Linac Beam Demands - PowerPoint PPT Presentation

1 / 2
About This Presentation
Title:

Linac Beam Demands

Description:

Linac beam demands are characterized by cycles (or percent of time), not by intensity ... NOTE: Arlene Lennox has not yet been interviewed. February 27, 2003 ... – PowerPoint PPT presentation

Number of Views:23
Avg rating:3.0/5.0
Slides: 3
Provided by: fin2
Category:
Tags: beam | demands | lennox | linac

less

Transcript and Presenter's Notes

Title: Linac Beam Demands


1
Linac Beam Demands
  • Linac beam demands are characterized by cycles
    (or percent of time), not by intensity
  • But there can be NTF related rush hours
  • Caused by need to keep beam treatment time
    minimum
  • These have been handled within the Beams Division
    so far (mostly)
  • And some changes are in the works as we speak.
    (No notes!)
  • Have held the beam switch in extreme cases (0 in
    last 2 years).
  • NOTE Arlene Lennox has not yet been interviewed.

2
Summary of Linac
  • Radiation Limitations (none foreseen before 2010)
  • At the moment most of Linac galleries are
    unlimited occupancy. This may need to be changed
    to limited occupancy as the number of 400 MeV
    cycles is increased with NuMI Run II plus
    MiniBooNE plus
  • The Booster limits the Linac for 400 MeV beam
  • Also, at the moment there is a vestige of the
    Main Ring buried in the Proton Source which
    prevents more than 13 linac cycles in a row of
    beam destined for 8 GeV. It can be removed.
  • The Linac can run
  • Run II and MiniBooNE and NuMI and NTF and MUCOOL
    and Beam Maintenance
  • The Linac can run better with modifications.
Write a Comment
User Comments (0)
About PowerShow.com