News Reader Service started service
    September 2001.
  • JANET News Cache Pilot Service.
  • Need another volunteer institution to take part.
  • Contact News Service Manager via JANET Customer
    Service service_at_ukerna.ac.uk

24
The Year Ahead
  • Increase UK private peering.
  • Enhance the problem escalation system.
  • Increase contract management of our suppliers.
  • Enhance information to users for problems and
    maintenance.
Write a Comment
User Comments (0)
About PowerShow.com