Status of Tertiary Collimator Studies - PowerPoint PPT Presentation

About This Presentation
Title:

Status of Tertiary Collimator Studies

Description:

2. TERTIARY BEAM HALO LOSS. Primary 6 sigma. Secondary 7 sigma. Inner Triplets 8.5 sigma ... 2. Incoming beam: preliminary results for beam-gas are encouraging. ... – PowerPoint PPT presentation

Number of Views:17
Avg rating:3.0/5.0
Slides: 8
Provided by: niko79
Category:

less

Transcript and Presenter's Notes

Title: Status of Tertiary Collimator Studies


1
Status of Tertiary Collimator Studies
US LHC Accelerator Research Program
bnl - fnal- lbnl - slac
  • Nikolai Mokhov
  • (presented by Vladimir Shiltsev)

2
TERTIARY BEAM HALO LOSS
Primary 6 sigma Secondary 7
sigma Inner Triplets 8.5 sigma Arcs
30 sigma
3
MODELING WITH TWO COPPER TCTs
4
1.3.2.2 Tertiary Collimator Studies
  • L3 Leader Nikolai Mokhov (FNAL)
  • FY06 budget 30 k
  • Goals
  • Tertiary collimators in high-luminosity
    insertions are needed to protect of LBQuads and
    detectors. We will carry out full tracking
    with the STRUCT code - of secondary halo
    particles up to the limiting apertures in the IP1
    and IP5 insertions and farther to the CMS and
    ATLAS detector inner detectors followed by
    realistic energy deposition modeling with the
    MARS15 code with and without tertiary
    collimators.
  • Minimization of machine-related backgrounds and
    protection of the final focus and collider
    detector components at normal operation and
    accidental beam losses is to be added to the
    collimation system specifications. The ultimate
    goal is a successful design for high efficient
    robust tertiary collimators in all the LHC
    experimental insertions. The design
    specifications are the primary deliverables.

5
TC IP1/IP5 MARS15 MODEL UPGRADE
  • Conversion to LHC lattice ver. 6.5
  • Update of layout, dimensions, magnetic field
    maps, beam screen in Q1, cylindrical D1-D2 pipe
  • TAN standalone, with ZDC, with LHCf (if IP1)
  • Implementation of collar shielding A and B, and
    TCT collimators TCL open and closed
  • Upgrade of machine-detector interface (CMS beam
    pipe, blockhouse, its extension into the tunnel
    etc).
  • Extension of the model into arcs (up to IP4IP6)
  • Beam loss patterns from IP3/IP7 (Ralf Assmann),
    and beam-gas

6
IP5 TCT TERTIARY COLLIMATORS MARS15 STUDIES

1. Outgoing beam TCTs are pretty radioactive
(especially if made of tungsten) and
interfere with the TOTEM first station XRP1 at
146 m. 2. Incoming beam preliminary results for
beam-gas are encouraging. 3. On September 30,
2005, Ralph Assmann provided beam loss patterns
from IP7 betatron cleaning for BEAM1 its
contribution at IP5 is negligible. 4. Desperately
waiting for BEAM1 (momentum) and especially for
BEAM2 (momentum and betatron) Ralph says we
will get it this month. (!)
7
TertCollim Issues/Plans
  • Need input from Ralph ASAP
  • - its not the first time obviously a
    communication issue
  • As soon as beam loss input files received ? 2
    mos to finish most work on TCT
  • If no surprizes task can be closed 1/2 yr
Write a Comment
User Comments (0)
About PowerShow.com