WECC Reliability Center RFP Vendor Conference - PowerPoint PPT Presentation

1 / 14
About This Presentation
Title:

WECC Reliability Center RFP Vendor Conference

Description:

WECC's Goal is to Provide and Information or Clarifications You Require ... Footprints. Pacific Northwest. Security Corporation (PNSC) Rocky Mountain/ Desert Southwest ... – PowerPoint PPT presentation

Number of Views:19
Avg rating:3.0/5.0
Slides: 15
Provided by: stevenc150
Category:

less

Transcript and Presenter's Notes

Title: WECC Reliability Center RFP Vendor Conference


1
WECC Reliability CenterRFP Vendor Conference
  • March 5, 2007

2
Agenda
  • Introductions
  • Description of Conference Format
  • Reliability Center Strategy and RFP Process
    Overview
  • Vendor Questions and Answers
  • WECC Team Deliberation/Break
  • Address Unanswered Questions
  • Timeline Review Contact Information

3
Introductions
4
Conference Format
  • This Conference is All About the Potential
    Vendors
  • WECCs Goal is to Provide and Information or
    Clarifications You Require
  • Questions Are Limited to the In Person
    Participants
  • Telephone Participants are Limited to Monitoring
    the Conference

5
Conference Format
  • Questions and Answers Will Be Documented and
    Posted on the WECC Website
  • Some Questions May Require Additional
    Deliberation on the Part of the WECC.
  • Answers Will Be Provided After the Break or Be
    Posted on The WECC Website

6
Reliability Coordination Strategy Overview
7
Background
  • RC Operation Represents a Significant Part of the
    WECC Budget
  • Funded by WECC Membership
  • Effort Began in 2005 to Review Efficiency and
    Effectiveness of RC Operation
  • Led by WECC Board Task Force
  • Several Analyses Had Been Done in the Past

8
WECC Balancing Authority Footprints
9
Pacific Northwest Security Corporation (PNSC)
California/MexicoReliability Coordinator (CMRC)
Rocky Mountain/Desert SouthwestReliability
Coordinator (RDRC)
WECC Reliability Center Footprints
10
Board RC Principles
  • Comply with NERC and WECC Standards
  • Two Geographically Separated Sites
  • One RC Team at Each Site
  • Teams Utilize Common Tool Set
  • Westwide System Model

11
Board RC Principles
  • Each Team Should be Trained and Equipped to
    Operate as a Hot Backup for the Other Team
  • Teams Will Receive Common Training
  • Rotation of Team Members Between Sites
  • Dispatcher Training Simulator
  • RC Teams Must be Independent from Hosts
  • RC Information Isolated

12
Board RC Principles
  • Tools Include
  • Network Applications
  • Outage Scheduling
  • Interchange Scheduling Tool
  • DTS
  • Single IT (WSM) Host
  • Audio/Video Link Between Sites

13
RC RFP QA Structure
  • Contract Conditions
  • Questions Common to Both Type Hosts
  • Questions Specific to Hosting WSM Only
  • Questions Specific to Hosting RC Team Site Only

14
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com